Title Page
-
Audit number
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1.0 General
-
Everyone has completed company induction?
-
Everyone Site Inducted?
-
Presrart Toolbox Completed within last week?
-
Photo of last Toolbox if available?
-
Have all staff read understood and signed the current SWMS/JHA for works?
-
Have all workers understood and signed the site SMPs?
-
Have any Health & Safety concerns been raised by crew & have they been correctly dealt with?
-
Last Audit was Complete on;
-
Is there any outstanding Items from the last inspection?
2.0 Housekeeping & Materials zone
-
Is there good evidence of stacking and storage practices being used?
-
Access & Egress ways are kept clear?
-
Are exclusion zones being used and in place?
-
Is standard safety signage posted at key locations? (Incomplete, Do Not Use, etc)
-
Is Scaffold tag system in place & relevant dates displayed?
3.0 PPE - Sufficient & Correctly being used?
-
Hard Hat AS/NZS Compliant
-
Steel Cap Work Boots AS/NZS Compliant
-
Hi-Vis Work Shirt AS/NZS Compliant
-
Gloves AS/NZS Compliant
-
Eye Protection AS/NZS Compliant
-
Ear Protection where needed being used?
-
Harnesses & Lanyards correctly applied and adjusted?
4.0 Fall Protection Equipment
-
Has the Company inspection register been kept up to date?
-
Quarterly tagging visible on all fall arrest/restraint equipment onsite?
5.0 Working At Heights
-
Is the task being carried out to AS/NZ STANDARDS?
-
Have the crew adopted the 1m build technique by installing the full deck of boards 1m below and working from 2 fixed boards minimum ? (No timber LVLs)
-
Are handrails being used to non working build lifts where a person could fall?
-
Has crew installed Access/Egress at the earliest opportunity between lifts?
6.0 Lifting Opperations (Gin Wheel)
-
Gin Wheel is correctly positioned and fixed?
-
Is the area below the lifting point cordoned off?
-
Have users got knowledge of knots?
-
Is the rope of the Gin Wheel free from defects and suitable?
-
Are fittings and small items being raised and lowered in purpose built lifting bags?
7.0 Workmanship & Structual Integrity
-
Is Scaffold built in accordance with AS/NZ STANDARDS?
-
Are ALL ties to Plan and recorded in the tie register?
-
Are tie BOA coils torqued and Hilti screw anchors installed as per manufacturers specifications?
-
Are ladders used tied at both sides and at a 4:1 ratio in good working order?
-
Are all platforms fully boarded with Toe Boards, Hand & Mid Rails correctly fixed?
-
Have Gates been Installed at key ladder/stair access points?
-
Are company procedures being followed for checking/maintaining equipment being implemented?
-
Safe stacking practices observed eliminating unsecured items?
-
Safe storage of material observed at height whilst building or stripping?
-
Are there any gaps greater than 225mm off the main working deck or 300mm above or below the main working deck where there is a risk of falling objects?
-
Is scaffold deck #1 clear of building debris?
-
Photos of deck #1
-
Is scaffold deck #2 clear of building debris?
-
Photos of deck #2
-
Is Scaffold deck #3 clear of building debris?
-
Photos of deck #3
-
Is scaffold deck #4 clear of building debris?
-
Photos of deck #4
-
Is Scaffold deck #5 clear of building debris?
-
Photos of deck #5
-
Is Scaffold deck #6 clear of building debris?
-
Photos of deck #6
-
Supervisor/ Lead Hand
-
Inspector
-
Site representitive
-
QSAS Manager