Title Page

  • Site conducted

  • Conducted on

  • Prepared by

Huron DX CNC milling machine service / inspection

  • Visual inspection

  • All guards fit safe and securly

  • All e-stop / safety switches fitted and operational

  • All tool clamps / accessories holder in good condition

  • Belts clean and free from debris

  • Doors operating correctly and easy to move

  • Change slide way oil

  • Change tooling head oil

  • Change hydraulic oil

  • Change gear box oil

  • Risk assessment visible

  • Carry out functional test (by trained person - trained person to sign on completion)

  • Anything else to add?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.