Information

  • Inspection Date:

Tap to enter information

  • Thermo Fisher Scientific- Patheon

  • 5900 Martin luther King Ave Greenville, NC

  • Preventive Maintenance #

  • Functional Location #

Equipment Inspection Checklist

Rooftop Units (RTU)/Make-Up Air Units (MUA)/Air Handling Units (AHU)

  • Was any Air Handling Equipment inspected i.e. /Make-Up Air/PAC/AHU/DAC

  • Packages heating/cooling rooftop (RTU) units inspected

  • Make-Up Air (MUA) equipment inspected

  • Air Handling Units (AHU) equipment inspected

  • Inspect equipment electrical disconnect(s).

  • Visual inspection of equipment housing for damage

  • Visual inspection of chill water coils coil(s) - comment on damage/if cleaning required

  • Check drain pans and p-traps- comment on damage/if cleaning required

  • Check supply air fan(s)

  • Check return air Fan(s)

  • Check winter operation components (i.e. preheat valve, freeze stat)

  • Check equipment belts and sheaves.

  • Check supply fan motor shaft and bearings.

  • Test safeties and shutoff response.

  • Check fresh air hood and louvers.

  • Inspect economizer section are in operation.

  • Check evaporator coil (indoor coil) and advise on condition

  • Check and verify controls/thermostat are in operation.

Exhaust Fans (EF)

  • Exhaust supply fan equipment inspected .

  • Inspect exhaust fan electrical disconnect(s)

  • Visual inspection of exhaust fan housing.

  • Has the exhaust fan motors/bearings been lubricated.

  • Inspect/check exhaust fan drive shafts

  • Check and adjust exhaust fan belts and sheaves.

  • Add media

Findings, Recommendations & Sign-Off

Preventative Maintenance Findings

  • Are there any equipment issues discovered during this audit?

  • Maintenance Comment: All HVAC equipment inspected is operating normally at this time.

  • Equipment Issue Summary
  • Equipment Tag/Make/Model No./Serial No.

  • Issue

  • Are there any general audit notes or comments?

  • General Maintenance Comments/Notes

Maintenance Audit Sign-Off

  • This maintenance inspection was completed as per required tasking.

  • Is there a authorized person available for a maintenance sign-off?

  • Any issues that have been discovered during this maintenance inspection has been conveyed to the appropriate personnel .

  • Authorized Signature

  • Any issues that have been discovered during this maintenance audit will have an corrective notification generated.

  • Is there someone available for a maintenance sign-off?

  • Any issues that have been discovered during this maintenance visit have been conveyed or will be conveyed to the appropriate personnel and they have advised or will advise the corrective measures that are to be undertaken. I acknowledged that Fiscom Air Systems Inc. has preformed and completed the regular scheduled maintenance inspection work as outlined herein, as per the Maintenance Agreement.

  • Authorized Signature

  • Any issues that have been discovered during this property's maintenance visit will be conveyed to the appropriate person via email and if required, they will be advise of any corrective measures that are to be undertaken.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.