Information
-
Project Title:
-
Project / Work Order No.:
-
Principal Contractor:
-
Address:
-
Person in Control of Site:
-
Person Carrying Out Inspection:
-
Visit No:
-
Conducted on
-
Construction (Design and Management) Regulations 2015
Number of Visits by Authorities (Since the last inspection)
-
HSE:
- 0
- 1
- 2
- 3
- 4
- 5
-
Local Authority:
- 0
- 1
- 2
- 3
- 4
- 5
-
Fire Authority:
- 0
- 1
- 2
- 3
- 4
- 5
-
Police:
- 0
- 1
- 2
- 3
- 4
- 5
-
Other
- 0
- 1
- 2
- 3
- 4
- 5
Accident Summary (Since the last inspection)
-
Fatality:
- 0
- 1
- 2
- 3
- 4
- 5
-
Major Injury:
- 0
- 1
- 2
- 3
- 4
- 5
-
Over 7 Day Loss Time Injury:
- 0
- 1
- 2
- 3
- 4
- 5
-
Over 3 Day Loss Time Injury:
- 0
- 1
- 2
- 3
- 4
- 5
-
1-3 Days Day Loss Time Injury:
- 0
- 1
- 2
- 3
- 4
- 5
-
First Aid Only / No Loss Time:
- 0
- 1
- 2
- 3
- 4
- 5
-
Dangerous Occurrence:
- 0
- 1
- 2
- 3
- 4
- 5
-
Near Miss/ Unsafe Condition / Unsafe Act:
- 0
- 1
- 2
- 3
- 4
- 5
-
Other:
- 0
- 1
- 2
- 3
- 4
- 5
-
Ratings
Documentation and Site Set Up
-
1. Construction Phase Plan
-
2. Fire & Emergency Plan
-
3. Traffic Management Plan
-
4. Lifting Plan
-
5. Asbestos Management Plan
-
6. Health & Safety Policy
-
7. CDM Notification
-
8. Statutory Notices
-
9. Induction Training
-
10. Risk Assessments
-
11. Method Statements
-
12. Arrangements for Monitoring
-
13. Accident Reporting
-
14. First Aid
-
15. Notices & Signs
-
16. H&S Information
-
17. Registers & Permits
-
18. Welfare Facilities
-
19. Site Security
-
20. Training/Competence
-
21. Other
Site Activities :
-
22. PPE
-
23. Fire Prevention/Protection
-
24. Storage Arrangements
-
25. Lifting Operations/Equip.
-
26. Manual Handling
-
27. Traffic Management
-
28. Work at Height
-
29. Edge Protection
-
30. Scaffolding/Scaffold Towers
-
31. Services (Overhead/Underground)
-
32. Access/Egress
-
33. Hazardous Substances
-
34. Environmental
-
35. Noise / Vibration
-
36. Lighting
-
37. Electricity
-
38. Housekeeping
-
39. Plant & Equipment
-
40. Excavations
-
41. Roadworks
-
42. Demolition
-
43. Confined Space Work
-
44. Protection of the Public
-
45. Other
Non - Conformance:
-
1) Non - Conformance
-
Category:
- 1. Construction Phase Plan
- 2. Fire & Emergency Plan
- 3. Traffic Management Plan
- 4. Lifting Plan
- 5. Asbestos Management Plan
- 6. Health & Safety Policy
- 7. CDM Notification
- 8. Statutory Notices
- 9. Induction Training
- 10. Risk Assessments
- 11. Method Statements
- 12. Monitoring Arrangements
- 13. Accident Reporting
- 14. First Aid
- 15. Notices & Signs
- 16. H&S Information
- 17. Registers & Permits
- 18. Welfare Facilities
- 19. Site Security
- 20. Training/Competence
- 21.Other
- 22. PPE
- 23. Fire Prevention/Protection
- 24. Storage Arrangements
- 25. Lifting Operations/Equip.
- 26. Manual Handling
- 27. Traffic Management
- 28. Work at Height
- 29. Edge Protection
- 30. Scaffolding/Scaffold Towers
- 31. Services (Overhead/Underground)
- 32. Access/Egress
- 33. Hazardous Substances
- 34. Environmental
- 35. Noise / Vibration
- 36. Lighting
- 37. Electricity
- 38. Housekeeping
- 39. Plant & Equipment
- 40. Excavations
- 41. Roadworks
- 42. Demolition
- 43. Confined Space Work
- 44. Protection of the Public
- 45. Other
-
Details of Non-conformance:
-
Primary Root Cause
- Assessment of Risk
- Behaviour
- Communications
- Competence & Training
- Management Systems
- Managing People
- Mental Condition
- Personal Condition
- Plant, Tools & Equipment
-
Root Cause
- All hazards identified and assessed
- Appropriate standards not adopted
- Control measures adequately controlled the risk
- Control measures inadequately defined
- Hazards not identified
- Incorrect standards advised
- Unsafe or inadequate design
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
- Inadequate change management process
- Inadequate enforcement of Safe System of Work
- Inadequate implementation of Safe System of Work
- Inadequate work instructions
- Inadequate work planning
- Incorrect or unapproved documentation
- No or inadequate Safe System of Work
- Not able to follow Safe System of Work
- Not following Safe System of Work
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
2) Non - Conformance
-
Category:
- 1. Construction Phase Plan
- 2. Fire & Emergency Plan
- 3. Traffic Management Plan
- 4. Lifting Plan
- 5. Asbestos Management Plan
- 6. Health & Safety Policy
- 7. CDM Notification
- 8. Statutory Notices
- 9. Induction Training
- 10. Risk Assessments
- 11. Method Statements
- 12. Monitoring Arrangements
- 13. Accident Reporting
- 14. First Aid
- 15. Notices & Signs
- 16. H&S Information
- 17. Registers & Permits
- 18. Welfare Facilities
- 19. Site Security
- 20. Training/Competence
- 21.Other
- 22. PPE
- 23. Fire Prevention/Protection
- 24. Storage Arrangements
- 25. Lifting Operations/Equip.
- 26. Manual Handling
- 27. Traffic Management
- 28. Work at Height
- 29. Edge Protection
- 30. Scaffolding/Scaffold Towers
- 31. Services (Overhead/Underground)
- 32. Access/Egress
- 33. Hazardous Substances
- 34. Environmental
- 35. Noise / Vibration
- 36. Lighting
- 37. Electricity
- 38. Housekeeping
- 39. Plant & Equipment
- 40. Excavations
- 41. Roadworks
- 42. Demolition
- 43. Confined Space Work
- 44. Protection of the Public
- 45. Other
-
Details of Non-conformance:
-
Primary Root Cause
- Assessment of Risk
- Behaviour
- Communications
- Competence & Training
- Management Systems
- Managing People
- Mental Condition
- Personal Condition
- Plant, Tools & Equipment
-
Root Cause
- All hazards identified and assessed
- Appropriate standards not adopted
- Control measures adequately controlled the risk
- Control measures inadequately defined
- Hazards not identified
- Incorrect standards advised
- Unsafe or inadequate design
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
- Inadequate change management process
- Inadequate enforcement of Safe System of Work
- Inadequate implementation of Safe System of Work
- Inadequate work instructions
- Inadequate work planning
- Incorrect or unapproved documentation
- No or inadequate Safe System of Work
- Not able to follow Safe System of Work
- Not following Safe System of Work
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
3) Non - Conformance
-
Category:
- 1. Construction Phase Plan
- 2. Fire & Emergency Plan
- 3. Traffic Management Plan
- 4. Lifting Plan
- 5. Asbestos Management Plan
- 6. Health & Safety Policy
- 7. CDM Notification
- 8. Statutory Notices
- 9. Induction Training
- 10. Risk Assessments
- 11. Method Statements
- 12. Monitoring Arrangements
- 13. Accident Reporting
- 14. First Aid
- 15. Notices & Signs
- 16. H&S Information
- 17. Registers & Permits
- 18. Welfare Facilities
- 19. Site Security
- 20. Training/Competence
- 21.Other
- 22. PPE
- 23. Fire Prevention/Protection
- 24. Storage Arrangements
- 25. Lifting Operations/Equip.
- 26. Manual Handling
- 27. Traffic Management
- 28. Work at Height
- 29. Edge Protection
- 30. Scaffolding/Scaffold Towers
- 31. Services (Overhead/Underground)
- 32. Access/Egress
- 33. Hazardous Substances
- 34. Environmental
- 35. Noise / Vibration
- 36. Lighting
- 37. Electricity
- 38. Housekeeping
- 39. Plant & Equipment
- 40. Excavations
- 41. Roadworks
- 42. Demolition
- 43. Confined Space Work
- 44. Protection of the Public
- 45. Other
-
Details of Non-conformance:
-
Primary Root Cause
- Assessment of Risk
- Behaviour
- Communications
- Competence & Training
- Management Systems
- Managing People
- Mental Condition
- Personal Condition
- Plant, Tools & Equipment
-
Root Cause
- All hazards identified and assessed
- Appropriate standards not adopted
- Control measures adequately controlled the risk
- Control measures inadequately defined
- Hazards not identified
- Incorrect standards advised
- Unsafe or inadequate design
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
- Inadequate change management process
- Inadequate enforcement of Safe System of Work
- Inadequate implementation of Safe System of Work
- Inadequate work instructions
- Inadequate work planning
- Incorrect or unapproved documentation
- No or inadequate Safe System of Work
- Not able to follow Safe System of Work
- Not following Safe System of Work
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
4) Non - Conformance
-
Category:
- 1. Construction Phase Plan
- 2. Fire & Emergency Plan
- 3. Traffic Management Plan
- 4. Lifting Plan
- 5. Asbestos Management Plan
- 6. Health & Safety Policy
- 7. CDM Notification
- 8. Statutory Notices
- 9. Induction Training
- 10. Risk Assessments
- 11. Method Statements
- 12. Monitoring Arrangements
- 13. Accident Reporting
- 14. First Aid
- 15. Notices & Signs
- 16. H&S Information
- 17. Registers & Permits
- 18. Welfare Facilities
- 19. Site Security
- 20. Training/Competence
- 21.Other
- 22. PPE
- 23. Fire Prevention/Protection
- 24. Storage Arrangements
- 25. Lifting Operations/Equip.
- 26. Manual Handling
- 27. Traffic Management
- 28. Work at Height
- 29. Edge Protection
- 30. Scaffolding/Scaffold Towers
- 31. Services (Overhead/Underground)
- 32. Access/Egress
- 33. Hazardous Substances
- 34. Environmental
- 35. Noise / Vibration
- 36. Lighting
- 37. Electricity
- 38. Housekeeping
- 39. Plant & Equipment
- 40. Excavations
- 41. Roadworks
- 42. Demolition
- 43. Confined Space Work
- 44. Protection of the Public
- 45. Other
-
Details of Non-conformance:
-
Primary Root Cause
- Assessment of Risk
- Behaviour
- Communications
- Competence & Training
- Management Systems
- Managing People
- Mental Condition
- Personal Condition
- Plant, Tools & Equipment
-
Root Cause
- All hazards identified and assessed
- Appropriate standards not adopted
- Control measures adequately controlled the risk
- Control measures inadequately defined
- Hazards not identified
- Incorrect standards advised
- Unsafe or inadequate design
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
- Inadequate change management process
- Inadequate enforcement of Safe System of Work
- Inadequate implementation of Safe System of Work
- Inadequate work instructions
- Inadequate work planning
- Incorrect or unapproved documentation
- No or inadequate Safe System of Work
- Not able to follow Safe System of Work
- Not following Safe System of Work
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
5) Non - Conformance
-
Category:
- 1. Construction Phase Plan
- 2. Fire & Emergency Plan
- 3. Traffic Management Plan
- 4. Lifting Plan
- 5. Asbestos Management Plan
- 6. Health & Safety Policy
- 7. CDM Notification
- 8. Statutory Notices
- 9. Induction Training
- 10. Risk Assessments
- 11. Method Statements
- 12. Monitoring Arrangements
- 13. Accident Reporting
- 14. First Aid
- 15. Notices & Signs
- 16. H&S Information
- 17. Registers & Permits
- 18. Welfare Facilities
- 19. Site Security
- 20. Training/Competence
- 21.Other
- 22. PPE
- 23. Fire Prevention/Protection
- 24. Storage Arrangements
- 25. Lifting Operations/Equip.
- 26. Manual Handling
- 27. Traffic Management
- 28. Work at Height
- 29. Edge Protection
- 30. Scaffolding/Scaffold Towers
- 31. Services (Overhead/Underground)
- 32. Access/Egress
- 33. Hazardous Substances
- 34. Environmental
- 35. Noise / Vibration
- 36. Lighting
- 37. Electricity
- 38. Housekeeping
- 39. Plant & Equipment
- 40. Excavations
- 41. Roadworks
- 42. Demolition
- 43. Confined Space Work
- 44. Protection of the Public
- 45. Other
-
Details of Non-conformance:
-
Primary Root Cause
- Assessment of Risk
- Behaviour
- Communications
- Competence & Training
- Management Systems
- Managing People
- Mental Condition
- Personal Condition
- Plant, Tools & Equipment
-
Root Cause
- All hazards identified and assessed
- Appropriate standards not adopted
- Control measures adequately controlled the risk
- Control measures inadequately defined
- Hazards not identified
- Incorrect standards advised
- Unsafe or inadequate design
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
- Inadequate change management process
- Inadequate enforcement of Safe System of Work
- Inadequate implementation of Safe System of Work
- Inadequate work instructions
- Inadequate work planning
- Incorrect or unapproved documentation
- No or inadequate Safe System of Work
- Not able to follow Safe System of Work
- Not following Safe System of Work
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
6) Non - Conformance
-
Category:
- 1. Construction Phase Plan
- 2. Fire & Emergency Plan
- 3. Traffic Management Plan
- 4. Lifting Plan
- 5. Asbestos Management Plan
- 6. Health & Safety Policy
- 7. CDM Notification
- 8. Statutory Notices
- 9. Induction Training
- 10. Risk Assessments
- 11. Method Statements
- 12. Monitoring Arrangements
- 13. Accident Reporting
- 14. First Aid
- 15. Notices & Signs
- 16. H&S Information
- 17. Registers & Permits
- 18. Welfare Facilities
- 19. Site Security
- 20. Training/Competence
- 21.Other
- 22. PPE
- 23. Fire Prevention/Protection
- 24. Storage Arrangements
- 25. Lifting Operations/Equip.
- 26. Manual Handling
- 27. Traffic Management
- 28. Work at Height
- 29. Edge Protection
- 30. Scaffolding/Scaffold Towers
- 31. Services (Overhead/Underground)
- 32. Access/Egress
- 33. Hazardous Substances
- 34. Environmental
- 35. Noise / Vibration
- 36. Lighting
- 37. Electricity
- 38. Housekeeping
- 39. Plant & Equipment
- 40. Excavations
- 41. Roadworks
- 42. Demolition
- 43. Confined Space Work
- 44. Protection of the Public
- 45. Other
-
Details of Non-conformance:
-
Primary Root Cause
- Assessment of Risk
- Behaviour
- Communications
- Competence & Training
- Management Systems
- Managing People
- Mental Condition
- Personal Condition
- Plant, Tools & Equipment
-
Root Cause
- All hazards identified and assessed
- Appropriate standards not adopted
- Control measures adequately controlled the risk
- Control measures inadequately defined
- Hazards not identified
- Incorrect standards advised
- Unsafe or inadequate design
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
- Inadequate change management process
- Inadequate enforcement of Safe System of Work
- Inadequate implementation of Safe System of Work
- Inadequate work instructions
- Inadequate work planning
- Incorrect or unapproved documentation
- No or inadequate Safe System of Work
- Not able to follow Safe System of Work
- Not following Safe System of Work
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
7) Non - Conformance
-
Category:
- 1. Construction Phase Plan
- 2. Fire & Emergency Plan
- 3. Traffic Management Plan
- 4. Lifting Plan
- 5. Asbestos Management Plan
- 6. Health & Safety Policy
- 7. CDM Notification
- 8. Statutory Notices
- 9. Induction Training
- 10. Risk Assessments
- 11. Method Statements
- 12. Monitoring Arrangements
- 13. Accident Reporting
- 14. First Aid
- 15. Notices & Signs
- 16. H&S Information
- 17. Registers & Permits
- 18. Welfare Facilities
- 19. Site Security
- 20. Training/Competence
- 21.Other
- 22. PPE
- 23. Fire Prevention/Protection
- 24. Storage Arrangements
- 25. Lifting Operations/Equip.
- 26. Manual Handling
- 27. Traffic Management
- 28. Work at Height
- 29. Edge Protection
- 30. Scaffolding/Scaffold Towers
- 31. Services (Overhead/Underground)
- 32. Access/Egress
- 33. Hazardous Substances
- 34. Environmental
- 35. Noise / Vibration
- 36. Lighting
- 37. Electricity
- 38. Housekeeping
- 39. Plant & Equipment
- 40. Excavations
- 41. Roadworks
- 42. Demolition
- 43. Confined Space Work
- 44. Protection of the Public
- 45. Other
-
Details of Non-conformance:
-
Primary Root Cause
- Assessment of Risk
- Behaviour
- Communications
- Competence & Training
- Management Systems
- Managing People
- Mental Condition
- Personal Condition
- Plant, Tools & Equipment
-
Root Cause
- All hazards identified and assessed
- Appropriate standards not adopted
- Control measures adequately controlled the risk
- Control measures inadequately defined
- Hazards not identified
- Incorrect standards advised
- Unsafe or inadequate design
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
- Inadequate change management process
- Inadequate enforcement of Safe System of Work
- Inadequate implementation of Safe System of Work
- Inadequate work instructions
- Inadequate work planning
- Incorrect or unapproved documentation
- No or inadequate Safe System of Work
- Not able to follow Safe System of Work
- Not following Safe System of Work
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
8) Non - Conformance
-
Category:
- 1. Construction Phase Plan
- 2. Fire & Emergency Plan
- 3. Traffic Management Plan
- 4. Lifting Plan
- 5. Asbestos Management Plan
- 6. Health & Safety Policy
- 7. CDM Notification
- 8. Statutory Notices
- 9. Induction Training
- 10. Risk Assessments
- 11. Method Statements
- 12. Monitoring Arrangements
- 13. Accident Reporting
- 14. First Aid
- 15. Notices & Signs
- 16. H&S Information
- 17. Registers & Permits
- 18. Welfare Facilities
- 19. Site Security
- 20. Training/Competence
- 21.Other
- 22. PPE
- 23. Fire Prevention/Protection
- 24. Storage Arrangements
- 25. Lifting Operations/Equip.
- 26. Manual Handling
- 27. Traffic Management
- 28. Work at Height
- 29. Edge Protection
- 30. Scaffolding/Scaffold Towers
- 31. Services (Overhead/Underground)
- 32. Access/Egress
- 33. Hazardous Substances
- 34. Environmental
- 35. Noise / Vibration
- 36. Lighting
- 37. Electricity
- 38. Housekeeping
- 39. Plant & Equipment
- 40. Excavations
- 41. Roadworks
- 42. Demolition
- 43. Confined Space Work
- 44. Protection of the Public
- 45. Other
-
Details of Non-conformance:
-
Primary Root Cause
- Assessment of Risk
- Behaviour
- Communications
- Competence & Training
- Management Systems
- Managing People
- Mental Condition
- Personal Condition
- Plant, Tools & Equipment
-
Root Cause
- All hazards identified and assessed
- Appropriate standards not adopted
- Control measures adequately controlled the risk
- Control measures inadequately defined
- Hazards not identified
- Incorrect standards advised
- Unsafe or inadequate design
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
- Inadequate change management process
- Inadequate enforcement of Safe System of Work
- Inadequate implementation of Safe System of Work
- Inadequate work instructions
- Inadequate work planning
- Incorrect or unapproved documentation
- No or inadequate Safe System of Work
- Not able to follow Safe System of Work
- Not following Safe System of Work
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
9) Non - Conformance
-
Category:
- 1. Construction Phase Plan
- 2. Fire & Emergency Plan
- 3. Traffic Management Plan
- 4. Lifting Plan
- 5. Asbestos Management Plan
- 6. Health & Safety Policy
- 7. CDM Notification
- 8. Statutory Notices
- 9. Induction Training
- 10. Risk Assessments
- 11. Method Statements
- 12. Monitoring Arrangements
- 13. Accident Reporting
- 14. First Aid
- 15. Notices & Signs
- 16. H&S Information
- 17. Registers & Permits
- 18. Welfare Facilities
- 19. Site Security
- 20. Training/Competence
- 21.Other
- 22. PPE
- 23. Fire Prevention/Protection
- 24. Storage Arrangements
- 25. Lifting Operations/Equip.
- 26. Manual Handling
- 27. Traffic Management
- 28. Work at Height
- 29. Edge Protection
- 30. Scaffolding/Scaffold Towers
- 31. Services (Overhead/Underground)
- 32. Access/Egress
- 33. Hazardous Substances
- 34. Environmental
- 35. Noise / Vibration
- 36. Lighting
- 37. Electricity
- 38. Housekeeping
- 39. Plant & Equipment
- 40. Excavations
- 41. Roadworks
- 42. Demolition
- 43. Confined Space Work
- 44. Protection of the Public
- 45. Other
-
Details of Non-conformance:
-
Primary Root Cause
- Assessment of Risk
- Behaviour
- Communications
- Competence & Training
- Management Systems
- Managing People
- Mental Condition
- Personal Condition
- Plant, Tools & Equipment
-
Root Cause
- All hazards identified and assessed
- Appropriate standards not adopted
- Control measures adequately controlled the risk
- Control measures inadequately defined
- Hazards not identified
- Incorrect standards advised
- Unsafe or inadequate design
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
- Inadequate change management process
- Inadequate enforcement of Safe System of Work
- Inadequate implementation of Safe System of Work
- Inadequate work instructions
- Inadequate work planning
- Incorrect or unapproved documentation
- No or inadequate Safe System of Work
- Not able to follow Safe System of Work
- Not following Safe System of Work
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
10) Non - Conformance
-
Category:
- 1. Construction Phase Plan
- 2. Fire & Emergency Plan
- 3. Traffic Management Plan
- 4. Lifting Plan
- 5. Asbestos Management Plan
- 6. Health & Safety Policy
- 7. CDM Notification
- 8. Statutory Notices
- 9. Induction Training
- 10. Risk Assessments
- 11. Method Statements
- 12. Monitoring Arrangements
- 13. Accident Reporting
- 14. First Aid
- 15. Notices & Signs
- 16. H&S Information
- 17. Registers & Permits
- 18. Welfare Facilities
- 19. Site Security
- 20. Training/Competence
- 21.Other
- 22. PPE
- 23. Fire Prevention/Protection
- 24. Storage Arrangements
- 25. Lifting Operations/Equip.
- 26. Manual Handling
- 27. Traffic Management
- 28. Work at Height
- 29. Edge Protection
- 30. Scaffolding/Scaffold Towers
- 31. Services (Overhead/Underground)
- 32. Access/Egress
- 33. Hazardous Substances
- 34. Environmental
- 35. Noise / Vibration
- 36. Lighting
- 37. Electricity
- 38. Housekeeping
- 39. Plant & Equipment
- 40. Excavations
- 41. Roadworks
- 42. Demolition
- 43. Confined Space Work
- 44. Protection of the Public
- 45. Other
-
Details of Non-conformance:
-
Primary Root Cause
- Assessment of Risk
- Behaviour
- Communications
- Competence & Training
- Management Systems
- Managing People
- Mental Condition
- Personal Condition
- Plant, Tools & Equipment
-
Root Cause
- All hazards identified and assessed
- Appropriate standards not adopted
- Control measures adequately controlled the risk
- Control measures inadequately defined
- Hazards not identified
- Incorrect standards advised
- Unsafe or inadequate design
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
- Inadequate change management process
- Inadequate enforcement of Safe System of Work
- Inadequate implementation of Safe System of Work
- Inadequate work instructions
- Inadequate work planning
- Incorrect or unapproved documentation
- No or inadequate Safe System of Work
- Not able to follow Safe System of Work
- Not following Safe System of Work
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
-
Root Cause
-
Actions:
-
Add media
Comments:
-
General Comments:
Distribution:
-
Distribution List: