Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1.0 - Site File and Administration
-
1.1 - Is the site file on site?
-
1.2-Have all SWMS been supplied and signed by all parties?
-
1.3-Has a toolbox talk in the past two weeks and signed off by all workers?
-
1.4-Are all MSDS available for all HSDG on site and register up to date?
-
1.5-Has a site specific safety plan been supplied and adequate for the project?
-
1.6-Are all tabs populated with the correct forms?
2.0 - Plant and equipment
-
2.1 - EWP pre-start conducted and service books available?
-
2.2 - EWP stored in a safe position and basket raised?
-
2.3 - Barricades in place and appropriate for site?
-
2.4 - Licensed operators-Tickets available and sighted?
-
2.5 - Operators wearing harnesses on all boom EWP's?
-
2.6 - Pressure washer and spray painting equipment in good condition including hoses,pump and free of leaks?
-
2.7 - Maintenance of all equipment up to date?
-
2.8- Is the EWP appropriate for the job?
-
2.8- Are all power-tools fitted with guards and handles?(tools to be used with all attachments as fitted from new)
-
2.9- Where gang/tool boxes are in use, check that the lids have a positive locking device to prevent lids from dropping. If Hydraulic struts are in use, 2 are required. <br>
3.0 - Scaffolds-including mobile and fixed types
-
3.1 - Licensed persons erecting scaffolds above 4 mtrs?s
-
3.2 - Safe and appropriate scaffold?
-
3.3 - Inspection protocol for scaffold in place-monthly inspection records?
-
3.4 - Compatible scaffold components-unlabelled or do not meet AS/NZS?
-
3.5-Safe Work Load (SWL) not exceeded? (tools, stored materials, number of persons)
-
3.6-Scaffold installer has provided has provided documentation for install and maintenance (includes handover certificate, drawings and computations)?
-
3.7-SWMS reflective of work conducted?
4.0 - Harness and rope access equipment
-
4.1 - Safe and undamaged harness or equipment?
-
4.2 - Compatible safety hooks and equipment?
-
4.3 - Equipment labelled and meets AS/NZS?
-
4.4 - Safe and certified anchor points ?
-
4.5 - Daily inspection checklist for equipment completed?
-
4.6 - Formal training for operators?-Tickets to be sighted?
-
4.7 - Plans for rope configuration available and clearly shows setup?
-
4.8 -PPE worn as required?
5.0 - Ladders
-
5.1 - Safe and undamaged ladders in use?
-
5.2 - Safe positioning of ladders?
-
5.3 - Ladder properly secured?
-
5.4 - Ladder suitable for the job? ( e.g. no ability for 3 point contact)
-
5.5 - Industrial rated ladders in use ?(120kg minimum marked on ladder)
-
5.6 - Extension ladders not being used to work off and only for access?
6.0 - Hazardous manual handling tasks
-
6.1 - Identification and assessment of hazardous manual tasks ?<br>SWMS identifies tasks and has controls in place
-
6.2 - Adequate risk controls? (examples:job rotation, lighter loads, trolleys, lifting equipment etc)
-
6.3 - Training provided in risk controls and safe lifting/team lifting techniques?
-
6.4 -Workers observed performing safe manual techniques?
7.0 - Hazardous Chemicals (Including fuel and oil)
-
7.1 - Safe storage location?(e.g. Flammables near ignition sources, spills could enter storm-water drains etc)
-
7.2 - Chemicals stored appropriately and compatible with other chemicals? (e.g class 3 and class 8 should not be stored together)
-
7.3 - Adequate spill containment equipment available?
-
7.4-Emergency procedures in place for injuries, spills ,fire?
-
7.5-excessive quantities of HSDG stored on site or in vehicles?
-
7.6-Sufficient ventilation?
-
7.7-Sufficient and correct PPE?
-
7.8-Suitable storage containers?(unlabelled or stored in food containers)
8.0 - Traffic management
-
8.1 - Adequate Traffic Management Plan (TMP) in place?
-
8.2 - Training in traffic management for all persons performing TM on site (contractors and visitors)?
-
8.3 - Adequate controls for traffic management?(physical barriers, bollards,speed limits, flashing lights, spotters)
9.0 - Personal Protective Equipment (PPE)
-
9.1 - PPE worn (including sun protection) according to SWMS?
-
9.2 - System to issue, inspect, replace and monitor PPE?
-
9.3 - Training in safe use, cleaning and inspection of PPE?
10.0-Work Environment
-
10.1-Sufficient lighting?
-
10.2-Adequate housekeeping?
-
10.3-Adequate Noise and vibration control?
11.0-Emergency Response
-
11.1-Emergency plans prepared for site?
-
11.2-Emergency procedures displayed on site?
-
11.3-Training and rehearsal of emergency plans?
-
11.4 - Adequate first aid kits and equipment on site?
-
11.5 - Sufficient access to formally trained first aiders for all shifts?
-
11.6 - Suitable and adequate communication equipment?
12.0 - Environmental Hazards
-
12.1 - Adequate Environmental Management Plan in place?
-
13.2 - Adequate dust suppression system in place?
-
13.3 - Systems in place to prevent contaminants entering storm-water or drains?
-
13.4 - Water re-use systems in use?
13.0 - Administrative procedures
-
13.1 - Appropriate permits obtained?(Council, EPA,WHS,Hot works,Confined Space etc)
-
13.2 - Adequate induction for workers contractors and visitors?
-
13.3 - Adequate supervisory arrangements?
-
13.4 - Adequate training licenses skills and experience?
-
13.5 - Adequate routine inspections, monitoring, auditing?
14.0- Electrical Safety
-
14.1- Are all electrical tools and power-leads tested and tagged?
-
14.2- Are all electrical leads off the floor on lead stands/hooks?
-
14.3- No use of double adapters?
-
14.4- Is RCD protection on all power-tools?
-
14.5- Power tools and leads not near water or conductive materials?
-
14.6- Cables not over sharp objects ,hot surfaces or able to be driven over by vehicles?
-
14.7- Total length of extension leads no longer than 32 metres and not joined together?
Corrective actions
-
Enter any corrective actions required
Sign Off
-
On site representative
-
Auditor's signature