Title Page
-
Conducted on
-
Prepared by: (Crew Name)
-
Job No: (eg: H12345)
Job Details
-
Client / Site: ( eg: Westfield Chermside / 141 Queen St etc. )
-
Shop/Location Name:
-
Job Start Time:
-
Number of Installers Attending:
-
Completed by:
-
Please Attach Photos Of Site Prior To Job Start.
Hoarding
-
Hoarding Type
- THS Internal
- THS Wind Rated
- Protecta Hoardfast/Fastwall
- Slimline
- Bolt Down
- Other
-
Hoarding Height: (In Millimetres)
-
Hoarding Linear Meters:
-
Hoarding Linear Metres Worked On:
-
Length Of Returns:
-
Is Dust Suppression Installed?
-
Please Attach Photo
-
How Many Upright Supports on Hoarding?
-
How Many Weights on Hoarding?
-
Weights Per Upright
-
Are Anti-Tamper Tags Installed on All Stacks?
-
Is There TITAN Equipment Being Returned To HQ? (eg. Weights / Uprights)
-
How Many Uprights Returned?
-
How Many Weights Returned?
-
Is The Other Equipment Being Returned? ie. Wind Rated Components Etc.:
-
If So, Please Detail
-
Has All ERC Equipment Been Collected/Returned To Warehouse?
Safety
-
Were there any issues on site?
-
If answered yes, please provide details of issues:
-
Are You Working Above heights of 2.0m?
-
What Control Measures/Aids Are In Place?
- Platform Ladders
- EWP/Scissor Lift
- Scaffolding
- Other
-
Does The Public Have Access To Your Work Site?
-
What Control Measures/Aids Are In Place
- Caution/Barrier Tape
- Cones/Bollards
- Flagged Rope
- Bunting
- Other
-
Are You Using Corded Electrical Equipment?
-
Is All Corded Equipment Tested and Tagged?
-
What PPE Risk Prevention Measures Are In Use?
- High Vis
- Steel Capped Boots
- Gloves
- Goggles/Glasses
- Masks/Respirators
- Ear Plugs/Muffs
- HazMat/Chem Suit
- Long Pants/Sleeves
- Other
Quality
-
Is Digi-Lock In Full & Proper Working Order?
-
If Not, Please Detail What Needs To Be Done & Contact Office Immediately.
-
Please Record Digi-Lock Code
-
Are All Joins Taped and Screw Holes Concealed?
-
Are All Hoarding Panels Clean and Free From Significant Damage?
-
Add 1st Photo of Hoarding - Showing Left Hand Return
-
Add 2nd Photo of Hoarding - Showing Right Hand Return
-
Add Other Photo
-
Add 1st Photo of Hoarding - INTERNAL
-
Add 2nd Photo of Hoarding - INTERNAL
-
Add Other Internal Photo
-
Photo Demonstrating Hoarding Is Straight
-
Is The Floor Area Swept and Clear Of Debris/Screws etc.?
Compliance
-
Add Photo of Install Certificate - Fixed To Rear Of Door
-
Job Finish Time:
-
I have been adequately trained and sufficiently instructed to perform the required works safely and to the highest quality. I take full responsibility for the integrity of this construction.
-
This Hoarding has been installed in accordance with all applicable Australian Codes and Standards as per Manufacturers installation and Technical guide by qualified and trained installers.
-
Employer / Contractor Sign Off
-
Submit?