  • AUDIO PERFORMANCE

AP-100: Surround Sound Equalization

  • 1) Verify setup mic was used for EQ of all surround sound rooms. 2) Verify each input has the correct surround mode enabled.

  • VIDEO PERFORMANCE

VP-100: Display Alignment

  • 1) For Displays: Verify that the display is level and that the security screws are in place. Also verify that any cabling behind displays are accessible yet not visible.<br>2) For Projectors:L Verify that the projected image is correctly filling the screens surface. Also verify that any devices or cabling located above the projector are accessible and organized.

VP-101: Test Video Routes

  • 1) Verify that all video routes are tested from endpoint to endpoint via the appropriate midpoints for operation and routing required by the project documentation.

  • CONTROL PERFORMANCE

CON-100: Control System Functionality

  • 1) Verify that the AV control system interfaces with all devices. <br>2) Verify that all buttons on the control panel are functioning and page flips are working properly.<br>3) Verify that the commands are functioning properly (i.e. volume meters, mute, power and lighting if applicable).

CON-101: Macros

  • 1) Verify all macros function properly and have correct delays during normal operation. 2) Verify "OFF" command triggers all applicable equipment.

  • PHYSICAL ENVIRONMENT

PHYSE-100: Clean Building Handover

  • 1) Verify that the area is clean and dust free and suitable for equipment installation and that no further work is planned that will release contaminants into the Av equipment area.<br>2) Verify that the area released is isolated from any areas not yet completed.

  • PHYSICAL INSTALLATION

PHYSI-100: Plum, Level and Square

  • 1) Verify that all AV equipment ( wall plates, control panels, etc) have been installed, aligned or angled correctly as defined in the project documentation. Level and plum are the default requirements unless otherwise defined in the project documentation.

  • DOCUMENTATION

DOC-100: Product Information

  • 1) Verify all product specific manuals and remotes are delivered to customer simultaneously. 2) Verify all unused equipment and accessories are returned to stock using proper paperwork.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.