Title Page

  • Job name and number

  • Document number

  • Prepared by

  • Conducted on

  • Location

Audit Checklist

    Rough in
  • Mains at DB.

  • Power circuits at DB.

  • Light circuit at DB.

  • AC circuits at DB

  • All circuits taped and labelled at DB.

  • All wall point set outs checked to architecturals and electrical plans.

  • All actives and switch wires at switches and taped.

  • All light points roughed in.

  • Light points marked on floor or plan where required.

  • Fans roughed in with sdi where required.

  • Smokies roughed in

  • Fan, smokies and balcony lights battoned where required.

  • All GPOs roughed in.

  • AC circuits brought out at isolater location

  • TV points roughed in (is data required)

  • Data to each phone or data point.

  • Equipotential bonds installed

  • Cables bushed where necessary.

  • Cable supports installed

  • Segregation maintained.

  • NBN extended down to final location.

  • All fire rating complete and registered.

  • Sign

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.