Transformer Inspection
- Transformer General details
-
Transformer Number
-
Is this transformer number externally visible with this number?
-
Date of inspection
-
Inspected By
-
Tx Manufacturer
-
Who is the Manufacturer?
-
Date of Manufacture
-
kVA Rating of Tx
-
Serial Number
-
Substation type
- Minisub (Shed, Bunker, internal room)
- Fully Enclosed - Steel
- Fully Enclosed - Fibreglass
- Open Enclosure/Poletop (even if on ground)
- Other
-
Describe and take photo of assembly.
-
Is 24 hour access available?
-
How is access gained?
-
Are trees hanging over site?
-
Are the trees a maintenance issue at this time?
-
Are all Gates/Doors/Locks in good condition? (Take photos of all failures)
-
Is there any damage (including rust) to fence/wall/enclosure? (Take photos of all failures)
-
Does the enclosure have any graffiti or require repainting?
-
Is site clean and free of rubbish and debris?
-
Are danger signs installed onsite?
-
Is site base level and undamaged?
-
Are kickplates installed and undamaged?
-
Does site require an industrial vacuum?
-
What is the condition of the earth?
-
What is the failure reason?
-
Are there signs of partial discharge?
-
Does thermal image indicate any issues?
-
Record the oil level.
-
Is there any sign of oil leaks?
-
Oil temperature indicator present?
-
What is the oil temperature?
-
What is the condition of the silica gel?
Earth Bank 1 test (Results to be noted and photographed)
-
Write test results then attach photos.
Earth Bank 2 test (Results to be noted and photographed)
-
Write test results then attach photos.
Combined Earth Bank test (Result to be noted and photographed)
-
Write test results then attach photos.
-
Take photos of inside and outside showing general condition of asset, housing and surrounding area.
-
Take photo of Tx name plate.
LV Frame
-
Take photo of LV Frame name plate (if present)
-
Take photo of LV frame (if present)
-
Is there an LV frame present or is LV hard on Tx bushings?
-
Is there any type of isolation present on the LV?
-
Is the LV frame secured to the base?
-
Is there a gen port?
-
What is the method of isolation?
- LV isolator
- Circuit Breaker
- Links
- None (LV frame is hard on the bushings/busbar)