Enabling info

  • SAP work order

  • Please select main work type - TUP

  • Conducted on

  • Tap location to geo reference where enabling being carried out
  • Add media

  • Please enter address location if not as IMR form indicates or do not have GPS connection

  • Add detail

Site specifics

  • Geo tag location of works to be carried out (may differ from IMR form)
  • Please take photos of site applicable to works location and comment.

  • Comments

  • Please select TM requirements

  • Please add any additional TM requirements here.

  • Add media

  • Please select road speed and applicable road type.

  • Comments.

  • Add media

  • Please enter ground conditions at observed ground level.

  • Please add any additional info.

  • Comments

  • Add media

  • Depth to pipe

  • Assumed depth of excavation

  • Meterage of repair

  • Flow %

  • Pipe size

  • Pipe material

  • Please enter MH cover size

  • If non standard size please add info.

  • Comments

  • Photos of cover (with tape measure also)

  • Sewer type

  • Sewer system

Job requiements

  • Site Hazards identified

  • Please comment where applicable

  • Comments

  • Add media

  • Environmental and other hazards.

  • Please comment where applicable

  • Add media

  • Additional site photos

  • Photo information

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.