Information
-
Conducted on
-
MC/CC Supplier
-
Machine Controller being Checked
-
Location
Inspector/Auditor Details
-
Inspector Name
-
Inspector Sentinel Number
-
Inspector Signature
CC/MC & OTP Details
Machine/Crane Controller Details
-
Name
-
Sentinel Number
-
PTS Expiry Date
-
Sponsor name (for current job)
-
Photo of Sentinel Card
-
Signature of Machine Controller
OTP Operator Details
-
Name
-
Sentinel Number
-
PTS Expiry Date
-
Take a Picture of the sentinel card
-
Operators Capabilities certificate
-
Take a photo of the certification
-
Does the certification cover the duties to be conducted/machines and equipment to be used during the shift?
-
Possession & Worksite Limits Defined & Briefed?
-
Are the lines under possession?
-
Has the operator conducted pre-start checks
-
Operator signature
Machine Details
-
Type & Make of Machine
-
Take a picture of the machine
-
Has the machine got an engineering acceptance certificate?
-
Is one or more trailers being used?
-
Is the equipment supplied different to that planned has the MC reviewed to determine its suitability to perform the task?
-
Are any attachments being used?
-
What type of attachment is it? is it in date and calibrated? is it in good condition?
Plant Operation Supervisor (POS)
-
POS Name
-
Sentinel Number
-
Photo of Sentinel card
-
Does the POS hold a valid competence ticket for this role?
-
PTS Competence Expiry
Machine/Crane Controller Checklist OTP
-
Have arrangements have been put in place for test the traction current before work?
-
Is the MC/CC acting as the COSS?
-
Task Briefing Sheet number
-
Is task briefing valid for actual work been carried out?
-
Has the OTP operator been briefed and signed the task briefing sheet?
-
Does the MC have all the necessary OTP checklist to undertake his duties?
-
Has the MC/CC been issued with a traction current Permit?
-
Does the MC/CC have suitable Detcom/Digital Duplex equipment that has been tested and in working order?
-
Has the MC/CC briefed the operator on the requirements and factors that may influence the work within the method statement?
-
Is the site lighting adequate for the task performed?
-
Does the MC/CC have immediate access to the appropriate protection equipment, (Detonators, Flags etc...) this includes 10 dets, 2 Track Circuit Operating Clips, Red Flag and lamp with Green and Red aspects
-
Are height & side clearances adequate and appropriate arrangements in place?
-
Have the height and slew limits been set as required? (If Required)
-
Are the correct On & Off tracking facilities available to machines that require them and conditions compliant to machine limitations?
-
Has the MC/CC witnessed a functional brake test?
-
Have all pre start functional and operational checks on machinery been completed?
-
Does all the equipment provided meet the requirements of the lifting plan and are SWL's available/<br>
-
Are lifting operations involved in the task?
PPE
-
High Visibility Clothing (sponsor endorsed) and approved PPE worn correctly?
-
CC/MC wearing their armlet/badge correctly?
Notes and Actions
-
Are there any Close Calls that need to be raised?
-
Was any equipment or machinery removed from use?
-
Please list any recommendations or feedback that can be given as a result of this inspection
Recommendation/Feedback
-
Please give details
MC/CC Supplier follow up required
-
This section is to be completed after the inspection/audit by the *** representative assigned to close out this feedback/recommendation
-
Name of *** Representative
-
Details of what actions were taken in relation to this feedback/recommendation
-
Date this action was closed out