Concrete Placement Sign Off:
-
Client / Site
-
Job Number:
-
Conducted on
-
Prepared by
-
Pour Description
-
Pour Location
-
Number of Cubic Yards;
-
Specified Concrete;
-
Attendees
Concrete Placement
-
Have all dimension been checked against the contract drawings and RFI's that pertain to this area?
-
Has all rebar and wire mesh been checked against shop drawings?
-
Have adequate supports (wire chairs) been installed so that rebar and wire mesh remain in position during the pour?
-
Is the vapor barrier installed correctly and meet the proper mil thickness
-
Have anchor bolts been checked for proper placement?
-
Are forms and rebar/mesh clean and free of debris/rust/scaling ?
-
Are all electrical floor boxes set?
-
Has the elevations of all electrical conduits and plumbing lines been verified as (not to high in the pour) ?
-
Floor drains all set and at the proper elevations and locations.
-
Are there any sleeves, recesses or misc embeds that need to be placed?
-
Is the perimeter insulation installed at the proper locations.
-
Has expansion material been placed at all the specified locations.
-
Is the correct concrete mix design being supplied for the area being poured?
-