Title Page
-
This Hot Work Permit is required for any operation involving open flames or producing heat and/or sparks. This includes, but is not limited to, Brazing, Cutting, Grinding, Soldering, Thawing Pipe, Torch-Applied Roofing, and Welding.
-
Permit No.
-
Site Location
-
Conducted on
-
Prepared by
-
Nature of Job/Object
Required Precautions Checklist
-
Available sprinklers in normal automatic mode and valve open.
-
Hot Work equipment in good repair.
-
Assess 35 ft radial “sphere” of work for potential fire hazards:
-
Floors, work level and below, cleaned or protected.
-
All other combustibles removed or shielded from sparks.
-
Clean horizontal surfaces (e.g. building structures, equipment, ducts, cable trays, etc.) above and below where possible.
-
Remove flammable liquids, dust, lint, combustible waste, oil deposits, etc., where possible.
-
If removal/cleaning is impractical, protect with fire-retardant covers, or shield with fire-retardant guards and/or curtains.
-
Transmission or conveying of sparks to adjacent areas eliminated or protected.
-
Tightly cover wall/floor openings with fire-retardant material.
-
Where openings cannot be sealed, suspend fire-retardant tarpaulins to help protect areas beneath.
-
Isolate or shut down fans and conveyors to prevent the capturing and conveying sparks to other areas.
-
Explosive atmosphere eliminated or potential not present.
-
Work on walls, ceilings or enclosed equipment:
-
Construction materials verified as noncombustible and without combustible covering or insulation.
-
Combustibles on another side of walls relocated or protected.
-
Enclosed equipment cleaned and protected from all combustibles.
-
Containers purged of flammable liquids/vapors.
-
Fire watch/hot work area monitoring requirements:
-
Continuous fire watch provided during and for at least 30 minutes after hot work, including all breaks.
-
Fire watch supplied with suitable extinguishers/hoses.
-
Fire watch trained in the use of fire equipment and sounding alarm.
-
Area to be monitored hourly for a minimum 6 hours after job is completed, or longer if required.
-
Other precautions that may be required:
-
Fire watch provided for adjoining areas, above, or below.
-
Confined Space or Lock-Out-Tag-Out required/used.
-
Area smoke or heat detection disabled to eliminate false trip.
Completion
-
Full Name and Signature of Permit-Authorizing Personnel
-
Click + to add names of persons doing the hot work
Employee
-
Full Name and Signature of Person doing the hot work