Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Steel support
-
Has the site engineer issued Gridlines and Datums?
-
Have the correct materials been delivered?
-
Has the Steel support been installed with the correct fixing centres as per schedule.
-
Has the support steel been installed with the correct fixings as per ICS drawings?
-
Is the support steel installed to the correct centres?
-
Has the secondary steel been lined and levelled?
Sign Off.
-
On behalf of ICS
-
On behalf of Client