Information

  • Project Reference / Site Name

  • Customer:

  • Conducted on

  • Prepared by Lead Engineer / Project Manager

  • Location

HSP100-5 Site Safety Checklist / Audit Sheet GBE Fire & Security

  • The purpose of this document is to enable the Project Manager, in conjunction with the lead engineer to inspect and confirm each of the listed items below. It should be noted at all times that Health & Safety is the responsibility of each individual and that each individual also has a responsibility for the safety of those around them in the course of their work duties. Each item should be completed below, Yes if acceptable, No if there is an issue and N/A if not relevant. Any Non conformities must be noted below acted upon and rectified immediately with a sign off for completion.

General

  • Has each operative signed on site in the provided logbook or passed through an electronic site access system?

  • Has each operative attended the main contractor's induction?

  • Is each operative aware of the nearest fire exit and Muster point as well as the first aid facilities and nominated First Aiders?

  • Is each operative wearing appropriate PPE for the work being carried out and in line with site requirements?

  • Is the area of work free of tools, cables, boxes etc that are not being used at that point in time for good housekeeping?

  • Are materials stored Safely and Securely on site?

  • Is there any waste or rubbish in the general area of work that has not been removed to the main Contractor's skips?

  • Is the area of work adequately lit for safe work?

  • Where necessary, has the area of work been cordoned off to protect other trades or the public?

  • Are all Risk Assessments and Method Statements available for the work being carried out and signed by all contractors/engineers on site?

Working at Height

  • Check that all equipment used for working at Height has the appropriately completed Scaff tag for that day and correctly erected?

  • Check that the person responsible for signing off each Scaff tag has received the appropriate training to enable them to do so (PASMA)?

Use of Powered Access Equipment

  • Check that all powered access equipment has received a service/safety check and that a certificate is present and within date?

  • Check that any operative using power access equipment is authorised to do so and is trained to do so. IPAF is a requirements?

  • Check that each operative using powered access equipment has the necessary additional PPE, ie: a harness, Lanyard, chin strap for hard hat etc?

Use of Hand tools

  • Ensure that all high voltage equipment has been PAT tested and the sticker indicates that a PAT test is not overdue?

  • Is suitable hearing protection provided and worn in noisy areas?

Corrective Actions

Sign off

  • I confirm I have had completed the above safety checklist on date noted below:

  • Project Manager

  • Person conducting this Audit.

  • Site Safety Checklist was concluded at:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.