Title Page
-
Site conducted
-
This inspection should be completed for each piece of HVAC equipment at each site.
For Split Systems, please fill out 2 inspections (1 for the air handler & 1 for the condenser)
For VAV, please add the total number of pieces in the the Unit Type Notes section.
For Unit Name, please refer to the below abbreviations.
AHU - AIR HANDLING UNIT
COND- AIR CONDENSING UNIT
PKG - PACKAGE UNIT
FCU - FANCOIL UNIT
FURN - FURNACE
HP - HEATPUMP -
Prepared by
-
Conducted on
-
Site ID
-
Unit Type
- Air Handling Unit
- Heat Pump
- Package Unit
- Boiler
- Chiller
- Condenser
- CRAC
- Cooling Tower
- Fan Coil Unit
- Furnace
- Mini Split
- Split System
- Dehumidifier
- Other
-
Equipment ID (Please use unit type + number. For example, the first package unit would be identified as PKG-01)
-
Location
- Roof
- Basement
- Ground
- Attic
- Mechanical Room
- Other
-
Unit Manufacturer
-
Unit Serial #
-
Unit Model #
-
Refrigerant Type
-
Capacity in Tons
-
Number of Circuits
-
Circuit 1 in lbs
-
Circuit 2 in lbs (If there isn't a second circuit, please enter zero)
-
Manufacturing Year
-
Take a Photo of Data Plate
-
Is this a split system?
-
Please identify the air handler or condenser that this piece of equipment is linked to
-
Is this HVAC unit replacing an old unit?
-
Please identify the unit that was replaced
-
Air Filter Type
-
Belt type