Information

  • Audit Title

  • Client / site

  • Current Weather Conditions

  • Conducted on

  • InFocus Safety Solutions, Inc.

  • Khoi Nguyen, Risk Management/Loss Control Manager

  • Chris Tiamzon, Safety/Loss Control Consultant

1. Working at Heights

  • 1.1. Fall risks of 6 feet or more? (including voids, pits, and trenches)

  • 1.2. Lack of edge protection?

  • 1.3. Unsafe or incomplete edge protection?

  • Subcontractors Observed Violating Section:

2. Construction Tools and Equipment

  • 2.1. Unsafe or damaged equipment? (including missing or damaged guards)

  • 2.2. Incorrect equipment for job? (e.g. grinding discs for cutting)

  • 2.3. Unsafe or incompatible attachments used with equipment?

  • 2.4. Unlicensed operators?

  • 2.5. Lack of fire extinguishers nearby? (Required for all internal combustion equipment).

  • 2.6. Lack of training in safe operation, clean-up and maintenance?

  • 2.7. Are electrical cords inspected and properly marked?

  • 2.8. Are GFCI cords used?

  • Subcontractors Observed Violating Section:

3. Scaffolds

  • 3.1. Scaffolds inspected and green tagged by a competent person?

  • 3.2. Lack of inspection protocol for scaffold?

  • 3.3. Unsafe or incomplete scaffold?

  • 3.4. Incompatible scaffold components? Planks properly rated for scaffold use?

  • 3.5. Safe Work Load (SWL) exceeded? (tools, stored materials, number of persons)

  • Subcontractors Observed Violating Section:

4. Lifting Equipment

  • 4.1. Unsafe or damaged equipment? (hydraulic leaks, oil leaks)

  • 4.2. Loads lifted over persons, close proximity to obstacles incl. overhead power lines?

  • 4.3. Operators wearing seat belts during operation?

  • 4.4. Backup alarm observed?

  • 4.5. Lack of daily inspection protocol?

  • 4.6. Unsafe or damaged lifting equipment, including ropes, slings, chains, hooks?

  • 4.7. Spotter/flagged observed when loads obstruct operator's view?

  • 4.8. Unlicensed operators?

  • 4.9 Are forks lowered when equipment is parked?

  • 4.10. Are any lifting equipment capacity exceeded?

  • Subcontractors Observed Violating Section:

5. Harness and Equipment

  • 5.1. Unsafe or damaged harness or equipment?

  • 5.2. Incompatible hooks/equipment?

  • 5.3. Unlabelled or does not meet manufacturer's specifications?

  • 5.4. Unsafe or uncertified anchor points?

  • 5.5. Lack of inspection protocol for equipment?

  • 5.6. Lack of or inadequate formal training for operators?

  • Subcontractors Observed Violating Section:

6. Ladders

  • 6.1. Unsafe or damaged ladders?

  • 6.2. Unsafe positioning of ladders?

  • 6.3. Ladder not properly secured?

  • 6.4. Ladder unsuitable for job? (e.g. metal ladder used for electrical work)

  • Subcontractors Observed Violating Section:

7. At Risk Manual LiftingTasks

  • 7.1. Proper lifting techniques observed?

  • 7.2. Carts used to move materials?

  • 7.3. Inadequate risk controls? (examples: no job rotation, lighter loads, trolleys, lifting equipment, etc)

  • 7.4. Lack of training in risk controls and safe lifting/ team lifting techniques?

  • Subcontractors Observed Violating Section:

8. Hazardous Chemical (including fuel and oil)

  • 8.1. Unsafe storage location? (e.g. flammables near ignition sources, spills could enter stormwater drains, etc)

  • 8.2. Incompatible chemicals stored near each other?

  • 8.3. Inadequate spill containment equipment?

  • 8.4. Safety Data Sheets not accessible on site?

  • 8.5. Lack of emergency procedures for injury/spills/fire etc?

  • 8.6. Excessive quantities stored on site or in vehicles?

  • 8.7. Insufficient ventilation?

  • 8.8. Insufficient, or incorrect, PPE?

  • 8.9. Unsuitable storage containers? (unlabeled or stored in food containers)

  • Subcontractors Observed Violating Section:

9. Emergency Response

  • 9.1. Lack of, or no emergency plans for site?

  • 9.2. Emergency procedures not displayed at site?

  • 9.3. Lack of training and rehearsal of emergency plans?

  • 9.4. Lack of, or inadequate first aid kits aid equipment for site?

  • 9.5. Insufficient access to formally trained First Aiders for all shifts?

  • 9.6. Unsuitable or inadequate communication equipment?

  • Subcontractors Observed Violating Section:

10. Hot Work Operations

  • 10.1. Is fire watch in place?

  • 10.2. Fire extinguisher available? <br>

  • 10.3. Sparks from grinding and cutting are shielded from flammables/combustibles?

  • Subcontractors Observed Violating Section:

11. Personal Protective Equipment (PPE)

  • 11.1. Lack of, or inadequate PPE

  • 11.2. Lack of system to issue, inspect, replace and monitor PPE?

  • 11.3. Lack of training in safe use, clean-up and inspection of PPE?

  • Subcontractors Observed Violating Section:

12. Work Environment

  • 12.1. Lack of/or inadequate amenities? (toilets, wash areas, lunch rooms, etc)

  • 12.2. Insufficient lighting?

  • 12.3. Inadequate housekeeping?

  • 12.4. Lack of, or inadequate noise/ vibration control?

  • Subcontractors Observed Violating Section:

13. Electrical Hazards

  • 13.1. Unsafe electrical leads? (damaged, out of test date or untested)

  • 13.2. Temporary power supply secured?

  • 13.3. Contact with underground utility lines?

  • 13.4. Contact with overhead electrical lines?

  • 13.5. Overloading outlets?

  • 13.6. Leads placed on ground or on metal structures?

  • 13.7. Electrical equipment near water?

  • 13.8. Electrical equipment near flammables?

  • 13.9. Electrical equipment near chemicals that could cause damage?

  • 13.10. Electrical leads that may be damaged from contact with moving machinery parts?

  • 13.11. Electrical leads on work surfaces?

  • 13.12. Lack of Lock-out/tag-out (LOTO) procedures for electrical equipment?

  • Subcontractors Observed Violating Section:

14. Environmental Hazards

  • 14.1. Lack of/or inadequate Environmental Management plan (EMP)?

  • 14.2. Lack of/or inadequate, dust suppression system?

  • 14.3. Lack of/or inadequate systems to prevent contaminants entering stormwater drains?

  • 14.4. Lack of water re-use systems?

  • Subcontractors Observed Violating Section:

  • Other Hazards noted?

Corrective Actions

  • Enter any corrective actions that are pending

Sign Off

  • InFocus Consultant's Signature

  • Tasks performed by InFocus Safety Solutions, Inc. today

  • New hire orientation

  • Jobsite inspections

  • Pre task plan reviews

  • Corrective actions

  • Subcontractor coaching

  • Email Report to:

  • Bill Bunch

  • Jason Oak

  • John Diaz

  • Joe Nelson

  • Alan Thomas

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.