Title Page
-
Client
-
SimPro Project Number
-
NPE-Tech Representative
-
Location
-
Prepared by
-
Approved by
Ring Main Inspection
- Ring Main Inspection - General
-
Ring Main Number
-
Is there a RM label externally visible with this number?
-
Date of inspection
-
Inspected by
-
RMU Manufacturer
-
Who is the Manufacturer?
-
RMU Type (i.e. Safelink)
-
Serial Number
-
Date of manufacture
-
Is there a Voltage warning sign on outside of cubicle?
-
Is the cubicle easily accessible?
-
Is the cubicle secured to the plinth?
-
Is the cubicle sturdy?
-
Is the RMU secured to plinth?
-
Door hinges functional and lubricated?
-
Is the cubicle bonded to earth and is the earth adequate?
-
Is there vegetation inside the cubicle?
-
Is the SF6 gas level indicator within acceptable range?
-
Is there any exposure to members of the public?
-
Are the operating handles located inside the cubicle?
-
Where are the handles?
- Outside Cubicle
- Unable to locate
- Other (ie shared between two ringmains, please describe)
-
Describe where handle is located or how to access handle.
-
How many units are present in the ringmain?
-
Is the ringmain indoor or outdoor?
-
Does the room have 24 hour access?
-
Where is the key located/how is access gained?
-
Are cable end blocks fitted?
-
Are the slide locks on the door functional and do they engage?
-
Are the RMU labels on all units? (i.e. RM1234 U1 RM1234 E2)
-
Which labels are missing?
-
Are main earths both labelled (1 and 2)
- Main Earth Bank 1 and 2 both labelled
- Main Earth Bank 1 labelled only
- Main Earth Bank 2 labelled only
- Neither Earth Bank labelled
Earth Bank 1 test (Results to be noted and photographed)
-
Write test results then attach photos.
Earth Bank 2 test (Results to be noted and photographed)
-
Write test results then attach photos.
Combined Earth Bank test (Result to be noted and photographed)
-
Write test results then attach photos.
-
Take photos of inside and outside showing general condition of asset, housing and surrounding area.
Specific RM Unit assessment
-
What is the unit number
-
Is position indicator clearly visible?
-
Is there an earth fault indicator present on this unit?
-
Is there pitch leaking from cable box?