Information
-
Property / Project ID:
-
Site / Project PM
-
Conducted on
-
Audit Completed by
-
Who is onsite
-
Location
-
General Comments
Assessing Critical Risks
-
Attention: The assessment and reporting on the managing critical risks (contained in this page) is a concept that is being trialled if you have any questions or suggestions please forward them to daniel.manchester@arrowinternational.co.nz
Fall From Height
-
Is this Critical Risk present during todays work activities
-
Has the risk been identified
-
Has it been controlled effectively?
-
Has the risk and controls been communicated before the Critical Risk activity(e.g. Toolbox talks, Task analysis, Hazard board)
-
COMPETENCY - is each worker doing Critical Risk work competent or being trained and supervised (Training and competence register, qualifications, verbal).
Asbestos
-
Is this Critical Risk present during todays work activities
-
Has the risk been identified
-
Has it been controlled effectively?
-
Has the risk and controls been communicated before the Critical Risk activity(e.g. Toolbox talks, Task analysis, Hazard board)
-
COMPETENCY - is each worker doing Critical Risk work competent or being trained and supervised (Training and competence register, qualifications, verbal).
Electrical Danger
-
Is this Critical Risk present during todays work activities
-
Has the risk been identified
-
Has it been controlled effectively?
-
Has it been communicated (e.g. Toolbox talks, Task analysis, Hazard register)
-
Has the Main Contractor monitored site behaviour to ensure the above (site inspection)
Power Tools
-
Is this Critical Risk present during todays work activities
-
Has the risk been identified
-
Has it been controlled effectively?
-
Has the risk and controls been communicated before the Critical Risk activity(e.g. Toolbox talks, Task analysis, Hazard board)
Mobile Plant
-
Is this Critical Risk present during todays work activities
-
Has the risk been identified
-
Has it been controlled effectively?
-
Has it been communicated (e.g. Toolbox talks, Task analysis, Hazard register)
-
COMPETENCY - is each worker doing Critical Risk work competent or being trained and supervised (Training and competence register, qualifications, verbal).
Dust / Silica (respirable dust)
-
Is this Critical Risk present during todays work activities
-
Has the risk been identified
-
Has it been controlled effectively?
-
Has the risk and controls been communicated before the Critical Risk activity(e.g. Toolbox talks, Task analysis, Hazard board)
Slips, Trips & Falls
-
Is this Critical Risk present during todays work activities
-
Has the risk been identified
-
Has it been controlled effectively?
-
Has the risk and controls been communicated before the Critical Risk activity(e.g. Toolbox talks, Task analysis, Hazard board)
Excavations
-
Is this Critical Risk present during todays work activities
-
Has the risk been identified
-
Has it been controlled effectively?
-
Has the risk and controls been communicated before the Critical Risk activity(e.g. Toolbox talks, Task analysis, Hazard board)
Managing Critical Risks
-
Has the Main Contractor monitored site behaviour to ensure critical risk controls are in place (e.g. site inspection
-
Has the Main Contractor managed all Critical Risks on this site? (If any of the Risk Assessment questions are failed the answer is No)
Arrival on Site
Arrival Onsite
-
Photo of site frontage / entry
-
SITE FENCING - in place, clear of public access ways, secured with clamps, padlocked when workers not on site.
-
Corrective Action Notice required for SITE FENCING FAILURE
-
RISK BOARD - visible at entry, updated, current critical tasks, controls, PPE, and site supervisor contact details.
-
INDUCTION - site specific; active - inducted by contractor without prompting; escorts for visitors; signage; PPE, and induction / sign-in
-
EMERGENCIES - Emergency plan, first aid kit, fire extinguisher - readily accessible and current.
House Keeping
-
MATERIALS - stacked away from access and egress areas?
-
Corrective Action Notice required for HOUSEKEEPING FAILURE
-
CONSTRUCTION WASTE - controlled? Rubbished / recycling bins / skips available and in use?
-
VERTICAL REINFORCING BARS AND WARATAHS - capped where there is a risk of impalement?
-
Corrective Action Notice required for HOUSEKEEPING FAILURE
-
HIGH VISIBILITY CLOTHING - mandatory, all people, all sites.
-
Corrective Action Notice required for HOUSEKEEPING FAILURE
-
SAFETY FOOTWEAR - mandatory, all people, all sites.
-
Corrective Action Notice required for HOUSEKEEPING FAILURE
-
POTABLE WATER - available on site for hand-washing and environmental control?
-
TOILET - clean, hand cleaner available, and free of stored site materials or documents?
-
No Animals onsite
SLIPS, TRIPS AND FALLS
-
ACCESS WAYS - (including stairs) clear of slip, trip or fall hazards?
-
Corrective Action Notice required for failing to manage the SLIPS, TRIPS & FALLS critical risk
-
SAFE ACCESS available to work areas e.g. temporary steps for high foundations.
-
Corrective Action Notice required for failing to manage the SLIPS, TRIPS & FALLS critical risk
-
HOLES IN GROUND - Covered when unattended with appropriate material e.g. thick plywood
-
Corrective Action Notice required for failing to manage the SLIPS, TRIPS & FALLS critical risk
Falls from Heights
-
Is any work being or about to be completed at height?
GENERAL
-
FALL EDGES - fitted with guardrails/toeboards
-
Corrective Action Notice required for failing to manage the FALLS FROM HEIGHTS critical risk
-
HOLES AND FLOOR PENETRATIONS - covered and marked?
-
Corrective Action Notice required for failing to manage the FALLS FROM HEIGHTS critical risk
-
FRAMED OUT WINDOW OPENING - secured to prevent risk of fall outwards?
-
Corrective Action Notice required for failing to manage the FALLS FROM HEIGHTS critical risk
-
TEMPORARY EDGE/FALL PROTECTION - on exposed edges of roof
-
Corrective Action Notice required for failing to manage the FALLS FROM HEIGHTS critical risk
-
SAFETY NET SAG - between 5% and 10%? Nets free of people standing in them? Nets free of visible damage? No debris in nets.
-
Corrective Action Notice required for failing to manage the FALLS FROM HEIGHTS critical risk
Ladders and Working Platforms
Step Ladders
-
Are Step Ladders being used?
-
CONDITION - fit-for-use and suitable for the job?
-
Corrective Action Notice required for USE OF STEP LADDER FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk
-
SET UP - on firm level ground; lock / stays bars - in place?
-
Corrective Action Notice required for USE OF STEP LADDER FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk
-
USED APPROPRIATELY - for short term work, no straddling, could step ladder use be avoided?
-
Corrective Action Notice required for USE OF STEP LADDER FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk
Ladders
-
Are ladders being used?
-
INDUSTRIAL STANDARD - and in fit-for-use condition / undamaged?
-
Corrective Action Notice required for USE OF LADDER FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk
-
SET UP - on firm level ground; secured - at top and bottom; ladder angle - 4 up 1 out (4 vertical: 1 horizontal); 1m extension above the step off point?
-
Corrective Action Notice required for USE OF LADDER FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk
-
ACCESS USE ONLY - not used as a work platform?
-
Corrective Action Notice required for USE OF LADDER FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk
Working Platform
-
Are Working Platforms being used onsite?
-
INDUSTRIAL STANDARD - fit for current use / undamaged
-
Corrective Action Notice required for USE OF WORKING PLATFORM FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk
-
SET UP - on firm ground or e.g. thick plywood
-
Corrective Action Notice required for USE OF WORKING PLATFORM FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk
-
USED APPROPRIATELY - only used for the intended purpose e.g. trestle not stool, less than 1m above ground.
-
Corrective Action Notice required for USE OF WORKING PLATFORM FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk
Fixed Scaffold
-
Is fixed Scaffolding being used?
-
Does each individual scaffold have an up to date inspection tag on the ladder access closest to the site entrance?
-
For scaffold over 5m is it inspected every 7 days?
-
Is the scaffolding on firm level footing with baseplates and sole boards (500 L x 200 W x 35 D)? Or under mobile wheels on unstable ground?
-
Corrective Action Notice required for USE OF FIXED SCAFFOLDING FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk
-
Are outriggers fitted and braced where required?
-
Corrective Action Notice required for USE OF FIXED SCAFFOLDING FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk
-
Are scaffold poles capped where required?
-
Corrective Action Notice required for USE OF FIXED SCAFFOLDING FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk
-
Is the swing gate rigged safely and auto closing?
-
Corrective Action Notice required for USE OF FIXED SCAFFOLDING FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk
-
Are ladders secured and extend 1m above the platform (fixed only)
-
Corrective Action Notice required for USE OF FIXED SCAFFOLDING FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk
-
Are guardrails in place between 0.9m-1.1m and is there an intermediate rail at 0.5m fitted?
-
Corrective Action Notice required for USE OF FIXED SCAFFOLDING FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk
-
Are working platforms fully decked and secured with no unsafe protrusions?
-
Corrective Action Notice required for USE OF FIXED SCAFFOLDING FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk
-
Are all toe boards in place on full exterior perimeter and inner with gap >300mm?
-
Corrective Action Notice required for USE OF FIXED SCAFFOLDING FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk
-
Is a risk of fall from the scaffold internally through a window or doorway opening adequately controlled with either scaffold guardrails or timber guardrails?
-
Corrective Action Notice required for USE OF FIXED SCAFFOLDING FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk
Mobile Scaffold
-
Is mobile Scaffolding being used?
-
Is the mobile scaffold on firm stable ground?
-
Corrective Action Notice required for USE OF MOBILE SCAFFOLDING FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk
-
Are wheels locked and turned out on mobile scaffold when being used?
-
Corrective Action Notice required for USE OF MOBILE SCAFFOLDING FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk
-
Are guardrails in place between 0.9m and 1.1m and is there a mid-rail at 0.5m?
-
Corrective Action Notice required for USE OF MOBILE SCAFFOLDING FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk
-
Does the mobile scaffold have appropriate supports based on height to width ratio (3:1 max then outriggers)
-
Corrective Action Notice required for USE OF MOBILE SCAFFOLDING FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk
Harness Use
-
Is Harness work being undertaken?
-
WORKERS TRAINED - harness users have US15757 or US23229?
-
Corrective Action Notice required for HARNESS USE FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk
-
EMERGENCY RESCUE PLAN / EQUIPMENT - on site, harness specific, > 2 staff on site?
-
Corrective Action Notice required for HARNESS USE FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk
-
TASK ANALYSIS - for use of a harness?
-
Corrective Action Notice required for HARNESS USE FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk
Mobile Elevated Work Platforms (MEWP)
-
Are Mobile Elevated Work Platforms being used?
-
Is the MEWP set up on firm level ground? (Scissor lift)
-
Corrective Action Notice required for USE OF MEWP FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk
-
OUTRIGGERS - fully extended?
-
Corrective Action Notice required for USE OF MEWP FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk
-
Has the MEWP base been isolated by a barrier (not cones)?
-
Corrective Action Notice required for USE OF MEWP FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk
-
RESCUE PLAN - available and second competent person on site? (Discuss with operator.)
-
Corrective Action Notice required for USE OF MEWP FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk
Asbestos, Asbestos Containing Material (ACM)
-
Is this a repair or demolition site - Asbestos testing required?
-
Have survey and tests for asbestos been conducted, and are the results available on site?
-
Corrective Action Notice required for failing to manage the ASBESTOS critical risk
-
CLEARANCE CERTIFICATE - if ACM has been removed is there a certificate on site? No work to start until clearance obtained
-
Corrective Action Notice required for failing to manage the ASBESTOS critical risk
-
Is the site free of asbestos waste after removal work?
-
Corrective Action Notice required for failing to manage the ASBESTOS critical risk
-
Where ACM is present in structures, is it kept intact to prevent it becoming friable?
-
Corrective Action Notice required for failing to manage the ASBESTOS critical risk
Electrical Danger
-
Electricity used?
-
Has temporary power been established, with RCD protection, and within site fencing?
-
Corrective Action Notice required for failing to manage the ELECTRICAL DANGER critical risk
-
Are electrical tools and leads free from damage and tagged (required every 3 months)?
-
Corrective Action Notice required for failing to manage the ELECTRICAL DANGER critical risk
-
Are RCDs being used?
-
Corrective Action Notice required for failing to manage the ELECTRICAL DANGER critical risk
-
REPAIRS: EXISTING MAIN SWITCHBOARD ISOLATED with electrical isolation tag signed by a registered electrician?
-
Corrective Action Notice required for failing to manage the ELECTRICAL DANGER critical risk
POWER TOOLS
-
Power tools are being used onsite?
-
POWER TOOLS - free from damage?
-
Corrective Action Notice required for failing to manage the POWER TOOLS critical risk
-
GUARDS - fitted on power tools where required, and used? e.g. grinders, drop saws, skillsaws.
-
Corrective Action Notice required for failing to manage the POWER TOOLS critical risk
-
HEARING PROTECTION USED - noise over 85DB, check labels on tool
-
Corrective Action Notice required for failing to manage the POWER TOOLS critical risk
-
EYE PROTECTION USED - projectile risk, check labels on tool
-
Corrective Action Notice required for failing to manage the POWER TOOLS critical risk
POWDER ACTUATED HAND HELD TOOLS (PAT)
-
Are powder actuated hand held tools being used?
-
CERTIFICATE OF COMPETENCE - for operator from the manufacturer or agent?
-
Corrective Action Notice required for USE OF PAT FAILURE and failing to manage the POWER TOOLS critical risk
-
SIGNAGE POSTED AT WORK AREA - (caution: explosive-powered tool in use), people cleared from firing zone?
-
Corrective Action Notice required for USE OF PAT FAILURE and failing to manage the POWER TOOLS critical risk
-
HEARING PROTECTION USED - noise over 85DB, check labels on tool
-
Corrective Action Notice required for USE OF PAT FAILURE and failing to manage the POWER TOOLS critical risk
-
EYE PROTECTION USED - projectile risk, check labels on tool
-
Corrective Action Notice required for USE OF PAT FAILURE and failing to manage the POWER TOOLS critical risk
Mobile Plant
-
Is Mobile Plant being used?
-
COMPETENT OPERATOR - experience on the specific machine and site conditions, training, licences (e.g. WTR endorsements).
-
Corrective Action Notice required for failing to manage the MOBILE PLANT critical risk
-
FALLING OBJECTS - hard hats worn where risk of falling object e.g. excavator swing zone.
-
Corrective Action Notice required for failing to manage the MOBILE PLANT critical risk
TRAFFIC MANAGEMENT
-
Are vehicle movements entering and exiting the site being controlled to prevent risk to workers, footpath users and other road users?
-
Is a Traffic Management Plan (TMP) as per the Code of Practice for Temporary Traffic Management needed for this site?
-
Are the Traffic Management measures and signage set up as per the TMP?
-
Corrective Action Notice required for TRAFFICE MANAGEMNT FAILURE
CRANES
-
Cranes used onsite?
-
Does the lift safety zone have an effective isolation barrier?
-
Corrective Action Notice required for USE OF CRANES FAILURE and failing to manage the MOBILE PLANT critical risk
-
LIFTING PLAN - included in site documentation?
-
Corrective Action Notice required for USE OF CRANES FAILURE and failing to manage the MOBILE PLANT critical risk
EXCAVATORS
-
Are excavators being used?
-
MIRROS & AUDIBLE ALARMS - in good condition and in use where fitted?
-
Corrective Action Notice required for USE OF EXCAVATORS FAILURE and failing to manage the MOBILE PLANT critical risk
-
EXCLUSION ZONE - in place around excavator, and/or spotter ? demolition site fence and gate closed while machine operating?
-
Corrective Action Notice required for USE OF EXCAVATORS FAILURE and failing to manage the MOBILE PLANT critical risk
-
ROLL OVER PROTECTIVE STRUCTURE (ROPS) - where uneven ground, next to trench / incline?
-
Corrective Action Notice required for USE OF EXCAVATORS FAILURE and failing to manage the MOBILE PLANT critical risk
-
SEATBELT - operational and being used?
-
Corrective Action Notice required for USE OF EXCAVATORS FAILURE and failing to manage the MOBILE PLANT critical risk
-
QUICK HITCH - to manufacturers specifications, may need to be secured with clip/locking nut when machine in use
-
Corrective Action Notice required for USE OF EXCAVATORS FAILURE and failing to manage the MOBILE PLANT critical risk
-
FIRE EXTINGUISHER AND FIRST AID KIT in cab
-
Corrective Action Notice required for USE OF EXCAVATORS FAILURE and failing to manage the MOBILE PLANT critical risk
CONCRETE PUMPS
-
Are concrete pumps being used?
-
SET UP - outriggers fully extended and on firm footings? Machine operated on level ground? Clear of overhead hazards e.g. power lines?
-
Corrective Action Notice required for USE OF CONCRETE PUMPS FAILURE and failing to manage the MOBILE PLANT critical risk
-
FALLING OBJECTS - hard hats worn when working around pump.
-
Corrective Action Notice required for USE OF CONCRETE PUMPS FAILURE and failing to manage the MOBILE PLANT critical risk
Excavations
-
Excavation and Trench Work being completed onsite?
-
Have underground services been located? (plans, service location)
-
Corrective Action Notice required for failing to manage the EXCAVATIONS critical risk
-
Are excavations or excavated faces battered, benched or shored? (>1.5m deep)
-
Corrective Action Notice required for failing to manage the EXCAVATIONS critical risk
-
Are adequate controls, such as physical barrier, in place to prevent falls into excavations, or from the top of excavated faces, > than 1m?
-
Corrective Action Notice required for failing to manage the EXCAVATIONS critical risk
-
Is there safe access to excavation e.g. ramp or tied off ladder? (trenches >1m deep)
-
Corrective Action Notice required for failing to manage the EXCAVATIONS critical risk
-
Does job method avoid work in unsupported trenches/ excavation?
-
Corrective Action Notice required for failing to manage the EXCAVATIONS critical risk
-
Are materials and spoil stored to prevent edge collapse? (Safe slope + 600mm)
-
Corrective Action Notice required for failing to manage the EXCAVATIONS critical risk
-
Are vehicles and plant at a distance to prevent collapse? (Safe slope + 600mm)
-
Corrective Action Notice required for failing to manage the EXCAVATIONS critical risk
-
Hard hats - worn when risk of falling objects exists?
-
Corrective Action Notice required for failing to manage the EXCAVATIONS critical risk
Respirable Dust & Environmental
DUST, SILICA (RESPIRABLE DUSTS)
-
Present on Site?
-
DUST EXTRACTION EQUIPMENT - on tool or local, fitted / used correctly, effective?
-
Corrective Action Notice required for failing to manage the RESPITABLE DUST critical risk
-
RESPIRATORS - provided, correct type, worn correctly (clean shaven)
-
Corrective Action Notice required for failing to manage the RESPITABLE DUST critical risk
LAND CONTAMINATION
-
NON HAIL SITE - Is there a copy of the Contamination Discovery Protocol (CDP) onsite ? V1.1 11/04/15 (1)
-
Is this a Hail Site?
-
HAIL SITE - Is there signage / notice this is a HAIL Site ?
-
Is there a Site Management Plan (SMP) onsite ?
-
Is the contractor aware of the specific disposal requirements for the soil leaving site ?
-
Are the additional PPE stipulated in the SMP being used correctly ?
-
Are there designated areas / zones as per the SMP ?
ENVIRONMENTAL PROTECTION
-
ENVIRONMENTAL MANAGEMENT PLAN (EMP) - on site and are controls in place as per this plan?
-
PAINT / CONCRETE WASH OFF - Not present
-
MUD, SILT, CONCRETE WASH OFF - Are footpaths, kerbing and road clean
-
NOISE - controlled and kept to a reasonable level?
-
DUST (environmental) - under control?
-
DUST SUPRESSION - Does the contractor have a means of supressing dust at short notice?
-
CHEMICAL CONTROLS - in place e.g. disposal / paint wash?
ARCHAEOLOGICAL
-
If a Low Risk Site is there a copy of the Accidental Discovery Protocol (ADP) on site ? V3.1 11/04/15 (2)
-
If a High Risk Site is there a copy of the HNZ Archaeological Authority on site – relevant to the contractor and scope of work ? (3)
Demolition
-
Demolition work being undertaken onsite?
-
Waste streams sorted and piled?
-
HAZMAT removed or securely stored?
-
Corrective Action Notice required for DEMOLITION FAILURE
-
Sharp and Hazardous waste on site minimised as much as reasonably practicable?
-
Corrective Action Notice required for DEMOLITION FAILURE
-
Evidence power disconnected prior to demolition?
-
Corrective Action Notice required for DEMOLITION FAILURE
-
WorkSafe Notification?
-
Corrective Action Notice required for DEMOLITION FAILURE
-
Copy of CERA Clearance authorisation? (Red zone only)
-
Corrective Action Notice required for DEMOLITION FAILURE
-
Site checked on the LLUR for HAIL? - (remember to complete HAIL questions in Environment Section)
-
Corrective Action Notice required for DEMOLITION FAILURE
Misc
Hazardous Substances and Chemical Handling
-
SAFETY DATA SHEETS (SDS) - for Hazardous and Environmental substances readily available on site?
-
Are hazardous substances and chemicals being controlled including storage, disposal and PPE?
-
RESPIRATORS - provided, correct type, worn correctly (clean shaven)
Site Specific HSE plan
-
Names of contractor (Main or Sub) for each Critical Risk on the site
-
SIGN IN / OUT REGISTER - used and up to date for people currently on site.
-
INCIDENT REGISTER - evidence of use on this site. Discuss near misses.
Site behaviour review
-
Do workers on the site appear to be free of impairment from drugs, alcohol or any other substance?
-
Are workers helpful/ cooperative (not aggressive or confrontational)?
-
Are you comfortable that this site is safe?
-
Does this site need further specialist inspection