Information

  • Document No.

  • Audit Title

  • Facility Name

  • Permit Number

  • Conducted on

  • Site Activities

  • Current Weather Conditions

  • Inspector, Title

  • Type of Inspection

  • Location
  • Location of discharge or samples collected

  • Add media

  • Locations
  • I certify that this report is true, accurate, and complete, to the best of my knowledge and belief.

Checklist

  • Have observations been made regarding the location of sampling or where stormwater associated with industrial activity is discharged to waters of the state, or to a storm sewer system that drains to waters of the state in accordance with Part I.G.2.a?

  • Have observations been made for the presence of floating materials, visible oil sheen, discoloration, turbidity, odor, etc. in the stormwater discharge(s) per Part I.G.2.b?

  • Have observation been made of the condition of and around stormwater pitfalls, including flow dissipation measures to prevent scouring per Part I.G.2.c?

  • Have observations been made in accordance with Part I.G.2.d of the presence of illicit discharges or other non-permitted discharges?

  • Are all descriptions of potential pollutant sources required under this permit accurate?

  • Has the site map been updated to in the SWMP to reflect the current conditions?

Storm Event Info

Rain Event

  • Date, time of the start of discharge, time of sampling, duration (in hours) of the rainfall event, and magnitude (in inches) of the storm event sampled

  • Duration between the store event and the end of the most recent storm event that produced a discharge

Snowmelt Event

  • Date of the sampling event during snowmelt

Sample Info

  • Was a grab sample collected? How many?

  • Were the grab samples collected within the first 30 minutes of a measurable storm event?

  • Name and title of personnel collecting the sample

Sample 1

  • Location
  • Date collected

  • Nature of discharge

Sample 2

  • Location
  • Date collected

  • Nature of discharge

Sample 3

  • Location
  • Date collected

  • Nature of discharge

Sample 4

  • Location
  • Date collected

  • Nature of discharge

Sample 5

  • Location
  • Date collected

  • Nature of discharge

Sample 6

  • Location
  • Date collected

  • Nature of discharge

Visual Assessment

Visual Assessment

  • Color

  • Odor

  • Clarity

  • Floating Solids

  • Settled Solids

  • Suspended Solids

  • Foam

  • Oil Sheen

  • Other obvious indicators of stormwater pollution

Facility Inspection

Check Dam (N. of Office)

  • Is check dam free of damage and signs of erosion?

Rock Socks (Surrounding N. Dam)

  • Are rock socks free of damage and performing their respective duties?

Check Damn (S. side of parking)

  • Is check dam free of damage and signs of erosion?

Rock Socks (Surrounding S. Dam)

  • Are rock socks free of damage and performing their respective duties?

Tenants

  • Is GMCO in compliance with all environmental regulations and expected best management practices?

  • Is Martin Marietta in compliance with all environmental regulations and expected best management practices?

  • Is the pipe fitter company in compliance with all environmental regulations and expected best management practices?

Retention Pond

  • Is the designated outfall into the pond free of debris and waste materials?

  • All drainage paths to pond free of erosion pathways and debris?

  • Is pond free of deficiencies or problems?

Material Stockpiles

  • Are material stockpiles free from signs of weather and water erosion?

Other

  • Are there any other non-compliance issues discovered during the inspection? (No = No discrepancies noted)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.