Information

  • Civil Contract audit been carried out on

  • PN / NBU - Job Number

  • Company

  • Supervisor Name

  • Please Select Type of Check you are Carrying out i.e Excavation Depth or Stone Depth

  • Team Name who carrying out the Excavation works

  • Street Name
  • Conducted on

  • Build Area

Excavation Depth Information

  • Civil Contract audit been carried out on

  • Excavation / Stone Depth location 1 i.e House number or land Mark

  • Please take a photo showing Location i.e House or Land Mark, Wide angle view / Set back to show location better.

  • Please select surface type i.e Footway Tarmac, Footway Flags, Footway Concrete, Footway Blocks, Verge, Carriageway Blocks, Carriageway Concrete, Carriageway Tarmac.

  • Please Type the Depth Measurement i.e 250mm Footway or 450MM for Carriageway

  • Please take Photo showing Depth Measurement more than one can be taken

  • Is the Excavation / Stone to the correct Depth

  • You Must instruct the team to lower the Excavation to the correct Depth and complete the below Request

  • Please take Photo's showing the correct Depth as been achieved at locations 1, more than one can be taken

  • Location 1, please type the Depth Measurement i.e 250mm Footway or 450MM for Carriageway

  • Location 2, to be completed exceeds 15m, But if track end OPEN only, location 1 will do.

  • Location 2 Excavation / Stone Depth Required If track length exceeds 15m

  • Excavation / Stone Depth location 2 i.e House number or land Mark

  • Please take a photo showing Location i.e House or Land Mark, Wide angle view / Set back to show location better.

  • Please select surface type i.e Footway Tarmac, Footway Flags, Footway Concrete, Footway Blocks, Verge, Carriageway Blocks, Carriageway Concrete, Carriageway Tarmac.

  • Please Type the Depth Measurement i.e 250mm Footway or 450MM for Carriageway

  • Please take Photo showing Depth Measurement more than one can be taken

  • Is the Excavation / Stone to the correct Depth

  • You Must instruct the team to lower the Excavation to the correct Depth and complete the below Request

  • Please take Photo's showing the correct Depth as been achieved at locations 2, more than one can be taken

  • Location 2, please type the Depth Measurement i.e 250mm Footway or 450MM for Carriageway

  • Location 3, to be completed if required for 50m + track length.

  • Location 3 Excavation /Stone Depth Required If track length exceeds 50m

  • Excavation /Stone Depth location 3, i.e House number or land Mark

  • Please take a photo showing Location i.e House or Land Mark, Wide angle view / Set back to show location better.

  • Please select surface type i.e Footway Tarmac, Footway Flags, Footway Concrete, Footway Blocks, Verge, Carriageway Blocks, Carriageway Concrete, Carriageway Tarmac.

  • Please Type the Depth Measurement i.e 250mm Footway or 450MM for Carriageway

  • Please take Photo showing Depth Measurement more than one can be taken

  • Is the Excavation / Stone to the correct Depth

  • You Must instruct the team to lower the Excavation to the correct Depth and complete the below Request

  • Please take Photo's showing the correct Depth as been achieved at locations 3, more than one can be taken

  • Location 3, please type the Depth Measurement i.e 250mm Footway or 450MM for Carriageway

  • Excavation / Stone Depth location 1 i.e House number or land Mark

  • Please take a photo showing Location i.e House or Land Mark, Wide angle view / Set back to show location better.

  • Please select surface type i.e Footway Tarmac, Footway Flags, Footway Concrete, Footway Blocks, Verge, Carriageway Blocks, Carriageway Concrete, Carriageway Tarmac.

  • Please Type the Depth Measurement i.e 250mm Footway or 450MM for Carriageway

  • Please take Photo showing Depth Measurement more than one can be taken

  • Is the Excavation / Stone to the correct Depth

  • You Must instruct the team to lower the Excavation to the correct Depth and complete the below Request

  • Please take Photo's showing the correct Depth as been achieved at locations 1, more than one can be taken

  • Location 1, please type the Depth Measurement i.e 250mm Footway or 450MM for Carriageway

  • Location 2, to be completed exceeds 15m, But if track end OPEN only, location 1 will do.

  • Location 2 Excavation / Stone Depth Required If track length exceeds 15m

  • Excavation / Stone Depth location 2 i.e House number or land Mark

  • Please take a photo showing Location i.e House or Land Mark, Wide angle view / Set back to show location better.

  • Please select surface type i.e Footway Tarmac, Footway Flags, Footway Concrete, Footway Blocks, Verge, Carriageway Blocks, Carriageway Concrete, Carriageway Tarmac.

  • Please Type the Depth Measurement i.e 250mm Footway or 450MM for Carriageway

  • Please take Photo showing Depth Measurement more than one can be taken

  • Is the Excavation / Stone to the correct Depth

  • You Must instruct the team to lower the Excavation to the correct Depth and complete the below Request

  • Please take Photo's showing the correct Depth as been achieved at locations 2, more than one can be taken

  • Location 2, please type the Depth Measurement i.e 250mm Footway or 450MM for Carriageway

  • Location 3, to be completed if required for 50m + track length.

  • Location 3 Excavation /Stone Depth Required If track length exceeds 50m

  • Excavation /Stone Depth location 3, i.e House number or land Mark

  • Please take a photo showing Location i.e House or Land Mark, Wide angle view / Set back to show location better.

  • Please select surface type i.e Footway Tarmac, Footway Flags, Footway Concrete, Footway Blocks, Verge, Carriageway Blocks, Carriageway Concrete, Carriageway Tarmac.

  • Please Type the Depth Measurement i.e 250mm Footway or 450MM for Carriageway

  • Please take Photo showing Depth Measurement more than one can be taken

  • Is the Excavation / Stone to the correct Depth

  • You Must instruct the team to lower the Excavation to the correct Depth and complete the below Request

  • Please take Photo's showing the correct Depth as been achieved at locations 3, more than one can be taken

  • Location 3, please type the Depth Measurement i.e 250mm Footway or 450MM for Carriageway

Conclusion

  • Excavation /Stone Depth Report Complete

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.