Title Page
-
Document No.CDM 001
-
Audit Title Site Inspection Sheet
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Site Overview
Site Tour
-
Confined Space
-
Demolition
-
Edge Protection
-
Excavations
-
Electricity
-
Hot Works
-
Housekeeping/Material Storage
-
LOLER
-
Piling
-
PUWER
-
Street Works/Access
-
Underground/Overhead Services
-
Work at Height
Site Set Up
-
Signage
-
Pedestrian/Traffic Management
-
Site Security
-
Welfare
-
Fuel Storage
-
Hazardous/Waste Management
-
Pollutants
Occupational Health
-
Asbestos
-
Bio Hazards
-
COSHH
-
Dust/Fumes
-
Lead
-
Manual Handling
-
Noise
-
PPE
-
Radiation
-
Vibration
Special Operations
-
Other
-
Work Over Water
-
Young Persons
Documentation
-
Actions from previous audit
-
Construction Phase Health and Safety Plan
-
Asbestos Survey
-
Emergency Procedure
-
Fire Risk Assessment
-
First Aid
-
Induction Records
-
Permit to Work
-
RAMS
-
Scaffold Design
-
Scaffold TG20 Compliance Sheet
-
Signing in Records
-
Statutory Inspections
-
Statutory Notices
-
Temporary Works Register
-
Tool Box Talks
-
Site diary
Accidents
-
Any Accidents
-
Detail Information
Future Works
-
Future works
-
Details
-
Site Manager
-
Health and Safety Advisor
-
In the event that the company named within this report is investigated by or on behalf of the Health and Safety Executive, CDM Management Limited shall not be liable to the said company for the Fees For Intervention paid by said company to the Health and Safety Executive in accordance with the Health and Safety (Fees) Regulations 2012.