Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Handover

  • Client

  • Contract No

  • Building / Area: GL

  • Elements inspected

  • Has panel support/steel been checked?

  • All tapes and sealants are installed correctly?

  • Are all the panels lined and leveled?

  • All fixings are installed to the correct centres and as per ICS CI Drawings?

  • Have all the flashings been installed lined and levelled?

  • Are the walls cleaned and damage-free?

  • Inspection By: (for ICS Roofing LTD) Name

  • Inspection By: (for ICS Roofing LTD) Signature

  • Inspection By: (for ICS Roofing LTD) Date

  • Inspection By: (for Main Contractor) Name

  • Inspection By: (for Main Contractor) Signature

  • Inspection By: (for Main Contractor) Date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.