Information
-
Tap start to begin iDelay Report
-
This is to confirm I have checked this version of the iX721 in the current
-
Tittle : DELAY REPORT EMAIL
X FORM REF. NO. : MA-LM-X721
ISSUE NUMBER : 8 ISSUE DATE : 27.03.2014 -
BRITISH AIRWAYS ENGINEERING
X FORM
OPS FLASH CANCELLATION / DELAY REPORT : BRITISH AIRWAYS ENGINEERING
-
Sequence No :Delay 1 / 2 / 3 etc. FINAL
-
Signal Ref :
-
Station :
-
Man Hours Used ( If applicable ) :
-
Duty Engineer :
ALL FIELDS MUST BE POPULATED WITH AS MUCH DETAIL AS POSSIBLE
-
Aircraft Details
-
Registration :
-
Flight Number :
-
Aircraft Type :
-
Date :
-
D4 Notification number ( If applicable ) :
-
D6 Notification number ( If applicable ):
DEFECT DETAILS
-
Number of Defects :
-
Log Reference(s) :
-
Manual Reference(s) :
-
Defect(s) Reported :
-
Defect(s) Found :
-
Action Taken :
-
Part numbers required :
-
Spares Used :
-
QL number :
-
ASR/GFOR number raised :
DELAY DETAILS
-
Estimated Delay :
-
Actual Technical Delay :
-
Time Engineer notified of defect :
-
Who notified Engineer : Flight crew/Cabin crew/Ground staff/Maintrol* Delete not applicable
-
Delay Codes :
-
Actual Time of Arrival :
-
Actual Time Serviceable :
-
Actual Time of Departure :
-
Was Defect in AHM / Airman web :
-
Delay Contributing Factors :
-
Yes / No : In recovering this AOG Working Time Limitations are being observed and proactive steps are being taken to resource accordingly?
-
Please send to maintrol.delay@ba.com, baline.delay.extgroup@ba.com and include any en-route stations.
Save this document to your PC / LAN with document name :
DATE - A/C REG - FLT NBR - STN - DELAY 1 / 2 FINAL , ie 28AUG82 G-CIVD BA58 JNB DELAY 1/FINAL
This should also be used as the subject of the delay email.