Title Page

  • Project Name

  • Job Number

  • Date

  • Prepared by

  • Position Title

  • Location
  • DB Name

Pre Outage Inspection

Pre-Outage Distribution Board

  • Pre-Outage CB No. where DB is fed from

  • Pre-Outage CB Current Rating

  • Pre-Outage Cable Size

  • Pre-Outage Earth Cable size

  • Photos

Pre-Outage DB Energised

  • Pre-Outage 10 Point Voltage Test: Record any out of the ordinary results. Record Neutral to Earth Voltage. Record one Phase to Neutral, Phase to Earth and Phase to Phase result for reference.

  • VT1 - Phase to Neutral

  • VT2 - Phase to Earth

  • VT3 - Phase to Phase

  • VT1 - Neutral to Earth

  • Further investigation required

  • Pre-Outage Phase Rotation

  • Test Location: Energized Equipment Line side of Main Switch

  • Connection Method: Red, White, Blue leads on meter to match the Circuit Left to right (Not the cable colours)

  • Rotation test

  • Mark Rotation on the switchboard

  • Photo of the results

Pre-Outage DB De-energised

  • Ensure DB is isolated and LOTO procedures are in place

  • Pre-Outage Insulation Resistance

  • Complete a battery test on IR tester

  • Short IR tester leads to confirm working condition.

  • IR1 - A phase to B Phase

  • IR2 - A Phase to C Phase

  • IR3 - B Phase to C Phase

  • IR4 - A Phase to Neutral

  • IR5 - B Phase to Neutral

  • IR6 - C Phase to Neutral

  • IR7 - A Phase to Earth

  • IR8 - B Phase to Earth

  • IR9 - C Phase to Earth

  • IR10 - Neutral to Earth

  • IR Test Results

Comments and Photos

  • Comments

  • Photos

Post Outage Inspection

Post-Outage DB Inspection No.

  • Has DB label been updated

  • Post-Outage CB No. where DB is fed from

  • Post-Outage CB Current Rating

  • Have Submains been upgraded

  • Post-Outage Cable Size

  • Post-Outage Earth Cable size

  • Photos

Post-Outage DB De-energised

  • Earthing System

  • Note: The resistance of the main earthing conductor or any equipotential bonding conductor shall be not more than 0.5 Ohms.

  • Note: On multi board Installation tests are to be completed at the switchboard being Energised.

  • Type of Switchboard

  • EAR1 - MEN Point to Main Earth Stake

  • EAR2 - MEN Point to Earth Bar

  • EAR3 - Earth Bar to Equipotential Bond

  • EAR3 - Earth Bar to Equipotential Bond

  • EAR4 - Earth Bar to Neutral Bar (MEN Check)

  • Post-Outage Insulation Resistance

  • Complete a battery test on IR tester

  • Short IR tester leads to confirm working condition.

  • IR1 - A phase to B Phase

  • IR2 - A Phase to C Phase

  • IR3 - B Phase to C Phase

  • IR4 - A Phase to Neutral

  • IR5 - B Phase to Neutral

  • IR6 - C Phase to Neutral

  • IR7 - A Phase to Earth

  • IR8 - B Phase to Earth

  • IR9 - C Phase to Earth

  • IR10 - Neutral to Earth

  • IR Test Results

  • Post-Outage Polarity

  • Note: The polarity testing shall show that all active, neutral and protective earthing conductors in the electrical installation are correctly connected to the corresponding terminals of electrical equipment.

  • Note: Polarity tests are to be performed at the final connection location.

  • Note: Perform Polarity test by Shorting Phases & Neutral to Earth

  • Note: Disconnection the Neutral from the supply point Neutral bar

  • POL1 - A Phase to Earth

  • POL2 - B Phase to Earth

  • POL3 - C Phase to Earth

  • POL4 - Neutral to Earth

  • Note: Reconnect Neutral

  • Polarity Test Results

  • I am satisfied that the Pre-Energization test have meet the AS3000 requirements

Final Check List

  • SAFETY CHECK - This is HIGH RISK WORKS, Works to be executed carefully, follow the SWMS and safe work procedures and REMEMBER to treat All equipment as energized until proven "DEAD".

  • 5.1 Do you have a copy of the Permit to energize.

  • 5.3 Has the work areas been made safe with the correct exclusion zones put in place

  • 5.7 Confirm Both ends are made safe and ready to energise

  • I have completed all the Final Checks and happy to procedure with Energization

  • Date and Time

Neutral ID

  • Disconnect Neutral at DB Neutral Bar

  • Set up Remote earth and connect Mutli-Meter between the Neutral Conductor and remote earth. Ensure the Connections are Made Safe

  • DO NOT CONNECT THE MULTI METER AFTER ENERGIZATION

  • Complete the Switching of the Equipment

  • Confirm the Voltage between the Remote Earth and the Neutral Conductor is 0V - add photo of results

  • Reverse the Switching and lock & tag out

  • Reconnect the Neutral - Test back to earth bar to confirm MEN

  • Complete the Switching of the Equipment - Proccedure to Part 7

  • STOP TEST Isolate and Redo Part 4 Test 3: Polarity

Post-Outage DB Energised

  • Switching has been completed and equipment ready for testing

  • Post-Outage 10 Point Voltage Test: Record any out of the ordinary results. Record Neutral to Earth Voltage. Record one Phase to Neutral, Phase to Earth and Phase to Phase result for reference.

  • VT1 - Phase to Neutral

  • VT2 - Phase to Earth

  • VT3 - Phase to Phase

  • VT1 - Neutral to Earth

  • Further investigation required

  • Post-Outage Phase Rotation

  • Test Location: Energized Equipment Line side of Main Switch

  • Connection Method: Red, White, Blue leads on meter to match the Circuit Left to right (Not the cable colours)

  • Rotation test

  • Does this match Pre-Outage Rotation

  • Isolate DB and roll 2 cables then re-test

  • Test Location: Energized Equipment Line side of Main Switch

  • Connection Method: Red, White, Blue leads on meter to match the Circuit Left to right (Not the cable colours)

  • Rotation test

  • Does this match Pre-Outage Rotation

  • Isolate DB and roll 2 cables then re-test

  • Photo of the results

Switchboard Load test

  • Do you have a connected load

  • Is the Connected Load a part of JLE SOW

  • No Further Testing required

  • Follow the ITP to complete the works and commissioning of the connected Load - refer back to check list when load is available for testing.

  • Once the connected Load is commissioned simulate a High Load demand for testing

  • Tong A phase

  • Tong B phase

  • Tong C phase

  • Tong Neutral

  • Have you taken photos of the result

  • Are the Phase currents within 10% of each other

  • I am satisfied that the Switchboard load test have meet the AS3000 requirements

  • Select date

  • Confirm the ITC's have been completed for the connected load and commissioning is completed

  • Simulate a High Load demand for testing Switch board loading

  • Tong A phase

  • Tong B phase

  • Tong C phase

  • Tong Neutral

  • Have you taken photos of the result

  • Are the Phase currents within 10% of each other

  • I am satisfied that the Switchboard load test have meet the AS3000 requirements

  • Select date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.