1.0 - Safety and Occupational Health

  • 1.1 - Are there risk assessments in place for all the works taking place now and do the precautions appear to be implemented properly.

  • 1.2 - Is everyone on site wearing a safety helmet, high visibility garment, safety footwear, safety glasses and cut 3 gloves?

  • 1.3 - Are arrangements in place to control vehicle movements, particularly reversing and the segregation of pedestrians from plant?

  • 1.4 - Do all Plant Operators and drivers hold a current CPCS card for the plant they are operating and are they operating it competently?

  • 1.5 - Is construction plant in good condition without signs of defects, such as oil leaks, weld cracks, incorrect boom pin retaining clips, noisy/smoky exhausts, obvious steering and brake defects?

  • 1.6 - Does the site lifting plan cover every machine carrying out a lifting operation on the site?

  • 1.7 - Are cranes set up level with all their outriggers out?

  • 1.8 - Are all lifting operations being carried out safely?

  • 1.9 - Is there a "Permit to Penetrate" in place for all excavations?

  • 1.10 - Are excavation suitably battered or supported by a preparatory system?

  • 1.11 - Are there arrangements in place to stop persons falling from any place from which a fall could lead to injury?

  • 1.12 - Generally, are you satisfied that unauthorised persons are not erecting, altering or dismantling scaffolds, fasle-work or excavation support structures.

  • 1.13 - Are podium steps, mobile scaffolds,etc., being used in preference to ladders and stepladders?

  • 1.14 - Are all work areas and access routes tidy and clear of obstructions?

  • 1.15 - Are stripped timbers being de-nailed?

  • 1.16 - Are substances being used safely in accordance with their risk assessment?

  • 1.17 - Is PPE associated with COSHH risk assessments being worn?

  • 1.18 - Are the washing facilities clean and supplied with soap, a means of drying hands and hot & cold water?

  • 1.19 - Are the mess rooms clean and tidy?

  • 1.20. - Are the toilets clean and supplied with paper?

  • 1.21 - Are the fire precautions in place and properly maintained in accordance with the Site Fire Plan?

  • 1.22 - Is the site free of fire risk from flammable materials and packaging?

  • 1.23 - Are all Traffic Management Systems, erected as per the agreed scheme?

  • 1.24 - Are all traffic cones/signs, clean and in good conditions?

  • 1.25 - Are pedestrian routes in good order and a minimum width of 1.35m?

  • 1.26 - Are all hoardings in good condition and secure.?

  • 1.27 - If there have been any accidents or significant near misses this week have they been carefully investigated to reveal the "root cause"?

  • 1.28 - If accidents or significant near misses have been occurred has a report been sent to the Health, Safety & Environmental Protection Department?

  • 1.29 -Have Task Control Sheets Been completed and communicated to the workforce, identify who was asked during inspection to confirm this?

  • Signature when all actions have been completed?

2.0 - Protection of the Environment

  • 2.1 - Are subcontractors aware of any restrictions on working hours?

  • 2.2 - Are access/egress and site roads clear of mud and debris?

  • 2.3 - Are works areas tidy and free of litter?

  • 2.4 - Is a concrete washout facility provided, maintained and accessible for use?

  • 2.5 - Are fuel and other substances stored in secure ares away from watercourses and site drainage?

  • 2.6 - Are measures in place to protect neighbouring properties from noise, vibration and dust?

  • 2.7 - If there is a need for dust suppression is it in place and effective?

  • 2.8 - Are waste skips and containers signed, accessible and not overfilled?

  • 2.9 - Are sub-contractors on site aware of the Site Waste Management Plan? (List sub-contractors asked)

  • 2.10 - Are measures in place to protect water courses being polluted by site activities and site run off?

  • 2.11 - If works are being undertaken near to watercourses or involving watercourses, (e.g. Drainage works) has approval been sought from the Environmental Agency?n

  • 2.12 - If protected wildlife species have been found on site are there precautions in place to protect them?

  • 2.13 - Is vegetation (trees, hedgerows, etc.) protected against damage caused by site works?

  • Signature when all actions have been completed?

  • Select date

3.0 - Are there any other significant matters that you wish to report?

  • Other matters reported?

  • Signature when all actions have been completed?

Sign Off

  • On site representative

  • Auditor's signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.