Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
RACI
-
Company
-
For Action by:
-
For information to:
-
Sub-Contractor(s):
Items checked:
-
Actions closed from previous actions
-
Documentation (registers, records, sub-contractor policies)
-
Co-ordination of SHE (meetings etc...)
-
Training
-
Welfare Arrangements
-
First Aid
-
Protecting the Public / Corporate Image
-
House Keeping
-
Storage
-
Fuels and gases
-
COSHH
-
Other
-
Emergencies
-
Fire
-
Safety
-
Environmental
-
Risk Assessments / Method Statement
-
Permits - use and control
-
Confined spaces
-
Excavations
-
Working at height
-
Ladders
-
Mitigating Measures
-
Quick Hitch - Competency
-
Scaffolds
-
Lifting Equipment and Operations
-
Powered access equipment
-
Vehicle / Vehicle Movements
-
Portable Tools
-
Electricity
-
Traffic Management (inc Mud on Road)
-
Plant and Machinery
-
Manual Handling
-
Noise & Vibration: Occupational
-
Noise & Vibration: Environmental
-
Hazardous substances
-
Waste management - Skips
-
Waste minimisation 'Save It'
-
Waste notes correct/correct
-
Water managment
-
Dewatering systems
-
Discharges
-
Dust
-
Ecology: Protection of plants, animals & designated sites
-
Protective clothing all in place and suitable
-
Designated concrete washout
-
Spill kits in place
RAMS Checked:
-
Ref number
-
Title
-
Ref number
-
Title
-
Ref number
-
Title
-
Ref number
-
Title
-
Ref number
-
Title
Signed off
-
Signed: (Project Manager / Site Agent)