Title Page
-
Factory name
-
Audit date
-
Prepared by
-
Location
FABRIC & TRIMS WAREHOUSE
-
DOES THE FACTORY HAVE A LIST OF APPROVED SUPPLIERS.
-
DOES THE FACTORY HAVE AN EFFECTIVE SUPPLIER APPROVAL PROCESS FOR INCOMING PRODUCTS, MATERIALS, AND SERVICES COVERING QUALITY, ON-TIME DELIVERY, COST, AND COMPLIANCE?
-
DOES THE SECTION USE MCP?
-
AFTER INHOUSE ALL FABRIC STORED IN "WAITING FOR INSPECTION" AREA PRIOR TO INSPECTION.
-
WELL NOTICED & SEPARATED FABRIC QUARANTINED AREA FOR REJECTED FABRIC.
-
FABRIC STORED, BY TYPE / CUSTOMER WISE (SHOULD HANG A BIN CARD) WITH PYRAMID TYPE STACKING?
-
FABRIC STORED ON PALLETS OR RACKS- NO FABRIC ROLLS ON THE FLOOR .
-
FABRIC ROLLS COVERED BY BLACK POLY/BAGS ETC.
-
ARE FABRIC CONSIGNMENT PROCESSED FIRST IN FIRST OUT (FIFO)?
-
FABRIC SHOULD STORE 1.SHRINKAGE WISE AND 2. SHADE WISE BEFORE START CUTTING.
-
AFTER INHOUSE ALL TRIMS & ACCESSORIES SHOULD BE STORED IN "WAITING FOR INSPECTION" AREA PRIOR TO INSPECTION.
-
WELL DOCUMENTED STOCK RECORDS / BIN CARD RECORDS SHOULD BE AVAILABLE.
-
FABRIC & TRIMS SHOULD MAINTAIN BIN LOCATION SYSTEM.
-
APPROVED FABRIC SWATCHES / TRIM CARD SHOULD BE AVAILABLE WITH APPROVED BY MERCHINDIZER.
-
AS PER CHECK LIST, STYLE FILES & ALL CONTENT SHOULD BE MAINTAINED.
-
ARE THERE SOP AND FLOW CHARTS ACCESSIBLE TO WORKERS? IS THERE A SECTION-WISE FACTORY ORGANOGRAM DISPLAYED?
-
IN & OUT RECORDS MAINTAINING - CORRECT BIN CARD RECORDS.
-
IS THERE ANY VISIBLE MOLD FOUND ON THE FLOOR, PALLETS, RACKS, WALLS, ROOF, OR ANY OTHER PLACE?
2. FABRIC INSPECTION
-
10% FABRIC OF EVERY CONSIGNMENT SHOULD BE INSPECTED.
-
LIGHT SOURCE (MIN: 1000 LUX) SHOULD BE USED FOR FABRIC INSPECTION AREA.
-
ARE THERE ALL MACHINES & EQUIPMENT INCLUDING FABRIC INSPECTION MACHINES, LIGHT BOX, GSM CUTTER, MEASURING TAPE, AND SHRINKAGE TEST TEMPLET WITH SCALE CALIBRATED ROUTINELY?
-
APPROVED FABRIC STANDER FOR COLOR & HAND FEEL ON THE MC (FOLDED PANEL SHOULD ATTACHED ON NATURAL COLOR BOARD.)
-
CUT 6'' STRIP TO CHECK RUNNING SHADING.
-
SHADE CHECKING- START TO END / SELVEDGE TO SELVEDGE/START TO CENTER - BEFORE WASH & A/WASH REFERENCE.
-
INSPECTION MC SHOULD HAVE FORWARD & REVERSE FACILITY
-
BACK SIDE OF THE FAB: INSPECTION MC SHOULD HAVE LIGHTS FACILITY TO CHECK SELVEDGE SHADING
-
FABRIC DEFECT REFFERANCE SAMPLES (POINT WISE LISTED) SHOULD BE DIPLAYD AT EACH INSPECTION MACHINE FOR REFFFERANCE
-
MACHINE SPEED SHOULD BE WITHIN RECOMMENDED RANGE (CHECK FABRIC-9 YDS/MIN; SOLID/PRINT-10 YDS/MIN)
-
MUNSELL TEST MUST BE PASSED BY FABRIC INSPECTOR. (LESS THAN 16 SCORE WITHIN 6 MONTH RENEWABLE TEST)
-
INSPECTOR SHOULD MARK ON FABRIC IF FOUND DEFECT & SAME TIME FILL THE REPORT.
-
FABRIC SHOULD BE CONSIDERADE (CUSTOMER & FACTORY STANDARD)
-
IF FAIL ANY LOT, ANOTHER 20% SHOULD BE INSPECTED OF THAT CONSIGNMENT AND IF FAIL AGAIN TOTAL CONSIGNMENT SHOULD BE INSPECTED.
-
FABRIC INSPECTION WORKPLACE ARRANGEMENTS/ PROPER HOUSEKEEPING
3. TRIMS & ACCESSORIES INSPECTION
-
TRIMS STORAGE SEPARATELY BEFORE & AFTER INSPECTION. PASSED GOODS NOTICED STICKER / SEAL.
-
REJECT GOODS SEPARATE / STORE STYLE WISE / BY TYPE / CUSTOMER & NEED RACK / PALLET
-
IS THERE A PROCEDURE TO INSPECT COUNTABLE ACCESSORIES WITH 0.65 AQL & LEVEL-II / OR, 10% FOR NON-COUNTABLE ACCESSORIES INSPECTED AGAINST APPROVED TRIM CARD/BOM ? ARE TRIM CARDS TO BE FILLED PROPERLY AND APPROVED BY AUTHORIZED MERCHINDIZER?C
-
MUNSELL PASSED QI SHOULD DO TRIM INSPECTION
-
LABEL- CHECK ALL WORDING .SPECIALLY THE COUNTRY OF ORIGIN
-
HAVE DEFECT SAMPLE FOR REF. ? APPROVED TRIM CARDS AVAILABLE?. CHECK LABEL WITH APPROVAL.
-
METAL DETECTOR CHECKED & PASSED RECORDS- MAKE B/WASH & A/WASH MOCK-UP FOR REFERENCE
-
ALL BULK GARMENT TRIMS CHECK FOR COLOR FASTENER (BEFORE WASH & AFTER WASH TRIMS BOTH)
-
CHECK OLD RECORDS & GOODS OF INSPECTED @ STORED.
4.FABRIC SHRINKAGE REPORT
-
CORRECT TEMPLATE USING FOR MARK 50X50CM (B/WASH) & PARALLEL TO SELVEDGE SIDE
-
STRETCH FABRIC SHOULD RELAX (AS PER RELAXATION CHART) HOURS PRIOR TO MARK (50X50CM) (AS PER FABRIC TYPE & AS RECOMMENDED BY FABRIC SUPPLIER)
-
SHRINKAGE PANEL CUT & O/L ALL EDGES (1'' NOT TO CUT FROM SELVEDGE SIDE)
-
ENSURE ALL SHRINKAGE PANEL WASH FOR CORRECT WASH RECIPE SAME AS GOLD TAG / PLAN BULK WASH
-
AFTER WASH KEEP RELAX & FLAT MIN (AS PER RELAXATION CHART) PRIOR TO MEASURE & RECORD.
-
REPORTING FORMAT SYSTEM & CHECK OLD PANEL READINGS AGAINST OLD RECORDED MEASUREMENT.
-
DIFFERENT SHRINKAGE RANGE DIFFERENT PATTERN SELECTION- DEVIATING MORE THAN 2% FROM STANDARD. ( FOR SPANDEX DIFFERENT PATTERN NEED IF LENGTH-1.5% & WIDTH- 1% VARIATION.)
-
THE ROLL % OF SHRINKAGE SHOULD BE CHECKED - ALL DENIM / SPANDEX 100% / NON DENIM 10% & IF MORE VARIATION FOUND, THEN DO 100% ROLL CHECK.
-
NON WASH GARMENTS ALSO SHOULD CHECK 10% OF ROLLS FOR HOME LAUNDRY SHRINK % .
-
4 POINTS CALCULATION & PATTERN WISE /SHADE WISE ROLL FILTERING FACILITY.
-
SHRINKAGE TEST FOR FUSING PARTS B/F WASH & AFTER WASH SEE THE DIFFERENT- DO WHEN NEW STYLE START
5. FABRIC SHADE BLANKET & SHADE SEGREGATION RECORDS
-
FOLLOW MASTER BLANKET PROCEDURE (30 PANAEL PER BLANKET) & COLOR BLANKET SELECTION
-
COLOR BLANKET A/WASH & B/WASH PROCEDURE - MAKE CC CARDS AS GROUP SHADES
-
SHADE GROUPING & SEGREGATION PO/STY WISE-
-
OFF SHADE IDENTIFY & MAKE BLANKET FOR ROLLS REQUIRE TREATMENTS.
-
DENIM CWF LIGHT FACILITY & D65 LIGHTS FOR NON DENIM, SHOULD HAVE SHADE SEGREGATION AREA.
-
FINAL SEGREGATION- PATTERN WISE / SHADE WISE REPORT PRIOR TO ISSUING.-
-
MUNSELL TEST PASSED INSPECTORS. LESS THAN 16 POINTS PASS LEVEL- (6 MONTH RENEWABLE TEST)
6. FABRIC SKEWNESS TEST
-
SKEWNESS DO WITH SAME SHRINKAGE PANEL MEASURING AS PER AATCC TEST METHOD 179- OPTION -01 TO CHECK FABRIC SKEWNESS
7. LAB TEST REPORTS FAB & GARMENTS
-
SHOULD HAVE INCLUDE PASSED TEST REPORTS IN MASTER FILE AS WELL AS WITH GPQ TEAM.
8. APPROVED FABRIC / TRIM CARD & SAMPLE (S)
-
ORIGINAL TRIM CARD SHOULD INCLUDE ALL TRIM & ACCESSORIES WITH APPROVED BY MERCHANDISER SIGN & SEAL.
-
FTY SHOULD HAVE COPIES OF TRIM CARD FOR PARTICULAR SECTIONS, APPROVED BY QA HEAD- EX:-FOR CUTTING ALL APPROVED FAB/POCKETING/ FUSING ETC…
-
GREEN TAG / GOLD TAG / BRONZE TAG FOR SHADE / HAND FEEL / DRY PROCESS ETC..
-
IS THE DOCUMENTED PROCESS REQUIRING CLIENT APPROVAL WHEN CHANGING MATERIALS, COMPONENTS, DESIGN, OR MANUFACTURING PROCESSES MAINTAINED PROPERLY?
-
IS THERE A PATTERN AREA SEPARATE AND ORGANIZED BUYER-WISE WITH THE COVER? IS THE AREA CLEAN, NEAT, AND TIDY?
-
IS THERE A MANNEQUIN/DUMMY FITTING ROOM SEPARATE AND WELL ORGANIZED? IS THE AREA CLEAN, NEAT, AND TIDY?
-
ARE THE LIGHTING IN THE SAMPLE AREA ADEQUATE (NEEDLE POINT MINIMUM 750 LUX AND INSPECTION TABLE MINIMUM 1000 LUX) AND OVERALL HOUSEKEEPING SATISFACTORY?
-
ARE RISK-BASED ASSESSMENTS MAINTAINED ON THE PRODUCT AND MANUFACTURING SYSTEMS TO IDENTIFY, PREVENT AND CONTROL POTENTIAL ISSUES THAT IMPACT QUALITY, SAFETY AND PRODUCTION DURING THE PRE-PRODUCTION PROCESS IN THE MANUFACTURING SYSTEM?
-
IS THERE A PROCEDURE FOR SAMPLE RETENTION, DURATION & DISPOSAL? ARE DOCUMENTS MAINTAINED PROPERLY?
-
IS THERE A MANNEQUIN/DUMMY FITTING ROOM SEPARATE AND WELL ORGANIZED? IS THE AREA CLEAN, NEAT, AND TIDY?
9. STYLE MASTER FILE
-
MASTER FILE CHECK LIST SHOULD FOLLOW & ATT ALL DOCUMENTS ACCORDINGLY IN THE FILE.
10. T & A FOR P/P ACTIVITIES CHECKLIST
-
FOLLOW GIVEN CHECK LIST FORMAT & OLD RECORDS. READY FOR PP MEETING & SUBMIT TO GPQ.
-
IDENTIFICATION OF MOST DELAYED ACTIVITIES
11. LINE SIZE SET PROCEDURE (APPROVAL FOR PILOT)
-
PATTERN SELECTION & ROLL SELECTION PROCEDURE FOR SIZE SET .- USE FORMAT INTRODUCED
-
PATTERN SHRINKAGE & FABRIC ROLL SHOULD HAVE SAME SHRINKAGE
-
CHECK ALL CUT PATTERN / FINISH PATTERN & AUTHORIZE FOR CUTTING SIZE SET BY QA TEAM.
-
FOLLOW SAME CONSTRUCTION AS GREEN TAG AS WELL AS PLAN BULK PRODUCTION -( MC / SEAM ALLOWANCE /TRIMS / METHOD)
-
EACH GARMENT PUT NUMBER & DO B/WASH MEASUREMENTS. -
-
ADD AGAIN A SHRINKAGE TEST PANEL FROM SAME ROLL TO SIZE SET WASH - THIS IS TO CHECK WASH ACCURACY & SHRINKAGE ACCURACY- (COMPARE WITH OLD)
-
AFTER WASH MEASURE / ADJUSTMENT / APPROVAL FOR PILOT CUT.
12. PP MEETING, PRODUCT TEST PLAN & QA INSTRUCTION
-
APPROVED SIZE SET COMMENTS SHOULD READY & AVAILABLE BEFORE THE PP MEETING
-
PRE-PRODUCTION REPORT SHOULD READY WITH CRITICAL ISSUES IDENTIFIED B/F MEETING
-
ALL DEPARTMENTS OF FACTORY SHOULD BE REPRESENTED AT MEETING
-
ALL SEWING LINES ALLOCATION PLAN & STYLE PRODUCTION PLAN SHOULD AVAILABLE- PLAN QTY/PO/COLOR/SIZE ETC…
-
PRE- PRODUCTION T & A CHECK LIST SHOULD PREPARE BY FTY MERCHANT: PRIOR TO MEETING
-
MEETING MINUTES / ASSIGNED RESPONSIBILITY FOR CRITICAL ISSUES LIST OUT FOR FOLLOW-UP
13. FINISH PATTERNS / MARKING BOARD APPROVAL
-
USING CAD PRINT FOR FINISH PATTERN & KEEP REF: IN SEWING LINE TO CHECK ANY TIME- (CUT PATTERN # WISE FINISH PATTERN TO BE USE IF GRADED)
-
FOR DIFFERENT PATTERN # FINISH PATTERN TO BE USE IF GRADED)
-
CHECK ACCURACY AGAINST SPEC & SIGNED BY QAM -
-
PLASTIC BOARD & SAND PAPER TO BE USE.
14. PILOT RUN PROCEDURE
-
PATTERN SELECTION & ROLL SELECTION PROCEDURE FOR PILOT CUT - USE FORMAT INTRODUCED
-
PILOT RUN PATTERN SELECTION SHOULD COVER ALL SHRINKAGE RANGE & ROLL SELECTION SHOULD BE ACCORDINGLY FROM SHRINKAGE REPORT.
-
PILOT RUN SHOULD COVER ALL SIZES / ACROSS ALL COLORS
-
IF HAVE DIFFERENT PATTERN, DIFFERENT B/WASH SPEC SHOULD AVAILABLE WHILE RUNNING PILOT PRODUCTION TO DO B/WASH MEASUREMENT.
-
ALL PROCESS, CUTTING TO FINISHING SHOULD DO AS ACTUAL AS BULK PLAN
-
DO NUMBER & RECORD BEFORE WASH MEASURE FOR ALL GARMENTS
-
DO ALL FINISHING PROCESS AS BULK & DO A/WASH MEASUREMENT
-
PATTERN ADJUSTMENT AS RECORDED RESULTS PRIOR TO BULK CUT
15. LINE FEEDING REPORT
-
FORMAT & CHECK FIRST 10 PCS(S) SEWING BY OPERATOR
-
OPERATION WISE FIRST 10 PCS(S) QA TEAM FINDINGS & SOLUTIONS GIVEN
-
INVOLVEMENT OF PRO/IE STAFF TO SOLVE QUALITY ISSUES.
16. APPROVED FABRIC SWATCH CARD
-
FTY SHOULD HAVE COPIES OF APPROVED FABRIC SWATCH CARD FOR PARTICULAR SECTIONS, APPROVED BY QA HEAD/MERCHINDIZER- EX:-FOR CUTTING ALL APPROVED FAB/ POCKETING/ FUSING ETC...
17. FABRIC RELAXING
-
RELAXING METHOD ON MOVING RACKS / MOVING TRAY - NO STRETCH OR EXTRA PRESSURE WHILE RELAX & WHEN PICKUP FOR LAYING ON TABLE. -
-
KEEP RECORDS FOR RELAX TIME - (AS PER RELAXATION SOP) .
-
DOING BY MANUAL RELAX OR USING RELAXING MC WITH TREADLE
-
SHOULD FOLLOW THE FABRIC CUT/LAY PLAN SERIAL WHEN SELECTING ROLLS FOR RELAX.
18. MASTER CUT SHEET
-
FTY SHOULD HAVE A MASTER CUT PLAN PREPARED PRIOR TO CUTTING START-
-
PATTERN WISE MIN: SHADE WISE ROLL MIX-UP FOR ONE CUT #
19. MARKER & SPREADING CHECK PROCEDURE
-
CHECKING MARKER RATIO/NO OF PANELS SHOULD HAVE PER BODY /CUT MARK /GRAINLINE /PATTERN#/CHECK MARKER TYPE AGAINST ACTUAL FABRIC TO BE USED-IE ONE FACE/ FACE TO FACE / GROUP/SELVAGE MARKER / ONE GARMENT 0NE WAY /CUT MARK /NUMBERING TAILS ECT.
-
CUT PLAN & ROLL SELECTION AS PER SHRINKAGE & SHADE SEPARATION BUNDLE WISE- (TILL MAX USE)
-
MAXIMUM LAY HEIGHT(AS PER LAY HIGHT CHART OR MCP ) & NO OF FLIES SHOULD RECORD.
-
EACH FABRIC ROLE SHOULD CHECK WITH B/F WASH SWATCHES PRIOR TO LAY START.
-
LAY SHEET RECORDS - END BITS RECORDS FOR DEFECT PANEL RECUT PROCEDURE
-
SHOULD STORE END BITS CUTTING, BUYER, STYLE, COLOR WISE AS COULD EASY ROLL SELECTION
20. CUT ACCURACY INSPECTION
-
FORMAT SHOULD USE & CHECK OLD RECORDS + CHECK RUNNING CUT .
-
ALL BODY PARTS SHOULD CHECK & RECORD THE RESULT.
-
THE APPROVED PATTERN USING FOR CHECKING (EDGE SEALED) & PATTERN # WISE HARD PATTERN SHOULD USE TO CHECK THE PANELS (TOLL-1/8")
-
SHOULD IDENTIFY THE QI, WHO CHECK & PASSED THE CUT TO SEWING LINES, IF ANY DEFECT FOUND IN SEWING.
21. NUMBERING & BUNDLING PROCEDURE
-
NUMBERING PLACEMENT AS PRODUCTION/ QA TEAM DEMAND.- PLACEMENT SKETCH MAKE DISTRIBUTE @ PP STAGE
-
ALL DETAILS OF BUNDLE TAG.- & ONE BUNDLE SHOULD ONE SHADE.-
-
FAB QUALITY VS INK / STICKER QUALITY. - SHOULD HAVE PRE TESTED WASH PANEL FOR NUMBERING METHOD & PLACEMENT
-
FUSING PART NUMBERING PLACEMENT & THE EFFECT BEFORE / AFTER FUSING / SEWING & WASH SHOULD HAVE PRE TESTED @ PP STAGE.
-
LINE WISE BUNDLE GUIDE CHART SHOULD DISTRIBUTE. -
22. FUSING & HEAT SEAL INSPECTION - TEST
-
TEMPERATURE CHECK REPORT & FUSING BOND STRENGTH TEST REPORT - THERMO PAPER MUST BE USE
-
ALL CUSTOMER GUIDE LINE SHOULD FOLLOW - MC CLEAN METHOD & BELT PRESSURE CHECK METHOD / SINGLE PART FUSING / THERMO CHECK R/M/L / PCC TEST RPT / MC SETTINGS STYLE WISE. MC ADJUSTMENT PANELBORD AREA SHOULD COVER.
-
IS THE PEEL BOND STRENGTH WITH THERMAL PAPER STRIPS TESTED BEFORE PRODUCTION OF EACH STYLE?
-
ARE FUSING MACHINE OPERATORS TRAINED AND COMPETENT BOTH INTERNAL AND EXTERNALLY? ARE SESSIONS DOCUMENTED WITH PICTORIAL EVIDENCE?
-
IS THE THIRD-PARTY CALIBRATION DONE PERIODICALLY WITH CERTIFICATION FOR FUSING MACHINES?
-
ARE THERE GOOD CONDITIONED, FUNCTIONAL, AND OPERATING FUSING MACHINES? ARE THERE REPORTS READILY AVAILABLE TO SHOW THE ROUTINE MAINTENANCE OF THE FUSING MACHINE?
-
IS THERE A MAINTAINED STYLE-WISE DATA SHEET FOR ALL BUYERS?
-
DOES THE MACHINE SET FOLLOWING SUPPLIER SPECIFICATION WITH GLUE LINE TEMPERATURE, PRESSURE, AND FUSING TIME, AND PEEL BOND STRENGTH REQUIREMENTS?
-
ARE THERE REPORTS MAINTAINED PROPERLY TO SHOW FUSING CONDITION CHECKING (MINIMUM 2 TIMES A DAY) INCLUDING TEMPERATURE AND BOND STRENGTH TESTING?
-
DOES THE PEEL BOND STRENGTH OF FUSED PARTS PERFORM USING AN APPROVED SPRING PULLER OR PULL TESTER?
-
DO THE MACHINE BELTS CLEAN REGULARLY WITH AN APPROVED CLEANING AGENT AS SPRAY, POWDER, AND DUSTER?
-
ARE THERE REPORTS MAINTAINED PROPERLY TO SHOW HEAT TRANSFER MACHINES CONDITION CHECKING (MINIMUM 2 TIMES A DAY) INCLUDING TEMPERATURE AND INTERNAL WASH CHECKED RECORD?
-
ARE THERE GOOD CONDITIONED, FUNCTIONAL, AND OPERATING HEAT TRANSFER MACHINES? ARE THERE REPORTS READILY AVAILABLE TO SHOW THE ROUTINE MAINTENANCE OF THE FUSING MACHINE?
-
ARE 100% HEAT TRANSFER PANELS INSPECTED AGAINST THE APPROVED STANDARD? INCLUDES DEFECT SEPARATION AND DOCUMENTATION?
-
IS THERE A PROCEDURE TO RE-CHECK THE FUSING MACHINE DUE TO ELECTRICITY WITH THERMOS PAPER?
23. 100% CUT PANEL INSPECTION
-
DAILY CHECK QTY RECORDS IN FORMAT / REGISTER - INDIVIDUAL & DAILY REPLACEMENT RECORDS & % SHOULD AVAILABLE -
24. CUTTING SAFETY REQUIREMENT
-
USING METAL GLOVES / MASK / EYE GLASS & CUTTING SECTION HOUSEKEEPING
-
ARE THE MOBILE EQUIPMENT KEEP AT PROPER PLACE?
-
ARE THE HAND TOOLS TIED?
25.EMB & PRINTING RELATED SOP
-
DO 100% INSPECTION B/F INPUT- COUNTER STANDARD SHOULD AVAILABLE.? - REPORT PO/STYLE WISE & RE-CUT RECORDS MAINTAIN CUT # WISE IN / OUT RECORDS.
-
NEEDLE CONTROL PROCEDURE SHOULD FOLLOW PROPERLY IN EMB SECTION (PASS ALL EMB ITEM IN NEEDLE DETECTOR MC)
26. APPROVED SAMPLE -STYLE FILE - & TRIM CARD
-
ALL COUNTER SAMPLE SHOULD CHECK & APPROVE AS PER GREEN TAG - HAVING CORRECT TAG WITH SIGNED BY GPQ HEAD.
-
APPROVED COPY OF TRIM CARD SHOULD AVAILABLE IN SEWING LINE. SIGNED BY FTY QA HEAD / FTY MERCHANDISER.
27. CONSTRUCTION & SPECIAL REQUIREMENT
-
ALL CONSTRUCTION AS APPROVED SAMPLE- CHECK AND RECORD INITIAL LINE OUTPUT BY GPQ TEAM
-
ALL BT / BA / BH / SNAP / REVERT MACHINES SHOULD ATTACH SUITABLE LASER LIGHTS TO DO PROPER GUIDE
-
USING MARKED FABRIC PANELS TO CHECK MACHINE TOP / BTM FEEDING & THREAD TENSION.
-
TRIMMING & FULL BODY CHECKING PROCEDURE AS PER PRE DETERMINED SEQUENCE
-
ALL MEASUREMENTS TAPES & ALL MEASURE EQUIPMENTS SHOULD DO CALIBRATION ON QUARTLY/SEMI YEARLY/YEARLY BASIS. ATT DATES LABEL DETAILS.
-
TENSION POST TAKE-UP SPRING SHOULD IN PROPER PLACE & WORKING EFFECTIVELY
-
DAILY ALL MACHINE CHECK WITH SPI MOCKUP & HANG INDIVIDUALLY
28. MOCK UP PREPARATION
-
ALL OPERATION SHOULD HAVE DETAILED MOCKUP- INCLUDED / HANG DATE/ SPI/ NEEDLE/ THREADS/ FOOT & GUIDE/ FORMAT & SIGNED BY QA & RELATED PERSON.
-
WORKERS UNDERSTANDING ON MOCKUP & CHECK ACTUAL FOLLOW UP
29. END LINE QUALITY INSPECTION REPORT
-
COUNTER STANDARDS FOR ALL QC TABLE & INSIDE OUT SIDE BOTH SHOULD BE ON CHECK TABLE / APPROVED TAG CARD HANGING.
-
COUNTER STANDARDS FNT & BK ON CHECK TABLE / APPROVED TAG CARD HANGING
-
DEFECT FINDINGS RECORD - OPERATION THEN DEFECT TYPE SHOULD DEFINE - CHECK LINE MANAGERS ACTION AGAINST FINDINGS.
-
DAILY CHECK QTY / DEFECT FOUND QTY & % CALCULATION
-
BUNDLE SERIAL & BUNDLE QTY MAINTAIN PROPERLY.
-
IS THERE ESTABLISHED TRAFFIC LIGHT SYSTEM
-
FOLLOW SAME CHECK METHOD AS PRE DETERMINED SERIAL OF CHECKING METHOD-
30. BUTTON PULL TEST RECORDS B/F WASH
-
EACH MC EVERY 2 HOURS SHOULD CHECK & RECORDS FOR PRODUCTION.
-
ALL RECORDS SHOULD HAVE A ATTACHED TESTED MOCKUP HANGING IN THE MACHINE & NO: OF LAYERS IN MOCKUP SHOULD BE SAME AS ACTUAL GMTS - ( B/WASH - A/WASH SHOULD HAVE SEPARATE MOCK UP)
-
DIFFERENT SEAM FOUNDATION / THICKNESS FTY SHOULD USE DIFFERENT MACHINE ADJUSTMENT.
-
1MM GAP FOR THE BUTTON WITHOUT WRAPPING & 2MM GAP FOR WRAPPING BTN
-
ARE THE OPERATOR USE PPE?
31. MEASURING
-
DIFFERENT PATTERN WISE B/F WASH SPECS SHOULD AVAILABLE IN SEWING LINE. -
-
DAILY END LINE 10 PCS PER SIZE SHOULD DO FULL BODY MEASUREMENT & RECORDS. BEFORE WASH & AFTER WASH.
32. APPROVED PACK SAMPLE, STYLE FILE, & TRIM CARD
-
ALL COUNTER SAMPLE SHOULD CHECK & APPROVED FOR FOLDING / TAG PLACEMENT & POLY METHOD - HAVING CORRECT TAG WITH SIGNED BY.. - STYLE FILE FOR FINISHING SECTION & APPROVED TRIM CARD SHOULD AVAILABLE FOR FINISHING SECTION.
33. FINISHING INPUT-SHADE/HAND FEEL/DRY PROCESS CHECK POINT
-
LIGHT BOX/TABLE - REQ LIGHT FACILITY- D65 N.DENIM & CWF FOR DENIM
-
MUNSELL PASS QC AVAILABLE & QC SHOULD ROTATING FROM CHECKING JOB TO OTHER AFTER EVERY 2 HOUR
-
COUNTER SAMPLE PROCEDURE FOLLOW 100% & SHADE / HAND FEEL/ DP COUNTER AVAILABLE ON TABLE
-
MAINTAIN DAILY RECORD OF CHECKED / REJECT FOR SHADE/HAND FEEL & REWASHED QTY ETC…. ALSO DEFECT % CALCULATE
34. GARMENTS TRIMMING & CHECKING PROCEDURE
-
SHOULD HAVE PRE PLAN SEQUENCE PICTURE AVAILABLE IN FRONT OF HELPER TO DO TRIMMING & CHECKING SAME WAY BY ALL WORKERS
35. PRESSING/ IRONING PROCEDURE
-
ARE THERE ALL VACUUM FUNCTIONAL AND ALL PRESSING EQUIPMENT RUST-FREE?
-
ALL IRON SHOULD HANG MIN 3-4 INCHES ABOVE FROM IRON TABLE.
-
NEED TO DO PRESSING OR STEAM PRESS AS REQUIRED & TRAINED BY SECTION HEAD.
-
COUNTER SAMPLE - EACH IRONMAN SHOULD MAKE A SAMPLE DAILY MORNING & HANG IN FRONT OF TABLE AFTER CHECK BY SECTION SUPERVISOR.
36. HOURLY GARMENTS CHECK (FINISHING)
-
PREVIOUS STYLE ACCESSORIES S/B REMOVE FROM PRODUCTION AREA
-
CALIBRATED MEASUREMENT TAPE/SCALE S/B USE?
-
COUNTER STANDARDS FNT & BK SHOULD HAVE ON CHECK TABLE / APPROVED TAG CARD HANGING
-
DEFECT FINDINGS RECORD - OPERATION THEN DEFECT TYPE SHOULD DEFINE - CHECK LINE MANAGERS ACTION AGAINST THE HISTORY OF FINDINGS.
-
DAILY CHECK QTY / DEFECT FOUND QTY & % CALCULATION - MONTHLY LINE/FTY SUMMARY NEED PREPARE
-
FOLLOW SAME CHECK METHOD AS PRE DETERMINED SERIAL OF OPERATION
37. CRITICAL MEASUREMENT FOR 100% GARMENTS WITH OOT RECORDS.
-
ALL CRITICAL POINTS SHOULD MEASURE & RECORD.
-
CHECK WHETHER USE CORRECT METHOD OF MEASURING - TAPE & CORRECT TEMPLATE.
-
OOT GARMENTS RECTIFIED METHOD & CHECK FOR TOTALLY DEFECT GARMENTS AVAILABLE.
-
CHECK THE TOTAL % OF OOT GARMENTS DAILY.
38. NEEDLE DETECTION PROCEDURE
-
CHECK MC WITH POINT 1.2MM CARD (INSIDE THE GARMENT) EVERY HOURS FOR 9 POINTS ON THE BELT & CHECK & ENSURE ALL GARMENTS THROUGH THE MC B4 PACK
-
ARE METAL PASS GARMENTS KEPT IN ONE HOUR QUARANTINE ZONE?
-
SHOULD HAVE STYLE WISE / PO WISE RECORD FOR PASSED QTY
39. FINAL SHADE SEGREGATION & ASSORTMENT
-
SUITABLE LIGHT BOX/TABLE - LIGHT FACILITY- D65
-
MUNSELL PASS QC AVAILABLE & QC SHOULD ROTATING FROM CHECKING JOB TO OTHER AFTER EVERY TWO HOUR
-
COUNTER STANDARD PROCEDURE FOLLOW 100% & SHADE / HAND FEEL COUNTER AVAILABLE ON TABLE
-
SHOULD USE A SEAL / CHOP AFTER CHECK & PUT THE QTY IN TO THE BOX.
-
TRACEABILITY & IDENTIFICATION
40. PACKED CARTONS DAILY AUDIT
-
HOURLY 10% PACKED CARTONS MUST BE CHECKED FOR PACKING DEFECTS.
-
NEED TO DO DAY FINAL(BOX AUDIT) & KEEP RECORD BY GPQ TEAM & MAINTAIN MONTHLY SUMMARY . FTY GPQ TEAM SHOULD DO PRE FINAL PRIOR TO OFFER BUYER PRE FINAL.
-
ARE THE PACKING MATERIAL STORED AGAINST THE WALL? PLASTIC PALLETS USED
41. FINISHED GOODS WARE HOUSE
-
ARE THERE ALL RACK & PLASTIC PALLETS CLEAN FROM DUST/DIRTY? ARE CARTONS ORGANIZED BY STYLE, ORDER, SIZE, AND CUSTOMER?
-
ARE RH READERS BEING USED TO REGULATE THE RELATIVE HUMIDITY (RH < 55%)? ARE THE AREA WELL LIT AND ACCESS LIMIT TO AUTHORIZED PERSONS ONLY?
-
IS THE LOCATION BOARD MARKED AS PER INCOMING OF THE FINISHED CARTON?
-
ARE CARTONS IN GOOD CONDITION AND MARKED?
-
IS THE ORDER RECONCILIATION CONDUCTED BEFORE SHIPMENT?
42. SPOT REMOVING AREA
-
THERE ARE WRITTEN OPERATING PROCEDURES OR WORK INSTRUCTIONS IN LOCAL LANGUAGE.
-
MEASURES ARE IN PLACE TO VERIFY AND MONITOR THE EFFECTIVENESS OF CLEANING METHODS.
-
A CHEMICAL CONTROL PROGRAM MANAGES THE USE, STORAGE, AND HANDLING OF CHEMICALS AT THE MANUFACTURING FACILITY.
-
MSDS AVAILABLE FROM APPROVAD SUPPLIER ?
-
IS THERE A UPDATE BANDED CHEMICAL LIST? DOES RELATED PERSON CAN UNDERSTND?
-
ARE THE OPERATOR USE PPE?
-
ARE THE OPERATOR WELL TRAINED?
-
IS THE SPOT REMOVING PROCEDURE MAINTAINED PROPERLY BY A PARTICULAR RESPONSIBLE WITH HIS/HER OFFICE ORDER?
43. NEEDLE & KNIFE CONTROL MANAGEMENT
-
IS THE NEEDLE CONTROL PROCEDURE MAINTAINED PROPERLY BY A PARTICULAR RESPONSIBLE NEEDLE SUPPLIER WITH HIS/HER SUBSTITUTION & OFFICE ORDER?
-
NEEDLE STOCK BALANCE MATCH WITH LOG.
-
DAILY NEEDLE ISSUING PROCEDURE (MISSING ,BROKEN, REPLACE & NEW ISSUE)
-
NEEDLE RISK ANALYSIS REPORT
-
NEEDLE ABOLISHMENT PROCEDURE (RETENTION PERIOD, DISPOSAL POLICY)
-
CUTTING/SEWING MACHINE KNIFE STOCK BALANCE CHECK?
-
REJECTED CUTTING/SEWING MACHINE KNIFE KEEPING PROCEDURE & LOG CHECK?
-
BROKEN NEEDLE PROCESS KNOW EVERY OPERATOR/PRODUCTION STAFF
44. SHARP TOOLS MANAGEMENT
-
IS THE SHARP TOOLS PROCEDURE MAINTAINED PROPERLY BY A PARTICULAR RESPONSIBLE SHARP TOOLS SUPPLIER WITH HIS/HER OFFICE ORDER?
-
SHARP-TOOLS STOCK BALANCE MATCH WITH LOG.
-
DAILY SHARP-TOOLS PROCEDURE (DAILY ISSUE& RECEIVED, MISSING ,BROKEN, REPLACE & NEW ISSUE)
-
IF OPERATOR GOSE TO ANOTHER LINE THEN HOW TO MAINTAIN SHARP TOOLS?
-
SHARP TOOLS ABOLISHMENT PROCEDURE (RETENTION PERIOD, DISPOSAL POLICY)
-
SHARP TOOLS ARE KEPT TIDY(6" ON THE FLOOR) WITH USER NAME & ID NUMBER?
-
REJECTED SHARP TOOLS KEEPING PROCEDURE & LOG CHECK?
-
IS THE BROKEN HARD PLASTICK OR BROKEN WOOD PROCEDURE MAINTAINED PROPERLY?
45. LABEL CONTROL MANAGEMT
-
DOES THE LABEL CONTROL PROCEDURE FOLLOW ACCURATELY TO MANAGE THEM ON TO THE SEWING FLOOR BY THE RESPONSIBLE LABEL SUPPLIER WITH HIS/HER OFFICE ORDER??
-
ARE THERE MAINTAINED SIZE-WISE SEPARATE RACK/BOX FOR HANGTAGS, LABELS, UPC TICKETS, POLYBAG STICKERS, ETC.. FOR EVERY BUYER?
-
PHISICAL CHECK LABEL STOCK & LABEL STOCK LOG.
-
HOW TO MAINTAIN STYLE COSIGNING EXTRA BRAND LABEL/ ITEM & OTHERS ITEM?
-
CKECK BRAND ITEM KEEPING LOCKER CONDITION?
46. MAINTENANCE
-
IS THERE A RATIO OF IN-LINE QC AND SUPERVISOR TO SEWING LINE WORKERS 1 IS TO 45 OR LESS?
-
IS THERE A RATIO OF QUALIFIED MECHANICS TO SEWING WORKERS 1 IS TO 90 SEWING MACHINES?
-
DOES THE FACTORY HAVE ALL THE REQUIRED MACHINES & EQUIPMENT FOR THE PRODUCTION OF THE LINE?
-
ARE THERE ALL QUALITY ATTACHMENTS (I.E.. PRESSER FEET, FOLDERS, GUIDES, AND TEMPLATES) AND OTHER WORKING AIDS INSTALLED ORGANIZED AND TIDY?
-
ALL OVER LOCK MC SHOULD HAVE PROPER EDGE GUIDE FIX WITH 2 SCREW
-
ARE ALL MACHINES AND EQUIPMENT IS IN GOOD CONDITIONS BY SETTING, CALIBRATION, AND MAINTENANCE WITH ELECTRIC WIRING?
-
ARE THE LIGHTING IN THE SEWING AREA ADEQUATE (THE NEEDLE POINT MINIMUM 750 LUX AND INSPECTION TABLE MINIMUM 1000 LUX) AND OVERALL HOUSEKEEPING SATISFACTORY?
-
IS THE MACHINE MASTER LIST OF CALIBRATION UP-DATE FROM TIME TO TIME?
-
IS THE PREVENTIVE MACHINE MAINTENANCE SCHEDULE MAINTAINED PROPERLY?
-
DOES THE RELEVANT MECHANIC MAINTAIN THE SERVICE CARD PROPERLY AFTER MACHINE SERVICING?
-
IS THE MACHINE LUBRICANT (WHERE USED) CHECKED REGULARLY BY THE MECHANIC AND RECORDED ON THE SERVICE CARD?
-
ARE PERIODICAL MACHINE BREAKDOWNS MAINTAINED WITH THE PROPER RECORD?
-
ARE THERE MACHINE PARTS SUCH AS GUIDE, FOLDER & SPARE PARTS RUST AND DUST FREE?
47. HOUSE KEEPING
-
SWAB (DUST/DIRTY MARK/GLUE MARK) CLEAN IN FULL FACTORY.
-
WASTE CONTAINER/BOX/BIN CLEANING SCHEDULE AND RECORDS.
-
OVERALL HOUSEKEEPING IS GOOD?
48. TRAINING & AWARENESS
-
IS THERE MAINTAINED ORGANIZED REGULAR TRAINING FOR RELEVANT PERSONS AND HAS A RECORD OF THE TRAINING SESSION?
-
IS THE TRAINING CALENDAR MAINTAINED PROPERLY AS PER THE JOB ROLE?
-
IS THERE CONDUCT REGULAR MEETINGS BASED ON KPI?
-
DOES THE SCHEDULED MANAGEMENT REVIEW MEETING CONDUCT IN TIME AND DOCUMENTED?
-
ARE DOCUMENTS OF TRAINING AND MEETING MAINTAINED PROPERLY WITH EVIDENCE?