Information
-
Document No.
-
USI Site Measure Sheet
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
Site Info
-
Enter Date and Time arrived at site
-
Enter Name of Installer conducting measurement
-
Enter Name of Installer Checking measurements
-
Client name
-
Site where Inspection is being conducted
-
Site contact name and phone number
-
Had a risk assessment been conducted for this site?
-
Is there a job sheet for this site measure?
-
Insert photo of the site here
Site Details
-
What tools will be required to complete this task?
-
What materials is the sign made of, and what fastening method is recommended for use?
-
Will any special equipment be needed to complete the install and/or removal?
-
What is the estimated weight of the skin and materials that will be needed to be taken up on site?
-
List any access equipment that may be needed to complete work. Are there any potential issues with using this equipment? E.g. Overhead power lines, ditches, trenches, earthworks etc.
-
Can access equipment be taken onto site without obstacle?
-
What is the estimated time to complete works at this site?
-
What are the access times that this work can be completed? E.g. After hours, weekends, business hours
-
Detail any site contacts other than listed above
-
Are there any induction requirements for this site or any specific WHS requirements?
-
If this is an abseil site, are there sufficient anchor points?
Drawing
-
Add photo as required
-
Add drawing as required
-
Photo 2
-
Drawing 2
-
Photo 3
-
Drawing 3
Sign off
-
Time left site
-
Name and signature of installer measuring
-
Name and signature of installer checking