Audit date
-
Auditor
Mould prep :
-
CTQ - Are the moulds included on the mould maintenance schedule?
-
Are the mould lay up surfaces at an acceptable quality standard (chips / cracks / voids / contamination)?
Base coat gel :
-
CTQ - Is the base coat gel shelf life in date?
-
Are there any thin patches in the base coat gel?
-
Is there any contamination in the base coat gel?
-
Has the wax beading lifted?
Lay up :
-
CTQ - Is the resin shelf life in date?
-
CTQ - Are the catalyst pump increment numbers legible?
-
Is the lay up sequence correct in accordance with the relevant SOP?
-
Lay up product quality - glass fully compacted?
-
CTQ - Lay up product quality - dry glass?
Top coat gel :
-
CTQ - Is the top coat gel shelf life in date?
-
Are there any thin patches in the top coat gel?
-
Are there any runs in the top coat gel?
-
Is there any contamination in the top coat gel?
Trimming :
-
CTQ - Are there any voids in the trimmed flange?
-
CTQ - Is there any dry glass in the trimmed flange?
Drilling :
-
Are the drill jigs in good condition?
-
Do the drill holes visually align?
-
Are non-conforming panels being re-worked (if required)?
-
Has the last LPCB job card been fully completed and signed?
Despatch :
-
Has form TW199 (TIF Panel Final Inspection Log) been completed?
-
Are the Quarantine products recorded on the Quarantine Log?