Information
-
Document No.
-
Audit Title
-
Conducted on
-
Prepared by
-
Personnel
Audit overview
-
QID 195 available and used
-
Safety alerts circulated & displayed
-
Notice boards updated
-
Statutory safety posters displayed
-
Adequate posters displayed
-
Minutes of latest safety meeting displayed
-
Walkways clearly marked
-
Lighting adequate
-
ERP available and all personnel know how to respond
-
Security procedures effective
-
Other
Procedure 1. Risk Assessment & Control Strategies
-
Full coverage of risk assessments
-
Assessments accessible to all
-
Reviewed, in date, current suitable and sufficient
-
Personnel risk assessments secured
-
Other
Procedure 2. Control of Substances Hazardous to Health (COSHH)
-
COSHH assessments completed
-
PPE required supplied & in use
-
First aid measures clearly indicated
-
MSDS file available
-
Minimum chemical quantities held
-
LEV tested & records held
-
Other
Procedure 3. Personal & Respiratory Protective Equipment
-
Test certification available
-
Maintenance recorded
-
Equipment fit for purpose
-
Other
Procedure 4. Rider Operated Fork-Lift Trucks
-
Daily checks recorded
-
Maintenance active and recorded
-
Drivers trained and current
-
Drivers authorised
-
Accessories checked and fit for purpose
-
Key control system used
-
Other
Procedure 5. Working at Height
-
Appropriate stands available used
-
Three points of contact emphasised
-
Movement routes discussed
-
Stands of correct construction
-
Register of stands maintained and available for audit
-
Condition check completed & records available
-
Head protection available & used
-
Movement though height training current for all
-
Head protection training completed & recorded
-
Other
Procedure 6. Work Equipment, Compressed Gas & Pressure Systems
-
Testing regime followed & documented
-
Equipment within life cycle
-
Other
Procedure 7. Lifting Equipment & Lifting Operations
-
Lifting plans completed
-
Lifting plans retained for audit
-
Test certification for lifting equipment within date
-
Authorisations recorded for personnel to operate lifting equipment
-
Personnel authorised trained and certifications available
-
Equipment colour coded in date & tagged
-
Quarantine procedures in place for out of service equipment
-
Other
Procedure 8. Return to Work
-
Base staff aware of procedure
-
Case management records retained & available for audit
-
Other
Procedure 9. Handling, Storing & Transportation of Dangerous Goods
-
Competent staff trained to handle goods
-
Records of transfers retained
-
Explosive storage correct & suitably marked
-
Explosive register maintained
-
IATA DG regulations current & used
-
Other
Procedure 10. Control of Contractors
-
Permit to work system in place
-
Control and induction of contractors completed & recorded
-
Permits retained for audit
-
Lock out/ Tag out system deployed
-
Other
Procedure 11. Manual & Kinetic Handling
-
Full handling assessments completed
-
Manual handling training for personnel current & recorded
-
Handling instructional posters displayed
-
Other
Procedure 12. Electricity & Electrical Appliances
-
Cabling hidden & tidy
-
Insulations secure
-
Battery charging effective & completed safely in we'll ventilated areas
-
Switches and boxes secure
-
Portable appliance testing completed
-
Loop impedance check made
-
RCD devices used on circuits
-
Other
Procedure 13. General Office Safety
-
Housekeeping appropriate, tidy location
-
Spaces & movement areas clear
-
Fire equipment appropriate
-
Good ventilation standards
-
Other
Procedure 14. Environmental Procedures & Waste Management
-
Waste segregation in place
-
Spillage kits available for use
-
RRR adopted as policy
-
Tank bunds adequate & inspected
-
All spillage potential locations bunded and controlled
-
Other
Procedure 15. Fire & Emergency Procedures
-
Warning & directional signage clear
-
Equipment in test
-
Fire wardens appointed
-
ERP available & in date
-
Test of alarms recorded
-
Evacuation drills recorded
-
Other
Procedure 16. Accidents & Incidents Reporting and Investigation
-
Accident & incident forms available
-
Records retained in base & forwarded too BU
-
Procedure clear & linked to Work Case management
-
Other
Procedure 17. Overweight Freight
-
All cases reported to client after investigation
-
Records retained
-
Other
Procedure 18. Lone Working
-
Controls & risk assessments completed
-
Base personnel aware of procedure
-
Other
Procedure 19. Inductions & Training
-
Induction checklists available
-
Records of inductions retained
-
Contractors inducted
-
Training records retained
-
Other
Procedure 20. First Aid Procedure
-
First aid equipment available
-
Trained first aid personnel available
-
Arrangements made with nearby medical practices if required
-
No medications administered orally in cabinets
-
Other
Procedure 21. Focus - Behavioural Management
-
Trainers observers in correct numbers
-
Records entered to system weekly
-
On line records entry used
-
Results displayed
-
Other
Procedure 22. Asbestos Management
-
Asbestos surveys completed
-
Asbestos plan in place
-
Awareness & training to all staff
-
Other
Procedure 23. Noise & Vibration
-
Hearing defence available & used
-
Signage where hearing defence required
-
Hearing defence fit for purpose
-
Noise maps available for facility
-
Other
Procedure 24. Occupational Health & Personal Health Care
-
Linked to work case management
-
Audio screening
-
COSHH evaluations and medical screening
-
Legionella monitoring
-
Other
Procedure 25. Working in Extremes of Cold Climate
-
Appropriate clothing & PPE available
-
Creams & barrier protection used
-
Locations for rest in warm areas
-
Other
Procedure 26. Display Screen Equipment
-
Evaluations on workstations completed
-
Cable management effective
-
Training available & completed
-
Other
Procedure 27. Driving Motor Vehicles
-
Driver training completed
-
Vehicle inspections completed
-
License checks completed
-
Driver authorisation in place and current
-
Other
Procedure 28. Working in Extremes of Hot Climate
-
Hydration fluids plentiful
-
Rest areas in cooler locations
-
Screening creams available
-
Appropriate clothing worn
-
Other
Procedure 29. Approach to Aircraft Carrying or Previously Carried Infectious Casualties
-
PPE fit for purpose available
-
Training completed for personnel
-
Isolation areas identified
-
Other
Procedure 30. Toolbox Talks & Briefings
-
Completed on a daily or needs basis
-
Other
Procedure 31. Fatigue Management
-
Rota planning considers fatigue patterns
-
Work groups consulted on rota patterns
-
Other
Procedure 32. Personal Health & Emergency Evacuations
-
Available to all staff
-
Priorities established & observed
-
Medical providers & locally used clinics briefed on triage priorities
-
Other
Procedure 33. Audit Procedures
-
Audit records available & actions confirmed
-
Non conformance correctly monitored
-
Other
Procedure 34. Communications & Consultation
-
Regular safety meetings active & minuted
-
Minutes of meetings posted on safety notice boards
-
Safety representatives identified
-
Safety representative trained
-
Other
Procedure 35. Working from Home
-
Procedure and risk assessments in place
-
DSE self-assessments completed
-
Other
Procedure 36. Workplace Housekeeping
-
Local procedure in place
-
Good housekeeping practiced
-
Other
Procedure 37. Walkabouts and Inspections
-
Base inspection conducted once a month and kept on file (1 year) Annex 1 form
-
Management inspections carried out
-
Other
Procedure 40. PPE
-
Helmets worn whilst working at height
-
Protective gloves worn
-
Protective footwear worn
-
Protective eyewear worn
-
Protective clothing worn
-
Hearing defence used
-
Other
Procedure 41. Controlling Personal Jewellery
-
Long hair tied back protected by hair net or helmet
-
Personal jewellery not worn (e.g. Rings, bracelets, anklets,ear rings, necklaces)
-
Lanyards and ID badges quick release type
-
Other