Title Page

  • Company Name

  • Address
  • Site Address (if different to above)
  • Site Reference
  • Email Address

  • Existing Application Information

Boiler/Application

  • Make

  • Model

  • Sections

  • Electrical supply

  • Input/output rating (identify kW or BTU)

  • Chamber pressure (if known)

  • Fuel type

  • Notes

Existing Burner

  • Make

  • Model

  • Electrical Supply

  • Valve Proving

  • Minimum input/output rating

  • Maximum input/output rating

  • Modulation Signal

  • Mode

  • Fuel

  • Existing gas valve information

  • Existing gas valve size

  • Gas rate

  • 1st Nozzle size

  • 2nd Nozzle Size

  • Pump Pressure

  • Notes/Special Requirements

Installation Requirements

  • Proposed works needed

Incoming Supply

  • Oil pipe installation/modification needed

  • Days needed

  • Engineers required

  • Gas pipe installation/modification needed

  • Days needed

  • Engineers required

  • Test & Purge Certificate Required

  • Parts Required

  • Notes

Electrical/Wiring

  • Electrician Required

  • Days Needed

  • Proposed Electrical Work Required

  • Parts Required

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.