Title Page
-
Job name and number
-
Document number
-
Prepared by
-
Conducted on
-
Location
Audit Checklist
- Rough in
-
Mains at DB.
-
Power circuits at DB.
-
Light circuit at DB.
-
AC circuits at DB
-
All circuits taped and labelled at DB.
-
All wall point set outs checked to architecturals and electrical plans.
-
All actives and switch wires at switches and taped.
-
All light points roughed in.
-
Light points marked on floor or plan where required.
-
Fans roughed in with sdi where required.
-
Smokies roughed in
-
Fan, smokies and balcony lights battoned where required.
-
All GPOs roughed in.
-
AC circuits brought out at isolater location
-
TV points roughed in (is data required)
-
Data to each phone or data point.
-
Equipotential bonds installed
-
Cables bushed where necessary.
-
Cable supports installed
-
Segregation maintained.
-
NBN extended down to final location.
-
All fire rating complete and registered.
-
Sign