Title Page

  • Conducted on

  • Prepared by: (Crew Name)

  • Job No: (eg: H12345)

Job Details

  • Client / Site: ( eg: Westfield Chermside / 141 Queen St etc. )
  • Shop/Location Name:

  • Job Start Time:

  • Number of Installers Attending:

  • List Site Personnel:

  • Please Attach Photos Of Site Prior To Job Start.

Hoarding

  • Hoarding Type

  • Hoarding Height: (In Millimetres)

  • Hoarding Linear Meters:

  • Length Of Returns:

  • Was Dust Suppression Installed?

  • Please Attach Photo

  • How Many Upright Supports on Hoarding?

  • How Many Weights on Hoarding?

  • Weights Per Upright

  • Are Anti-Tamper Tags Installed on All Stacks?

  • Is There TITAN Equipment Being Returned To HQ? (eg. Weights / Uprights)

  • How Many Uprights Returned?

  • How Many Weights Returned?

  • Is The Other Equipment Being Returned? ie. Wind Rated Components Etc.:

  • If So, Please Detail

  • Has All ERC Equipment Been Collected/Returned To Warehouse?

Safety

  • Were there any issues on site?

  • If answered yes, please provide details of issues:

  • Are You Working Above heights of 2.0m?

  • What Control Measures/Aids Are In Place?

  • Does The Public Have Access To Your Work Site?

  • What Control Measures/Aids Are In Place

  • Are You Using Corded Electrical Equipment?

  • Is All Corded Equipment Tested and Tagged?

  • What PPE Risk Prevention Measures Are In Use?

Quality

  • Is Digi-Lock In Full & Proper Working Order?

  • If Not, Please Detail What Needs To Be Done & Contact Office Immediately.

  • Please Record Digi-Lock Code

  • Are All Joins Taped and Screw Holes Concealed?

  • Are All Hoarding Panels Clean and Free From Significant Damage?

  • Add 1st Photo of Hoarding - Showing Left Hand Return

  • Add 2nd Photo of Hoarding - Showing Right Hand Return

  • Add Other Photo

  • Add 1st Photo of Hoarding - INTERNAL

  • Add 2nd Photo of Hoarding - INTERNAL

  • Add Other Internal Photo

  • Photo Demonstrating Hoarding Is Straight

  • Is The Floor Area Swept and Clear Of Debris/Screws etc.?

Compliance

  • Add Photo of Install Certificate - Fixed To Rear Of Door

  • Job Finish Time:

  • I have been adequately trained and sufficiently instructed to perform the required works safely and to the highest quality. I take full responsibility for the integrity of this construction.

  • This Hoarding has been installed in accordance with all applicable Australian Codes and Standards as per Manufacturers installation and Technical guide by qualified and trained installers.

  • Employer / Contractor Sign Off

  • Submit?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.