SHOPFRONT WORKS
-
Does the Install being audited include Shopfront works?
-
Progress to the Next Section
-
Is new ACM installed flush, with good silicon joints and free from scratches and dents?
-
Is Through the Wall (TTW) Kit installed square and free from dents and scratches?
-
Are yellow inserts installed (charcoal Wall frame kits only)?
-
Are any gaps between shroud kit and machine filled with gaskets?
-
Does the ATM light in the TTW Kit work?
-
Is the correct Header Panel signage installed with correct wording?
-
Is there a second machine requiring a change of WFK (i.e. grey to charcoal)?
-
If yes to above, has WFK been changed by ITS?
-
If yes to above, have yellow inserts been provided?
-
If required, is the correct lozenge sign installed with correct wording in correct position?
-
Any other observations?
-
Enter any other observations
-
Photos to accompany any additional observations
-
If existing 2560 or 2550 retained, has correct header panel signage been installed?
-
Has any reference to “200 notes” been removed or covered up?
-
Has external security camera been installed?
INTERNAL MACHINE
-
Is new ACM installed flush, with good silicon joints and free from scratches and dents?
-
If non-flat ribbon, is the acm free of sharp corners and burrs?
-
Is Through the Wall (TTW) Kit installed square and free from dents and scratches?
-
Are yellow inserts installed (charcoal Wall frame kits only)?
-
If 4080SC in flat ribbon, has steel shroud surround been installed in yellow or have yellow film applied?
-
Are any gaps between shroud kit and machine filled with gaskets?
-
Does the ATM light in the TTW Kit work?
-
Is the correct Header Panel signage installed with correct wording?
-
If required, is the correct lozenge sign installed with correct wording in correct position?
-
Has any reference to “200 notes” been removed or covered up?
-
Is there a second machine requiring a change of WFK (i.e. grey to charcoal)?
-
If yes to above, has WFK been changed by ITS?
-
If yes to above, have yellow inserts been provided?
-
Any other observations?
-
Enter any other observations
-
Photos to accompany any additional observations
LOBBY MACHINES
-
Does the Audit include Lobby Machines?
-
Progress to the Next Section
-
Is new ACM installed flush, with good silicon joints and free from scratches and dents?
-
If non-flat ribbon, is the acm free of sharp corners and burrs?
-
Is Through the Wall (TTW) Kit installed square and free from dents and scratches?
-
Are yellow inserts installed (charcoal Wall frame kits only)?
-
If 4080SC in flat ribbon, has steel shroud surround been installed in yellow or have yellow film applied?
-
Are any gaps between shroud kit and machine filled with gaskets?
-
Does the ATM light in the TTW Kit work?
-
Is the correct Header Panel signage installed with correct wording?
-
If required, is the correct lozenge sign installed with correct wording in correct position?
-
Has any reference to “200 notes” been removed or covered up?
-
Is there a second machine requiring a change of WFK (i.e. grey to charcoal)?
-
If yes to above, has WFK been changed by ITS?
-
If yes to above, have yellow inserts been provided?
-
Is the coin return chute for the 4080SC or Scan coin unit installed correctly and free of any sharp corners?
-
Have new lobby floor finishes been installed?
-
If new floor tiling installed, are joints filled with grout, with tiles level and no trip hazards?
-
Have existing floor finishes meeting tiles been separated by trim and ramped suitably so as not to cause a trip hazard?
-
If new carpet installed are all cut edges free from fraying ends and level?
-
-
If new set plasterboard ceiling installed, has setting been carried out correctly and painting of sufficient quality?
-
If concertina door track has been installed, is the junction with the ceiling neat and the track free of setting compound and/or paint?
-
Are any in-ceiling services in the set ceiling installed correctly?
-
Are junctions between new and old ceilings neat and tidy?
-
Has a concertina door been installed?
-
If concertina door has been installed, is door working and locking correctly and have staff been shown how to use the door properly?
-
-
-
Any other observations? (i.e.Fast deposit relocated, new CDS9 or BCM installed, penguin relocated etc.)
-
Enter any other observations
-
Photos to accompany any additional observations
-
-
-
If any new walls or doors have been installed, is setting sanding and painting of sufficient quality?
-
-
If any new CCTV cameras were required, have these been installed in accordance with plans?
-
If any new alarms/reed switches etc were required, have these been installed in accordance with the plans?
BUNKER VIEW
-
Is the machine free from scratches, dents and damage?
-
Has the opening around the machine been appropriately finished (i.e. melamine)?
-
Are power and data points in good working order and easily accessible?
-
Are cables neat and tidy and not a trip hazard? (in public space should be in conduit)
-
Are any new floor finishes installed correctly, with no trip hazards, ragged edges or damage?
-
Have edges of cut slab been finished neatly in appropriate finish?
-
Do steps have appropriate nosings?
-
Are edges of slab lower safe from tripping and if required, handrail installed?
-
Is handrail compliant?
-
Have any hazards been created by lowering the slab?
-
If any doors to bunker were removed and reinstated, has work been finished satisfactorily?
-
Has security camera been installed with view to rear of IDM?
-
Any other observations?
-
Enter any other observations
-
Photos to accompany any additional observations