Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
7 foot chains installed per drawing?<br>
-
Base plates installed per drawing (90 ft-lbs for each bolt)<br>
-
End stanchions installed per drawing?<br>
-
Tie back base plate installed per drawing?
-
End 1: Carabiner, Zorbit, Turnbuckle and wire rope assembly
-
Intermediate stanchion installed per drawing (60' max and oriented correctly for pass through)
-
End 2: Cable clip, thimble clamp, Zorbit and 8" minimum tail
-
Maximum sag in wire rope less than or equal to 6"
-
Add signature