Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
JOB SPECIFICS
-
WORKS ORDER DETAILS
-
Claim Number
-
For Hub
-
Requested By
-
Purchase Order Number
-
Works Order Number
-
The person in control of the job is :
- Nick Donald 0210456296
- Clifton Huger 0221926283
- Jason Pickering 0273378051
- Tracy Ford 021387229
- Harry Thompson 0221987007
- Daniel Pinto 02102687090
-
The person in control of the job is :
-
CLIENT DETAILS
-
Owners Name
-
Owners Contact Details
-
Tenants Name
-
Tenants Contact Details
-
Access Details (who to call, key given or left etc)
INITIAL INSPECTION
-
BUILDING TYPE
-
The Building Is
-
The Building is on
-
Is the home in a damp environment?
-
Floor Area M2
-
Internal Stud Height M
-
Comments:
-
HEALTH ISSUES
-
Is respiratory distress common?
-
Are occupants suffering from asthma that has worsened?
-
Are occupants suffering nose bleeds?
-
Are occupants suffering headaches?
-
Do occupants suffer from itchy eyes?
-
Do occupants suffer from rashes and/or skin lesions?
-
Do occupants notice an improvement when they leave the home for a period of time?
-
Comments
-
PSYCHOMETRIC CONDITIONS
-
Outdoor Temperature
-
Ambient Outdoor RH%
-
Indoor Temperature
-
Indoor RH%
-
Sub Floor Temperature
-
Sub Floor RH%
-
Equilibrium RH%
-
Moisture Content is (WME%)
-
CAUSE OF WATER INTRUSION
-
Rising Damp
-
Is there rising damp due to earthquake (explain)
-
Is rising damp from liquefaction under the floor?
-
Presence of liquefaction is
-
Consistency of Liquefaction is:
-
Is mould present?
-
Is sewage present?
-
Is pungent Odour present?
-
Is there water intrusion to the building envelope due to liquefaction?
-
Would you recommend removal of liquefaction?
-
Leaking Water/Drain Pipe
-
Is Water intrusion due to a leaking pipe?
-
Has leak been fixed?
-
Was leak caused by a sudden event?
-
Where is/was leak?
-
Photo
-
Weather Penetration
-
Is water intrusion due to leak in roof or building envelope?
-
Has leak been fixed?
-
Was leak caused by a sudden event?
-
Where is/was leak?
-
Photo
-
MOULD INSIDE
-
What type of mould exists inside?
-
Where is the mould located?
-
Photo
-
Does mould need to be physically removed?
-
MOULD IN SUB FLOOR
-
What type of mould exists under floor?
-
Where is the mould located?
-
Photo
-
Does mould need to be physically removed?
-
REMEDIATION STRATEGY RECOMENDATIONS
-
ECC/AIR IMPACT Testing of recommended?
-
Samples Taken?
-
Sample taken by:
-
Pre works 'make safe' subfloor decontamination recommended?<br> (Basic treatment to ensure the health and safety of tradesmen working in the area)
-
Pre works 'make safe' internal decontamination recommended?<br> (Basic treatment to ensure the health and safety of tradesmen working in the area)
-
Removal of Liquefaction Recomended?<br> (observations, access etc)
-
Mechanical drying of underfloor most likely required?<br> (estimated timeframe if known)
-
Placement and/or replacement of DPM in subfloor?
-
Physical removal of mould most likely required?
-
Mechanical drying inside home most likely required?<br> (estimated timeframe if known)
-
Post works FULL subfloor decontamination recommended?<br> (include notes re drying required etc)
-
Post works FULL internal decontamination recommended?<br> (include notes re drying required etc)
-
CONCLUSION
-
Recommended PPE Requirements prior to/or without 'make safe' decontamination treatment
-
Recommended PPE Requirements prior to/or without Full decontamination treatment
-
Recommended PPE Requirements post 'make safe' decontamination treatment
-
Recommended PPE requirement post FULL decontamination treatment
-
Comments
-
Quote for Recommended Remediation Provided?
SITE SPECIFIC SAFETY PLAN
1. WORKPLACE CONTROL AND HEALTH AND SAFETY MANAGEMENT
-
The on-site safety representative (SR) for this project is
- Nick Donald 0210456296
- Clifton Huger 0221926283
- Jason Pickering 0273378051
- Tracy Ford 021387229
- Harry Thompson 0221987007
- Daniel Pinto 02102687090
-
The person in control of the workplace is :
2. NOTIFIABLE WORKS
-
We have Notifiable Works associated with our subcontract
-
DoL will be advised of Notifiable Works upon acceptance of quote
3. HAZARD MANAGEMENT
-
We will maintain an onside Hazard Register of all existing and new hazards and appropriate controls
-
We will prepare a written Task Analysis covering all significant hazards associated with our works, in conjunction with employees, and give it to site management before any work involving that hazard commences onsite
-
Are there hazardous products/processes associated with our subcontract works?
-
Appropriate Safety Data Sheets have been supplied to the main contractor?
-
Appropriate Safety Data Sheets have been are available on site?
4. COMMUNICATION/EMPLOYEE PARTICIPATION
-
The methods we use to communicate safety information to our employees are:
-
Daily Toolbox Talks - including covering site hazards and emergency/evacuation procedures
-
Monthly Health and Safety Meetings - covering use of equipment, hazards encountered
-
Pre-task Planning Meetings - Done first Visit to site post quote approval
-
Co-ordination Meetings
-
Other
-
Urgent Safety Updates are e-mailed and/or TXT to all staff and put on the router for the next Health and Safety Meeting
5. EMERGENCIES
-
Emergency Kit One (First Aid Kit, Confined space emergency kit, Fire Extinguisher) is located
-
Emergency Kit Two (First Aid Kit, Confined space emergency kit, Fire Extinguisher) is located
-
We have trained First Aid personnel and procedures in place on site to render assistance in the event of an accident/emergency
-
Our Designated Warden/First Aid person is
- Nick Donald 0210456296
- Clifton Huger 0221926283
- Jason Pickering 0273378051
- Tracy Ford 021387229
- Harry Thompson 0221987007
- Daniel Pinto 02102687090
-
In the event of a site emergency or evacuation our personnel will report to our safety representative and assemble at the evacuation area shown on the Emergency Evacuation Plan
-
We have an Emergency Plan for all hazardous products and processes referred to in section 3 above
-
EMERGENCY PLAN AND PROCEDURES FOR HAZARDOUS WORK
-
Emergency Procedure: Evacuate to meeting point specified below, Role call, Dial 111 Emergency Services and/or administer First Aid if required
-
Evacuation Plan for all Emergency Situations: Alarm Evacuation, Unsound Building, Earthquake, Fire, Tsunami, Other
-
Evacuation Plan 3: Other
6. ACCIDENT/INCIDENT: REPORTING/INVESTIGATION/RECORDING
-
We have an accident/incident reporting/investigation system in place and keep an Accident/Incident Register
-
We will immediately notify all serious harm accidents to site management and follow up within 7 days with a completed copy of the Accident and Incident Investigation Report
7. SAFETY INSPECTIONS AND SAFETY REVIEWS
-
We agree to undertake safety inspections and reviews at the intervals required by the Safety Activity Monitoring Register Wall Chart
-
A sample of documentation of our safety inspections has been sent to the main contractor
8. TRAINING/INDUCTION
-
All persons under our control hold current passports or induction pass cards as required
-
All persons under our control on site are given a site specific safety induction
-
All persons under our control on site are appropriately qualified, competent or fully supervised
9. SUBCONTRACTORS
-
Will we have subcontractors working for you on this project
-
Subcontractors to provide SSSP
-
Subcontractors to provide Task Analysis
SIGNATURE
-
Signature of Technician Compiling SSSP
-
Time and date Task Analysis Complete
TASK ANALYSIS
-
GENERAL STEPS
-
Step 1: Assess property for external hazards
-
Step 2: Familiarise customer with process and requirements
-
Step 3: Erect signs and barricades and/or check existing signs and barricades
-
Potential Hazard:
-
Control Methods:
-
Step 4: Don PPE according to task requirements as below
-
---------------------------------------------------------------------------------------------------------------------------------------------------------
-
Step 5: As per task below
-
---------------------------------------------------------------------------------------------------------------------------------------------------------
-
Step 6: Remove PPE
-
Potential Hazard:
-
Control Methods
-
Step 7: Ensure any signage being left onside is secure and visible
-
Step 8: Remove signage not being left onsite
-
Step 9: Check site and leave
-
ECC AND/OR AIR SAMPLING
-
A) Follow steps 1-4 of general
-
B) Load in equipment
-
Potential Hazard:
-
Control Methods:
-
C) Record observations including clients comments
-
D) Take samples as required
-
Potential Hazard:
-
Control Methods:
-
E) Follow steps 6-9 of general
-
DECONTAMINATION OF CRAWL SPACE
-
A) Follow steps 1-4 of general
-
B) Ensure all occupants and pets are out of the area to be decontaminated
-
Potential Hazard:
-
Control Methods:
-
C) Block all foundation vents
-
D) Load in equipment
-
Potential Hazard:
-
Control Methods:
-
E) Load in disinfectants and ensure they are safely stored and mixed
-
Potential Hazard
-
Control Methods
-
F) Treat Subfloor
-
Potential Hazard:
-
Control Methods:
-
G) Follow steps 6-9 of general
-
DECONTAMINATION OF INTERNAL ENVELOPE OF PROPERTY
-
A) Follow steps 1-4 of general
-
B) Load in equipment
-
Potential Hazard:
-
Control Methods:
-
C) Load in disinfectants and ensure they are safely stored and mixed
-
Potential Hazard
-
Control Methods
-
D) Take pre-air samples
-
Potential Hazard:
-
Control Methods:
-
E) Ensure all occupants and pets are out of the area to be decontaminated
-
Potential Hazard:
-
Control Methods:
-
F) Apply surface treatments
-
G) Set VHP and close up home
-
H) Follow steps 6-9 of general
-
POST TREATMENT SAMPLING
-
A) Follow steps 1-4 of general
-
B) Upon Re-entry, test VHP levels. Only re-enter if safe to do so
-
Potential Hazard:
-
Control Methods:
-
C) Take Post Samples
-
Potential Hazard:
-
Control Methods:
-
Signature of Technician Compiling Task Analysis
-
Time and date Task Analysis Complete
CHECKLIST
-
Initial inspection report complete?
-
SSSP Complete?
-
Task analysis complete?
-
Quote complete