Title Page

  • Building

  • Area

  • Elevation

  • Works

  • Commencement Date

  • Certa Manager

Installation

Type of Works

  • Type of Works

Breather membrane

  • Have correct materials been delivered to site?

  • Has breather Membrane been installed in line with Certa Construction issue drawings?

  • Has Membrane been inspected by a Certa Manager?

  • Can the next stage of Installation be carried out?

  • Evidence

Galv Supports

  • Have correct materials been delivered to site?

  • Have Galv supports been installed in line with Certa Construction issue drawings?

  • Have Supports been inspected by a Certa Manager?

  • Can the next stage of Installation be carried out?

  • Evidence

Fire Barrier

  • Have correct materials been delivered to site?

  • Have brackets been fixed 250mm max from ends?

  • Have brackets been fixed 500mm max cts?

  • Has fire barrier been installed in line with latest fire strategy and Certa construction issue drawing?

  • Has fire barrier been inspected by a Certa manager?

  • HOLD POINT RELEASE

  • Can the next stage of installation be carried out?

  • Evidence

Insulation

  • Have correct materials been delivered to site?

  • Has Insulation been installed in line with Certa Construction issue drawings?

  • Has insulation been inspected by a Certa Manager?

  • Can the next stage of Installation be carried out?

  • Evidence

Mullion and Helping Hand Brackets

  • Have correct materials been delivered to site?

  • Have mullions and Helping hand brackets been installed in line with Certa Construction issue Drawings?

  • Have Mullions and Brackets been inspected by a Certa Manager?

  • Can the next stage of Installation be carried out?

  • Evidence

Rainscreen

  • Have Correct Materials been deliver to site?

  • Have Hook on Rainscreen panels been installed in line with Certa construction issue drawings?

  • Has Rainscreen been inspected by a Certa Manager?

  • Can Snagging Inspection be carried out?

  • Evidence

Firth Galvanised Deck

  • Has correct material been delivered to site?

  • Has Galv deck been installed in line with Certa construction issue drawings?

  • Had deck been inspected by a Certa manager?

  • Can next stage of installation be carried out?

Spectravap VCL

  • Has correct material been delivered to site?

  • Has VCL been installed correctly with 150mm minimum lap

  • Has spectravap jointing tape been installed correctly and consistently?

  • Has VCL and tape been inspected by a Certa manager?

  • Can the next stage of installation be carried out?

  • Evidence

Insulation

  • Has correct material been delivered to site?

  • Has Enertherm gold insulation been installed correctly with staggered joints?

  • Has insulation been fixed 9no fixings per board (15no on perimeter)

  • Has insulation been checked by a Certa manager?

  • Can the next stage of installation be carried out?

  • Evidence?

IKO Armourplan

  • Has correct materials been delivered to site?

  • Have peel tests been carried out daily?

  • Has IKO Armourplan been installed correctly with 140mm minimum lap (110 min on end lap)?

  • Have gutters been installed and checked?

  • Have walkways and extras been installed and checked?

  • Has Armourplan been checked by a Certa manager?

  • Can final QA checks be carried out?

  • Evidence

Firth Deck

  • Have correct materials been delivered to site?

  • Has deck been installed in line with Certa construction issue drawings?

  • Has butyl tape been installed as per detail?

  • Has deck been Fixed at correct centres?

  • Has deck been stitched at correct centres?

  • Has deck been checked by a Certa manager

  • Is area ready for final QA checks?

  • Evidence?

Composite roof

  • Has correct material been delivered to site?

  • Have composite panels been installed in line with Certa construction issue drawings?

  • Has butyl tape been installed correctly?

  • Has panel been fixed at correct centres?

  • Has panel been stitched at correct centres?

  • Has panel been checked by a Certa manager?

  • Can final QA checks be carried out?

  • Evidence

Primer

  • Has correct material been delivered to site?

  • Has primer been installed in line with IKO installation guidelines?

  • Has primer been checked by a Certa manager?

  • Can next stage of installation be carried out?

  • Evidence

VCL

  • Have correct materials been delivered to site?

  • Has VCL been installed in line with Certa construction issue drawings?

  • Has VCL been checked by a Certa manager?

  • Can next stage of installation be carried out?

  • Evidence?

Insulation

  • Have correct materials been delivered to site?

  • Has insulation been installed in line with Certa construction issue drawings?

  • Has insulation been checked by a Certa manager?

  • Can next stage of installation be carried out?

  • Evidence

Single Ply

  • Have correct materials been delivered to site?

  • Has single ply been installed in line with Certa construction issue drawings and IKO installation guidelines?

  • Has Single ply been checked by a Certa manager?

  • Have any walkways or extras been checked by a certa manager?

  • Can final QA checks been carried out?

  • Evidence

Composite panels

  • Has correct material been delivered to site?

  • Have composite panels been installed in line with Certa construction issue drawings?

  • Has butyl tape been installed correctly?

  • Has panel been fixed at correct centres?

  • Has panel been stitched at correct centres?

  • Has panel been checked by a Certa manager?

  • Can final QA checks be carried out?

  • Evidence

Spectravap vapour control layer

  • Have correct materials been delivered to site?

  • Has VCL been installed in line with IKO installation guidelines?

  • Has VCL been checked by a Certa manager

  • Can the next stage of installation be carried out?

  • Evidence

Enertherm Gold 140mm insulation

  • Have correct materials been delivered to site?

  • Has insulation been installed in line with IKO installation guidelines?

  • Has insulation been checked by a Certa manager?

  • Can the next stage of installation be carried out?

  • Evidence

IKO Armourplan (mechanically fixed)

  • Have the correct material been delivered to site?

  • Has Singleply been installed in line with IKO installation guidelines?

  • Has singleply been checked by a Certa Manager?

  • Can the next stage of installation be carried out?

  • Evidence

Walkways and Extras

  • Have walkways and any extra's been installed in line with Certa construction issue drawings and manufacturer guidelines?

  • Have walkways and extra's been checked by a Certa manager?

  • Can final QA checks be carried out?

  • Evidence

Snagging

Snagging

  • Have any Snags been identified?

  • Photo

  • Have Snags been Rectified?

  • Photo

Senior Manager QA Checks and Handover

Certa QA Manager Final (or Senior Certa Manager) Inspection

  • Have all items on QA form been filled in?

  • Have any 3rd party test or inspection reports been carried out?

  • Is area snag free and ready for handover?

  • Have final QA checks been carried out?

  • Is area ready for handover?

Handover

  • On behalf of Certa Roofing and Cladding LTD

  • Signature

  • On behalf of Galliford Try

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.