Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Worksite Address
-
Start Date
Site Setup
-
Barriers and security fencing is erected directing all visitors and new workers to a safe area immediately on arrival on site
-
No person can access the work area without being inducted
-
Signage and restricted work areas are set up and are in place
-
Signage and door bell is clearly marked asking visitors and new workers to wait until the site foreman can get to them
-
Access paths from work area are clearly marked for any emergencies
-
All services (gas electricity solar water waste) have been marked, isolated or flagged
-
Any overhead power cables are either isolated or flagged
-
Dust suppression fences or water tanks are in place if required
-
Fences are set up to ensure people cannot enter restricted areas
-
Have talked with neighbours and discussed potential hazards
-
Existing building internal rooms not being worked on are isolated
-
All workers requiring supervision are known and will be supervised
Health and Safety Documents
-
The master hazard register and hazardous substances register have been modified to be specific to this site
-
The SSSP has been completed and is specific to this site and all areas of responsibility have been signed off by the appropriate people
-
Notifiable hazardous work has been identified and Worksafe NZ has been notified of these hazardous activities
-
SSSP and Task Safety Analysis documents have been received from contractors doing high risk or critical risk work on this site
-
Copies of the Health and Safety folder, the Safety Data Sheet folder and the Legislation folder are available on site
-
Task safety analysis or safe work method documents have been completed specific to this site and all workers are familiar with them
-
Copies of the following documents are available on site
- Tool Box Talk x 10
- Sign In Sign Out x 10
- LOTO x 10
-
Emergency flipcharts are in the office, sign in box, and building exits
-
Completing this shows Irving Builders has taken all reasonable steps to ensure a safe site during this project
-
Completed by: