Title Page
-
Conducted on
-
Prepared by
-
Please select and move forward
-
Site ID
-
VUE Work Order Number
-
Unit Type
- Packaged AC
- Packaged HP
- Heat Pump
- Gas Pack
- Mini Split
- Split System
- Chiller
- Boiler
- Cooling Tower
- Roof Top Unit
- Other
-
Equipment Unit Name/# (for example, the second condenser name would be COND-02) - for split systems, please list both units
-
Replace air filter with pleated MERV 8 filter or appropriate media, initial and date filter frame in permanent marker. LEED branches require MERV 13 filters. Attach photo of new filters
-
Clean and flush evaporator drain pan, trap and drain line. Install pan tabs. Attach a picture of clean evaporator pan
-
Ensure drain is adequately sized, has proper slope and support
-
Ensure the thermostats are set to PNC standards
-
Are there any VAV or Fan powered units?
-
Replace air Filter with MERV 8 filter
-
Write Date on Filter Frame with permanent marker. LEED Branches require MERV 13 filters
-
Is this unit new and never been serviced before?
-
Please complete the Retail HVAC Assessment Survey