Title Page
-
Project Ref:
-
Client:
-
Location
-
Current activities being undertaken on site:
-
Weather:
- Clear sky
- Cloudy / overcast
- Raining
- Windy
- Hazy
- Snow / hail
-
Min temperature today (oC ):
-
Max temperature today (oC):
-
Conducted on
-
Inspection by:
-
Accompanied by:
Inspection Checklist
CDM Compliance
-
Construction Phase Plan
-
Training (incl induction, instruction, information, competence)
-
Risk Assessments & Method Statements (RAMS)
-
Task Briefings
-
Point of Work Risk Assessment
-
Consultation, cooperation & coordination (incl Liaison, Committee, Progress Meetings)
-
Employee Safety Representative
-
Welfare Facilities & Site Accommodation (incl signage, notice boards, fire extinguishers, drying room)
-
First aid arrangements (incl appointed First Aider, eye & burns kits) / C19 Face Mask
-
Emergency Arrangements (incl fire, evacuation, spill)
-
Accident / Incident Reporting (incl Observations, Near Miss, HiPos to reporting in operation)
-
Site Team / SHE Inspections (Evidence of site team & senior management inspections)
-
Permits to Work (incl Permit to Load, Break-ground or Dig, Hot Works, WAH, Electricity, Roof work all signed & valid)
-
Subcontractor Engagement (incl Questionnaires, RAMS, Pre-start Meetings, Safety Reps)
Safe working practices observed
-
Site Security & Public Interface (incl Closed gate policy, information)
-
Slips, Trips & Falls (incl housekeeping, tidiness, storage of materials)
-
Working at Heights (incl falls, edge protection, falling objects, slopes, MEWP, ladders, scaffolding, alum towers)
-
People, Plant & Vehicle Interface (incl close proximity working, banking, segregation, reversing vehicles)
-
Working in close proximity to live services (incl u/g & o/h electrical safety, gas, utilities, wayleaves, rail, structures)
-
Traffic Management (incl access, egress, chap 8, parking, marshals, haul routes, ramps, clean roads)
-
Lifting Operations (incl LOLER, Lift Plans, AP, Crane Supervisors, Slingers Signallers, chains & slings)
-
Plant & Equipment (incl PUWER, inspections, maintenance, 360 visibility, safety pins, PAT)
-
Safety in Excavations (incl access, egress, edge protection, baulk barriers, trench support, temp works)
-
Working in Confined Spaces (incl gas detection, rescue, DSEAR)
-
Working Near or Over Water (incl life saving equip, rescue, marine management)
-
Personal Protective Equipment (PPE - incl 5 point head, body, foot, eye & ear / respiratory)
-
Occupational Health (incl noise, vibration, respiratory, manual handling, fit for work)
-
COSHH (incl assessments, MDS, emergency & first aid arrangements, storage & handling)
-
Environmental & Sustainablepractices (incl spill kits, drip trays, discharge, waste management, emissions, waste water)
-
Quality Assurance practices (incl administration, records, calibration, ITP, PQP, monitoring, NCs)
-
Any other site specific issues which need to be addressed?
-
Detail specific risk, hazard & required control measures
High Risk Operations
-
Piling Operations / Concrete (incl Piling Exclusion Zones, platforms, guide-walls, high pressure pipelines, falling debris, open bores, rebar caps, storage, signs & hazard board)
-
Piling Operations / Steel Sheet (incl Piling Exclusion Zones, platforms, temp works, hearing protection zones, pre-augering, lifting, storage, vibration)
-
Temporary Works / Working Platforms (incl FPS Certificates, inspections, testing, monitoring, access ,egress, ramps)
-
Temporary Works / Formwork (incl steel fixing, temp works, shuttering, concrete handling)
Please add observations, examples of good practice or comments
-
Any further observations?
Signed:
-
Person completing the inspection:
-
Site Supervisor: