Non Conformance Report
-
NCR Reference Number
-
Date raised
-
Prepared by
-
Internally or Externally raised
-
If external, detail client name
-
Team involved
- Yindi-Fluid Management
- Yindi-Fluid Field
- Xylem Water Solutions
- AWMA Water Control
- Flood-Free AWMA
- Other Client
- Internal YG FPG Workshop
-
Site Location
Details of Non Conformance
-
Category of Non-conformance
- Process
- Installation
- Health and Safety
- Communication
- Equipment Failure
- Design & Engineering
- Fabrication
-
Non-conformance rating
-
Description of Non-conformance
-
Supporting information
Root cause analysis
-
Methods of investigation
- Mechanical testing - Operationally
- Electrical testing
- Process & equipment
- Engineering - Measure & confirm
- Visual Inspection - Equipment Failure
- Visual Inspection - Damage
- Visual Inspection - Installations
- Visual Inspection - Connections
-
Immediate cause of NCR
-
Any underlying causes of NCR
-
Root cause of NCR
-
Agreed actions
-
Corrective actions
-
Corrective actions - Methodology
-
NCR Raised & Issued to
- Site Supervisor - Client
- Site Supervisor - YG-FPG
- Site - Other Contractor
- Engineering team
- Internal YG-FPG Management
- Health & Safety Team
- Manufacturer of equipment
- Other parties affected
-
Who?
-
Who?
-
Who?
-
Agreed preventative actions
-
Do any changes need to be implemented in ongoing procedure?
-
Note the changes required to policy & methodology
Close off
-
Actions completed
-
Signed off on completion
Approval
-
Date and time of approval
-
Approver's signature