GBE Work availabitly report
-
Job Number and Client Name
-
Site Location
-
Prepared by
-
Conducted on
Work available report
Work availability situation/issue
-
Item #
-
Location Description ( i.e Floor level, Drawing Reference, axe reference of drawing etc.)
-
Brief Description of issue
-
Action required
-
Photo highlighting