Information
-
Tesseract job no.
-
UPRN number:
-
Audit Title: Weekly fire alarm test
-
Client: Hyde housing
-
Site address
-
Conducted on
-
Prepared by
-
Location
-
Manager on site name:
Actions prior to testing
-
All staff on site and monitoring stations are notified of testing
Fire panel checks
-
Is panel clear of faults
-
Isolate plant or system shutdown
Manual Callpoint Test
-
Label device and activate with test key
Sounder test
-
Do all sounders/bells and beacons operate
Fire door check
-
Do all fire door hold open devices release the doors and close fully
Lift and fire dampers
-
Do Lifts / Fire Dampers and deaf alert systems operate
Log Book
-
Is log book on site
-
Device location is recorded and dated and signed
Post test checks
-
Is panel fully reset and isolations reinstated
-
Are all doors reopened
-
All staff and monitoring stations are advised that test is complete
-
Engineer name:
-
Engineer signature:
-
Site rep name:
-
Site rep signature: