Information

  • Property / Project ID:

  • Site / Project PM

  • Conducted on

  • Audit Completed by

  • Who is onsite

  • Location
  • General Comments

Assessing Critical Risks

  • Attention: The assessment and reporting on the managing critical risks (contained in this page) is a concept that is being trialled if you have any questions or suggestions please forward them to daniel.manchester@arrowinternational.co.nz

Fall From Height

  • Is this Critical Risk present during todays work activities

  • Has the risk been identified

  • Has it been controlled effectively?

  • Has the risk and controls been communicated before the Critical Risk activity(e.g. Toolbox talks, Task analysis, Hazard board)

  • COMPETENCY - is each worker doing Critical Risk work competent or being trained and supervised (Training and competence register, qualifications, verbal).

Asbestos

  • Is this Critical Risk present during todays work activities

  • Has the risk been identified

  • Has it been controlled effectively?

  • Has the risk and controls been communicated before the Critical Risk activity(e.g. Toolbox talks, Task analysis, Hazard board)

  • COMPETENCY - is each worker doing Critical Risk work competent or being trained and supervised (Training and competence register, qualifications, verbal).

Electrical Danger

  • Is this Critical Risk present during todays work activities

  • Has the risk been identified

  • Has it been controlled effectively?

  • Has it been communicated (e.g. Toolbox talks, Task analysis, Hazard register)

  • Has the Main Contractor monitored site behaviour to ensure the above (site inspection)

Power Tools

  • Is this Critical Risk present during todays work activities

  • Has the risk been identified

  • Has it been controlled effectively?

  • Has the risk and controls been communicated before the Critical Risk activity(e.g. Toolbox talks, Task analysis, Hazard board)

Mobile Plant

  • Is this Critical Risk present during todays work activities

  • Has the risk been identified

  • Has it been controlled effectively?

  • Has it been communicated (e.g. Toolbox talks, Task analysis, Hazard register)

  • COMPETENCY - is each worker doing Critical Risk work competent or being trained and supervised (Training and competence register, qualifications, verbal).

Dust / Silica (respirable dust)

  • Is this Critical Risk present during todays work activities

  • Has the risk been identified

  • Has it been controlled effectively?

  • Has the risk and controls been communicated before the Critical Risk activity(e.g. Toolbox talks, Task analysis, Hazard board)

Slips, Trips & Falls

  • Is this Critical Risk present during todays work activities

  • Has the risk been identified

  • Has it been controlled effectively?

  • Has the risk and controls been communicated before the Critical Risk activity(e.g. Toolbox talks, Task analysis, Hazard board)

Excavations

  • Is this Critical Risk present during todays work activities

  • Has the risk been identified

  • Has it been controlled effectively?

  • Has the risk and controls been communicated before the Critical Risk activity(e.g. Toolbox talks, Task analysis, Hazard board)

Managing Critical Risks

  • Has the Main Contractor monitored site behaviour to ensure critical risk controls are in place (e.g. site inspection

  • Has the Main Contractor managed all Critical Risks on this site? (If any of the Risk Assessment questions are failed the answer is No)

Arrival on Site

Arrival Onsite

  • Photo of site frontage / entry

  • SITE FENCING - in place, clear of public access ways, secured with clamps, padlocked when workers not on site.

  • Corrective Action Notice required for SITE FENCING FAILURE

  • RISK BOARD - visible at entry, updated, current critical tasks, controls, PPE, and site supervisor contact details.

  • INDUCTION - site specific; active - inducted by contractor without prompting; escorts for visitors; signage; PPE, and induction / sign-in

  • EMERGENCIES - Emergency plan, first aid kit, fire extinguisher - readily accessible and current.

House Keeping

  • MATERIALS - stacked away from access and egress areas?

  • Corrective Action Notice required for HOUSEKEEPING FAILURE

  • CONSTRUCTION WASTE - controlled? Rubbished / recycling bins / skips available and in use?

  • VERTICAL REINFORCING BARS AND WARATAHS - capped where there is a risk of impalement?

  • Corrective Action Notice required for HOUSEKEEPING FAILURE

  • HIGH VISIBILITY CLOTHING - mandatory, all people, all sites.

  • Corrective Action Notice required for HOUSEKEEPING FAILURE

  • SAFETY FOOTWEAR - mandatory, all people, all sites.

  • Corrective Action Notice required for HOUSEKEEPING FAILURE

  • POTABLE WATER - available on site for hand-washing and environmental control?

  • TOILET - clean, hand cleaner available, and free of stored site materials or documents?

  • No Animals onsite

SLIPS, TRIPS AND FALLS

  • ACCESS WAYS - (including stairs) clear of slip, trip or fall hazards?

  • Corrective Action Notice required for failing to manage the SLIPS, TRIPS & FALLS critical risk

  • SAFE ACCESS available to work areas e.g. temporary steps for high foundations.

  • Corrective Action Notice required for failing to manage the SLIPS, TRIPS & FALLS critical risk

  • HOLES IN GROUND - Covered when unattended with appropriate material e.g. thick plywood

  • Corrective Action Notice required for failing to manage the SLIPS, TRIPS & FALLS critical risk

Falls from Heights

  • Is any work being or about to be completed at height?

GENERAL

  • FALL EDGES - fitted with guardrails/toeboards

  • Corrective Action Notice required for failing to manage the FALLS FROM HEIGHTS critical risk

  • HOLES AND FLOOR PENETRATIONS - covered and marked?

  • Corrective Action Notice required for failing to manage the FALLS FROM HEIGHTS critical risk

  • FRAMED OUT WINDOW OPENING - secured to prevent risk of fall outwards?

  • Corrective Action Notice required for failing to manage the FALLS FROM HEIGHTS critical risk

  • TEMPORARY EDGE/FALL PROTECTION - on exposed edges of roof

  • Corrective Action Notice required for failing to manage the FALLS FROM HEIGHTS critical risk

  • SAFETY NET SAG - between 5% and 10%? Nets free of people standing in them? Nets free of visible damage? No debris in nets.

  • Corrective Action Notice required for failing to manage the FALLS FROM HEIGHTS critical risk

Ladders and Working Platforms

Step Ladders

  • Are Step Ladders being used?

  • CONDITION - fit-for-use and suitable for the job?

  • Corrective Action Notice required for USE OF STEP LADDER FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk

  • SET UP - on firm level ground; lock / stays bars - in place?

  • Corrective Action Notice required for USE OF STEP LADDER FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk

  • USED APPROPRIATELY - for short term work, no straddling, could step ladder use be avoided?

  • Corrective Action Notice required for USE OF STEP LADDER FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk

Ladders

  • Are ladders being used?

  • INDUSTRIAL STANDARD - and in fit-for-use condition / undamaged?

  • Corrective Action Notice required for USE OF LADDER FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk

  • SET UP - on firm level ground; secured - at top and bottom; ladder angle - 4 up 1 out (4 vertical: 1 horizontal); 1m extension above the step off point?

  • Corrective Action Notice required for USE OF LADDER FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk

  • ACCESS USE ONLY - not used as a work platform?

  • Corrective Action Notice required for USE OF LADDER FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk

Working Platform

  • Are Working Platforms being used onsite?

  • INDUSTRIAL STANDARD - fit for current use / undamaged

  • Corrective Action Notice required for USE OF WORKING PLATFORM FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk

  • SET UP - on firm ground or e.g. thick plywood

  • Corrective Action Notice required for USE OF WORKING PLATFORM FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk

  • USED APPROPRIATELY - only used for the intended purpose e.g. trestle not stool, less than 1m above ground.

  • Corrective Action Notice required for USE OF WORKING PLATFORM FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk

Fixed Scaffold

  • Is fixed Scaffolding being used?

  • Does each individual scaffold have an up to date inspection tag on the ladder access closest to the site entrance?

  • For scaffold over 5m is it inspected every 7 days?

  • Is the scaffolding on firm level footing with baseplates and sole boards (500 L x 200 W x 35 D)? Or under mobile wheels on unstable ground?

  • Corrective Action Notice required for USE OF FIXED SCAFFOLDING FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk

  • Are outriggers fitted and braced where required?

  • Corrective Action Notice required for USE OF FIXED SCAFFOLDING FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk

  • Are scaffold poles capped where required?

  • Corrective Action Notice required for USE OF FIXED SCAFFOLDING FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk

  • Is the swing gate rigged safely and auto closing?

  • Corrective Action Notice required for USE OF FIXED SCAFFOLDING FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk

  • Are ladders secured and extend 1m above the platform (fixed only)

  • Corrective Action Notice required for USE OF FIXED SCAFFOLDING FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk

  • Are guardrails in place between 0.9m-1.1m and is there an intermediate rail at 0.5m fitted?

  • Corrective Action Notice required for USE OF FIXED SCAFFOLDING FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk

  • Are working platforms fully decked and secured with no unsafe protrusions?

  • Corrective Action Notice required for USE OF FIXED SCAFFOLDING FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk

  • Are all toe boards in place on full exterior perimeter and inner with gap >300mm?

  • Corrective Action Notice required for USE OF FIXED SCAFFOLDING FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk

  • Is a risk of fall from the scaffold internally through a window or doorway opening adequately controlled with either scaffold guardrails or timber guardrails?

  • Corrective Action Notice required for USE OF FIXED SCAFFOLDING FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk

Mobile Scaffold

  • Is mobile Scaffolding being used?

  • Is the mobile scaffold on firm stable ground?

  • Corrective Action Notice required for USE OF MOBILE SCAFFOLDING FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk

  • Are wheels locked and turned out on mobile scaffold when being used?

  • Corrective Action Notice required for USE OF MOBILE SCAFFOLDING FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk

  • Are guardrails in place between 0.9m and 1.1m and is there a mid-rail at 0.5m?

  • Corrective Action Notice required for USE OF MOBILE SCAFFOLDING FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk

  • Does the mobile scaffold have appropriate supports based on height to width ratio (3:1 max then outriggers)

  • Corrective Action Notice required for USE OF MOBILE SCAFFOLDING FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk

Harness Use

  • Is Harness work being undertaken?

  • WORKERS TRAINED - harness users have US15757 or US23229?

  • Corrective Action Notice required for HARNESS USE FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk

  • EMERGENCY RESCUE PLAN / EQUIPMENT - on site, harness specific, > 2 staff on site?

  • Corrective Action Notice required for HARNESS USE FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk

  • TASK ANALYSIS - for use of a harness?

  • Corrective Action Notice required for HARNESS USE FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk

Mobile Elevated Work Platforms (MEWP)

  • Are Mobile Elevated Work Platforms being used?

  • Is the MEWP set up on firm level ground? (Scissor lift)

  • Corrective Action Notice required for USE OF MEWP FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk

  • OUTRIGGERS - fully extended?

  • Corrective Action Notice required for USE OF MEWP FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk

  • Has the MEWP base been isolated by a barrier (not cones)?

  • Corrective Action Notice required for USE OF MEWP FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk

  • RESCUE PLAN - available and second competent person on site? (Discuss with operator.)

  • Corrective Action Notice required for USE OF MEWP FAILURE and failing to manage the FALLS FROM HEIGHTS critical risk

Asbestos, Asbestos Containing Material (ACM)

  • Is this a repair or demolition site - Asbestos testing required?

  • Have survey and tests for asbestos been conducted, and are the results available on site?

  • Corrective Action Notice required for failing to manage the ASBESTOS critical risk

  • CLEARANCE CERTIFICATE - if ACM has been removed is there a certificate on site? No work to start until clearance obtained

  • Corrective Action Notice required for failing to manage the ASBESTOS critical risk

  • Is the site free of asbestos waste after removal work?

  • Corrective Action Notice required for failing to manage the ASBESTOS critical risk

  • Where ACM is present in structures, is it kept intact to prevent it becoming friable?

  • Corrective Action Notice required for failing to manage the ASBESTOS critical risk

Electrical Danger

  • Electricity used?

  • Has temporary power been established, with RCD protection, and within site fencing?

  • Corrective Action Notice required for failing to manage the ELECTRICAL DANGER critical risk

  • Are electrical tools and leads free from damage and tagged (required every 3 months)?

  • Corrective Action Notice required for failing to manage the ELECTRICAL DANGER critical risk

  • Are RCDs being used?

  • Corrective Action Notice required for failing to manage the ELECTRICAL DANGER critical risk

  • REPAIRS: EXISTING MAIN SWITCHBOARD ISOLATED with electrical isolation tag signed by a registered electrician?

  • Corrective Action Notice required for failing to manage the ELECTRICAL DANGER critical risk

POWER TOOLS

  • Power tools are being used onsite?

  • POWER TOOLS - free from damage?

  • Corrective Action Notice required for failing to manage the POWER TOOLS critical risk

  • GUARDS - fitted on power tools where required, and used? e.g. grinders, drop saws, skillsaws.

  • Corrective Action Notice required for failing to manage the POWER TOOLS critical risk

  • HEARING PROTECTION USED - noise over 85DB, check labels on tool

  • Corrective Action Notice required for failing to manage the POWER TOOLS critical risk

  • EYE PROTECTION USED - projectile risk, check labels on tool

  • Corrective Action Notice required for failing to manage the POWER TOOLS critical risk

POWDER ACTUATED HAND HELD TOOLS (PAT)

  • Are powder actuated hand held tools being used?

  • CERTIFICATE OF COMPETENCE - for operator from the manufacturer or agent?

  • Corrective Action Notice required for USE OF PAT FAILURE and failing to manage the POWER TOOLS critical risk

  • SIGNAGE POSTED AT WORK AREA - (caution: explosive-powered tool in use), people cleared from firing zone?

  • Corrective Action Notice required for USE OF PAT FAILURE and failing to manage the POWER TOOLS critical risk

  • HEARING PROTECTION USED - noise over 85DB, check labels on tool

  • Corrective Action Notice required for USE OF PAT FAILURE and failing to manage the POWER TOOLS critical risk

  • EYE PROTECTION USED - projectile risk, check labels on tool

  • Corrective Action Notice required for USE OF PAT FAILURE and failing to manage the POWER TOOLS critical risk

Mobile Plant

  • Is Mobile Plant being used?

  • COMPETENT OPERATOR - experience on the specific machine and site conditions, training, licences (e.g. WTR endorsements).

  • Corrective Action Notice required for failing to manage the MOBILE PLANT critical risk

  • FALLING OBJECTS - hard hats worn where risk of falling object e.g. excavator swing zone.

  • Corrective Action Notice required for failing to manage the MOBILE PLANT critical risk

TRAFFIC MANAGEMENT

  • Are vehicle movements entering and exiting the site being controlled to prevent risk to workers, footpath users and other road users?

  • Is a Traffic Management Plan (TMP) as per the Code of Practice for Temporary Traffic Management needed for this site?

  • Are the Traffic Management measures and signage set up as per the TMP?

  • Corrective Action Notice required for TRAFFICE MANAGEMNT FAILURE

CRANES

  • Cranes used onsite?

  • Does the lift safety zone have an effective isolation barrier?

  • Corrective Action Notice required for USE OF CRANES FAILURE and failing to manage the MOBILE PLANT critical risk

  • LIFTING PLAN - included in site documentation?

  • Corrective Action Notice required for USE OF CRANES FAILURE and failing to manage the MOBILE PLANT critical risk

EXCAVATORS

  • Are excavators being used?

  • MIRROS & AUDIBLE ALARMS - in good condition and in use where fitted?

  • Corrective Action Notice required for USE OF EXCAVATORS FAILURE and failing to manage the MOBILE PLANT critical risk

  • EXCLUSION ZONE - in place around excavator, and/or spotter ? demolition site fence and gate closed while machine operating?

  • Corrective Action Notice required for USE OF EXCAVATORS FAILURE and failing to manage the MOBILE PLANT critical risk

  • ROLL OVER PROTECTIVE STRUCTURE (ROPS) - where uneven ground, next to trench / incline?

  • Corrective Action Notice required for USE OF EXCAVATORS FAILURE and failing to manage the MOBILE PLANT critical risk

  • SEATBELT - operational and being used?

  • Corrective Action Notice required for USE OF EXCAVATORS FAILURE and failing to manage the MOBILE PLANT critical risk

  • QUICK HITCH - to manufacturers specifications, may need to be secured with clip/locking nut when machine in use

  • Corrective Action Notice required for USE OF EXCAVATORS FAILURE and failing to manage the MOBILE PLANT critical risk

  • FIRE EXTINGUISHER AND FIRST AID KIT in cab

  • Corrective Action Notice required for USE OF EXCAVATORS FAILURE and failing to manage the MOBILE PLANT critical risk

CONCRETE PUMPS

  • Are concrete pumps being used?

  • SET UP - outriggers fully extended and on firm footings? Machine operated on level ground? Clear of overhead hazards e.g. power lines?

  • Corrective Action Notice required for USE OF CONCRETE PUMPS FAILURE and failing to manage the MOBILE PLANT critical risk

  • FALLING OBJECTS - hard hats worn when working around pump.

  • Corrective Action Notice required for USE OF CONCRETE PUMPS FAILURE and failing to manage the MOBILE PLANT critical risk

Excavations

  • Excavation and Trench Work being completed onsite?

  • Have underground services been located? (plans, service location)

  • Corrective Action Notice required for failing to manage the EXCAVATIONS critical risk

  • Are excavations or excavated faces battered, benched or shored? (>1.5m deep)

  • Corrective Action Notice required for failing to manage the EXCAVATIONS critical risk

  • Are adequate controls, such as physical barrier, in place to prevent falls into excavations, or from the top of excavated faces, > than 1m?

  • Corrective Action Notice required for failing to manage the EXCAVATIONS critical risk

  • Is there safe access to excavation e.g. ramp or tied off ladder? (trenches >1m deep)

  • Corrective Action Notice required for failing to manage the EXCAVATIONS critical risk

  • Does job method avoid work in unsupported trenches/ excavation?

  • Corrective Action Notice required for failing to manage the EXCAVATIONS critical risk

  • Are materials and spoil stored to prevent edge collapse? (Safe slope + 600mm)

  • Corrective Action Notice required for failing to manage the EXCAVATIONS critical risk

  • Are vehicles and plant at a distance to prevent collapse? (Safe slope + 600mm)

  • Corrective Action Notice required for failing to manage the EXCAVATIONS critical risk

  • Hard hats - worn when risk of falling objects exists?

  • Corrective Action Notice required for failing to manage the EXCAVATIONS critical risk

Respirable Dust & Environmental

DUST, SILICA (RESPIRABLE DUSTS)

  • Present on Site?

  • DUST EXTRACTION EQUIPMENT - on tool or local, fitted / used correctly, effective?

  • Corrective Action Notice required for failing to manage the RESPITABLE DUST critical risk

  • RESPIRATORS - provided, correct type, worn correctly (clean shaven)

  • Corrective Action Notice required for failing to manage the RESPITABLE DUST critical risk

LAND CONTAMINATION

  • NON HAIL SITE - Is there a copy of the Contamination Discovery Protocol (CDP) onsite ? V1.1 11/04/15 (1)

  • Is this a Hail Site?

  • HAIL SITE - Is there signage / notice this is a HAIL Site ?

  • Is there a Site Management Plan (SMP) onsite ?

  • Is the contractor aware of the specific disposal requirements for the soil leaving site ?

  • Are the additional PPE stipulated in the SMP being used correctly ?

  • Are there designated areas / zones as per the SMP ?

ENVIRONMENTAL PROTECTION

  • ENVIRONMENTAL MANAGEMENT PLAN (EMP) - on site and are controls in place as per this plan?

  • PAINT / CONCRETE WASH OFF - Not present

  • MUD, SILT, CONCRETE WASH OFF - Are footpaths, kerbing and road clean

  • NOISE - controlled and kept to a reasonable level?

  • DUST (environmental) - under control?

  • DUST SUPRESSION - Does the contractor have a means of supressing dust at short notice?

  • CHEMICAL CONTROLS - in place e.g. disposal / paint wash?

ARCHAEOLOGICAL

  • If a Low Risk Site is there a copy of the Accidental Discovery Protocol (ADP) on site ? V3.1 11/04/15 (2)

  • If a High Risk Site is there a copy of the HNZ Archaeological Authority on site – relevant to the contractor and scope of work  ? (3)

Demolition

  • Demolition work being undertaken onsite?

  • Waste streams sorted and piled?

  • HAZMAT removed or securely stored?

  • Corrective Action Notice required for DEMOLITION FAILURE

  • Sharp and Hazardous waste on site minimised as much as reasonably practicable?

  • Corrective Action Notice required for DEMOLITION FAILURE

  • Evidence power disconnected prior to demolition?

  • Corrective Action Notice required for DEMOLITION FAILURE

  • WorkSafe Notification?

  • Corrective Action Notice required for DEMOLITION FAILURE

  • Copy of CERA Clearance authorisation? (Red zone only)

  • Corrective Action Notice required for DEMOLITION FAILURE

  • Site checked on the LLUR for HAIL? - (remember to complete HAIL questions in Environment Section)

  • Corrective Action Notice required for DEMOLITION FAILURE

Misc

Hazardous Substances and Chemical Handling

  • SAFETY DATA SHEETS (SDS) - for Hazardous and Environmental substances readily available on site?

  • Are hazardous substances and chemicals being controlled including storage, disposal and PPE?

  • RESPIRATORS - provided, correct type, worn correctly (clean shaven)

Site Specific HSE plan

  • Names of contractor (Main or Sub) for each Critical Risk on the site

  • SIGN IN / OUT REGISTER - used and up to date for people currently on site.

  • INCIDENT REGISTER - evidence of use on this site. Discuss near misses.

Site behaviour review

  • Do workers on the site appear to be free of impairment from drugs, alcohol or any other substance?

  • Are workers helpful/ cooperative (not aggressive or confrontational)?

  • Are you comfortable that this site is safe?

  • Does this site need further specialist inspection

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.