Information
-
Job Number:
-
Address:
-
QA Completed By
-
Conducted on
-
THIS QA CHECKLIST IS TO BE COMPLETED IN CONJUNCTION WITH THE INSTALLAUS INSTALLATION GUIDELINES
Whole job review
Site Requirements & Safe Work Method Statement (SWMS)
-
Have you completed the contractor induction, read and understand the SWMS?
-
If you have any workers, have they completed the contractor induction, read and understand the SWMS?
-
Do you agree you are not permitted to perform high risk work on site?
-
Do you have a copy of the relevant SWMS?
-
Are there any other hazards not covered in the SWMS such as manual handling? (Contact your site coordinator to report the site specific hazards)
Site Conditions
-
Have you read the projects site specific coordination plan, taking note of specific hazards?
-
Is there safe access to your work area?
-
Take photo of delivered kitchen
-
Have you inspected the site for hazards that could injure you or your workers?
-
Amenities available and in reasonable condition, first aid kit in vehicle and emergency information current?
-
Stairwells including temporary stairs are in place and secure, stairs have clear access and no step greater than 190mm?
Tools & Equipment
-
Are ladders commercially rated and in good condition?
-
Is your electrical equipment in good condition and tested and tagged in accordance to state legislation?
-
Are all guards fitted and in good condition?
-
Do you and your workers have the right PPE and safety equipment?
Hazardous Substances
-
Do you have your MSDS register with you?
-
Installer Name:
Pre Start Checklist
-
The pre start checklist is to be completed on arrival to the job. This section is to confirm that you have completed this task, and provide feedback where an issue was identified
-
Was the delivery sufficiently wrapped with security tape with no damage?
-
Are all pipes in correct positions?
-
Enter Comment
Qa Rooms
-
Enter room name
Carcass'
-
Are all Carcass' installed in correct locations and LEVEL?
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines?
-
Are doors and panels free of damage?
-
Does island section have stone waterfall ends?
-
Are bar panels to plan and finishing flush with carcass ends?
Benchtops
-
Are all bench tops free of damage
-
Cutouts are as per job specifications
-
Undermount cutout rebated + Tap hole drilled?
-
Installed as per guidelines
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed
-
Is all hardware in good working order?
-
Add photos of all elevations
-
Enter room name
Carcass'
-
Are all Carcass' installed in correct locations and LEVEL?
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines?
-
Are doors and panels free of damage?
-
Does island section have stone waterfall ends?
-
Are bar panels to plan and finishing flush with carcass ends?
Benchtops
-
Are all bench tops free of damage
-
Cutouts are as per job specifications
-
Undermount cutout rebated + Tap hole drilled?
-
Installed as per guidelines
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed
-
Is all hardware in good working order?
-
Add photos of all elevations
-
Enter room name
Carcass'
-
Are all Carcass' installed in correct locations and LEVEL?
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines?
-
Are doors and panels free of damage?
-
Does island section have stone waterfall ends?
-
Are bar panels to plan and finishing flush with carcass ends?
Benchtops
-
Are all bench tops free of damage
-
Cutouts are as per job specifications
-
Undermount cutout rebated + Tap hole drilled?
-
Installed as per guidelines
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed
-
Is all hardware in good working order?
-
Add photos of all elevations
-
Enter room name
Carcass'
-
Are all Carcass' installed in correct locations and LEVEL?
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines?
-
Are doors and panels free of damage?
-
Does island section have stone waterfall ends?
-
Are bar panels to plan and finishing flush with carcass ends?
Benchtops
-
Are all bench tops free of damage
-
Cutouts are as per job specifications
-
Undermount cutout rebated + Tap hole drilled?
-
Installed as per guidelines
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed
-
Is all hardware in good working order?
-
Add photos of all elevations
-
Enter room name
Carcass'
-
Are all Carcass' installed in correct locations and LEVEL?
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines?
-
Are doors and panels free of damage?
-
Does island section have stone waterfall ends?
-
Are bar panels to plan and finishing flush with carcass ends?
Benchtops
-
Are all bench tops free of damage
-
Cutouts are as per job specifications
-
Undermount cutout rebated + Tap hole drilled?
-
Installed as per guidelines
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed
-
Is all hardware in good working order?
-
Add photos of all elevations
-
Enter room name
Carcass'
-
Are all Carcass' installed in correct locations and LEVEL?
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines?
-
Are doors and panels free of damage?
-
Does island section have stone waterfall ends?
-
Are bar panels to plan and finishing flush with carcass ends?
Benchtops
-
Are all bench tops free of damage
-
Cutouts are as per job specifications
-
Undermount cutout rebated + Tap hole drilled?
-
Installed as per guidelines
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed
-
Is all hardware in good working order?
-
Add photos of all elevations
-
Enter room name
Carcass'
-
Are all Carcass' installed in correct locations and LEVEL?
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines?
-
Are doors and panels free of damage?
-
Does island section have stone waterfall ends?
-
Are bar panels to plan and finishing flush with carcass ends?
Benchtops
-
Are all bench tops free of damage
-
Cutouts are as per job specifications
-
Undermount cutout rebated + Tap hole drilled?
-
Installed as per guidelines
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed
-
Is all hardware in good working order?
-
Add photos of all elevations
-
Enter room name
Carcass'
-
Are all Carcass' installed in correct locations and LEVEL?
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines?
-
Are doors and panels free of damage?
-
Does island section have stone waterfall ends?
-
Are bar panels to plan and finishing flush with carcass ends?
Benchtops
-
Are all bench tops free of damage
-
Cutouts are as per job specifications
-
Undermount cutout rebated + Tap hole drilled?
-
Installed as per guidelines
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed
-
Is all hardware in good working order?
-
Add photos of all elevations
-
Enter room name
Carcass'
-
Are all Carcass' installed in correct locations and LEVEL?
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines?
-
Are doors and panels free of damage?
-
Does island section have stone waterfall ends?
-
Are bar panels to plan and finishing flush with carcass ends?
Benchtops
-
Are all bench tops free of damage
-
Cutouts are as per job specifications
-
Undermount cutout rebated + Tap hole drilled?
-
Installed as per guidelines
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed
-
Is all hardware in good working order?
-
Add photos of all elevations
-
Enter room name
Carcass'
-
Are all Carcass' installed in correct locations and LEVEL?
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines?
-
Are doors and panels free of damage?
-
Does island section have stone waterfall ends?
-
Are bar panels to plan and finishing flush with carcass ends?
Benchtops
-
Are all bench tops free of damage
-
Cutouts are as per job specifications
-
Undermount cutout rebated + Tap hole drilled?
-
Installed as per guidelines
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed
-
Is all hardware in good working order?
-
Add photos of all elevations
Completed
-
It is important that the information you have provided is complete and correct. Please confirm that all information required has been entered.
-
Is Job Pass Or Fail
-
Please provide any other information that would be useful.
-
Please sign before submitting this form
-
Thankyou