Information

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

1.0 - Site File and Administration

  • 1.1 - Is the site file on site?

  • 1.2-Have all SWMS been supplied and signed by all parties?

  • 1.3-Has a toolbox talk in the past two weeks and signed off by all workers?

  • 1.4-Are all MSDS available for all HSDG on site and register up to date?

  • 1.5-Has a site specific safety plan been supplied and adequate for the project?

  • 1.6-Are all tabs populated with the correct forms?

2.0 - Plant and equipment

  • 2.1 - EWP pre-start conducted and service books available?

  • 2.2 - EWP stored in a safe position and basket raised?

  • 2.3 - Barricades in place and appropriate for site?

  • 2.4 - Licensed operators-Tickets available and sighted?

  • 2.5 - Operators wearing harnesses on all boom EWP's?

  • 2.6 - Pressure washer and spray painting equipment in good condition including hoses,pump and free of leaks?

  • 2.7 - Maintenance of all equipment up to date?

  • 2.8- Is the EWP appropriate for the job?

  • 2.8- Are all power-tools fitted with guards and handles?(tools to be used with all attachments as fitted from new)

  • 2.9- Where gang/tool boxes are in use, check that the lids have a positive locking device to prevent lids from dropping. If Hydraulic struts are in use, 2 are required. <br>

3.0 - Scaffolds-including mobile and fixed types

  • 3.1 - Licensed persons erecting scaffolds above 4 mtrs?s

  • 3.2 - Safe and appropriate scaffold?

  • 3.3 - Inspection protocol for scaffold in place-monthly inspection records?

  • 3.4 - Compatible scaffold components-unlabelled or do not meet AS/NZS?

  • 3.5-Safe Work Load (SWL) not exceeded? (tools, stored materials, number of persons)

  • 3.6-Scaffold installer has provided has provided documentation for install and maintenance (includes handover certificate, drawings and computations)?

  • 3.7-SWMS reflective of work conducted?

4.0 - Harness and rope access equipment

  • 4.1 - Safe and undamaged harness or equipment?

  • 4.2 - Compatible safety hooks and equipment?

  • 4.3 - Equipment labelled and meets AS/NZS?

  • 4.4 - Safe and certified anchor points ?

  • 4.5 - Daily inspection checklist for equipment completed?

  • 4.6 - Formal training for operators?-Tickets to be sighted?

  • 4.7 - Plans for rope configuration available and clearly shows setup?

  • 4.8 -PPE worn as required?

5.0 - Ladders

  • 5.1 - Safe and undamaged ladders in use?

  • 5.2 - Safe positioning of ladders?

  • 5.3 - Ladder properly secured?

  • 5.4 - Ladder suitable for the job? ( e.g. no ability for 3 point contact)

  • 5.5 - Industrial rated ladders in use ?(120kg minimum marked on ladder)

  • 5.6 - Extension ladders not being used to work off and only for access?

6.0 - Hazardous manual handling tasks

  • 6.1 - Identification and assessment of hazardous manual tasks ?<br>SWMS identifies tasks and has controls in place

  • 6.2 - Adequate risk controls? (examples:job rotation, lighter loads, trolleys, lifting equipment etc)

  • 6.3 - Training provided in risk controls and safe lifting/team lifting techniques?

  • 6.4 -Workers observed performing safe manual techniques?

7.0 - Hazardous Chemicals (Including fuel and oil)

  • 7.1 - Safe storage location?(e.g. Flammables near ignition sources, spills could enter storm-water drains etc)

  • 7.2 - Chemicals stored appropriately and compatible with other chemicals? (e.g class 3 and class 8 should not be stored together)

  • 7.3 - Adequate spill containment equipment available?

  • 7.4-Emergency procedures in place for injuries, spills ,fire?

  • 7.5-excessive quantities of HSDG stored on site or in vehicles?

  • 7.6-Sufficient ventilation?

  • 7.7-Sufficient and correct PPE?

  • 7.8-Suitable storage containers?(unlabelled or stored in food containers)

8.0 - Traffic management

  • 8.1 - Adequate Traffic Management Plan (TMP) in place?

  • 8.2 - Training in traffic management for all persons performing TM on site (contractors and visitors)?

  • 8.3 - Adequate controls for traffic management?(physical barriers, bollards,speed limits, flashing lights, spotters)

9.0 - Personal Protective Equipment (PPE)

  • 9.1 - PPE worn (including sun protection) according to SWMS?

  • 9.2 - System to issue, inspect, replace and monitor PPE?

  • 9.3 - Training in safe use, cleaning and inspection of PPE?

10.0-Work Environment

  • 10.1-Sufficient lighting?

  • 10.2-Adequate housekeeping?

  • 10.3-Adequate Noise and vibration control?

11.0-Emergency Response

  • 11.1-Emergency plans prepared for site?

  • 11.2-Emergency procedures displayed on site?

  • 11.3-Training and rehearsal of emergency plans?

  • 11.4 - Adequate first aid kits and equipment on site?

  • 11.5 - Sufficient access to formally trained first aiders for all shifts?

  • 11.6 - Suitable and adequate communication equipment?

12.0 - Environmental Hazards

  • 12.1 - Adequate Environmental Management Plan in place?

  • 13.2 - Adequate dust suppression system in place?

  • 13.3 - Systems in place to prevent contaminants entering storm-water or drains?

  • 13.4 - Water re-use systems in use?

13.0 - Administrative procedures

  • 13.1 - Appropriate permits obtained?(Council, EPA,WHS,Hot works,Confined Space etc)

  • 13.2 - Adequate induction for workers contractors and visitors?

  • 13.3 - Adequate supervisory arrangements?

  • 13.4 - Adequate training licenses skills and experience?

  • 13.5 - Adequate routine inspections, monitoring, auditing?

14.0- Electrical Safety

  • 14.1- Are all electrical tools and power-leads tested and tagged?

  • 14.2- Are all electrical leads off the floor on lead stands/hooks?

  • 14.3- No use of double adapters?

  • 14.4- Is RCD protection on all power-tools?

  • 14.5- Power tools and leads not near water or conductive materials?

  • 14.6- Cables not over sharp objects ,hot surfaces or able to be driven over by vehicles?

  • 14.7- Total length of extension leads no longer than 32 metres and not joined together?

Corrective actions

  • Enter any corrective actions required

Sign Off

  • On site representative

  • Auditor's signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.