Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Previous Audit Report
-
Has the previous audit report been closed out?
COVID 19 Secure
-
Is there a COVID 19 risk assessment for the site?
-
Are the staff able to maintain social distancing rules?
-
Are there sufficient washing facilities or handwash for the staff?
Access and Egress
-
Is there safe access and egress to all working areas of the site?
Asbestos Management
-
Has an asbestos survey been carried out in accordance with HSG264?
-
Has a detailed risk assessment and method statement been carried out?
Cartridge Operated Tools
-
Are the manufactures instructions being followed?
-
Has the operator/s been properly trained?
-
Is the operator/s wearing eye protection?
-
Is the gun cleaned regularly?
-
Are the gun cartridges keep secure when not in use?
-
Is there a system in pleace for accounting for cartridges?
Consultation
-
Has a system been established for employees to comment and be consulted on health, safety and welfare issues.
-
Ensure appropriate Tool Box Talks are given to all employees and that the Tool Box Talks are appropriate and relevant to the work being undertaken.
-
Ensure that an attendance register has been maintained and signed by all persons present at each Tool Box Talk.
Control of Substances Hazardous to Health (COSHH)
-
Have COSSH Assessments been carried out for all potentially hazardous materials and substances being used on the site.
-
Are material safety data sheets available to assist with COSHH assessments.
-
Ensure all dangerous/hazardous materials/Substances are clearly marked/identified and stored in a secure location appropriate to the substance.
-
Have the appropriate PPE been provided and is the PPE being used.
Electrical Equipment
-
Check that low voltage tools and equipment are being used wherever possible.
-
Check all connections are properly made and suitable plugs are used.
-
Check that tools and equipment are visually checked and regularly inspected/tested by a competent person. (PAT)
-
Ensure that cables and trailing leads are not trip hazards.
-
Ensure that suitable and sufficient task lighting is provided to enable operatives to safely carry out their work.
Fire Risks and Management
-
Ensure all staff know what these procedures are
-
Check that there is an adequate means of raising the alarm
-
Ensure that there are adequate escape routes and that these are kept clear of obstructions.
-
Ensure that the quantity of flammable materials, liquids and gases are kept to a minimum and are adequately stored.
-
Check that all fire extinguishers have had an annual inspection.
First Aid
-
An appropriate number of trained and qualified first aiders should be available on the site.
-
Are suitably qualified persons available to ensure adequate first aid provision is provided.
-
Ensure the first aid kit contains only first aid materials.
Housekeeping
-
Ensure all debris and waste is removed from the work area upon completion of the work
-
Ensure Debris is not be allowed to collect around the site.
-
Ensure materials are stored in an appropriate manner so as not to cause damage to or a weakening of the material.
Low Level Access Including Steps and Podiums
-
Are steps class 1 as defined in EN131?
-
Is there a risk assessment in place for the use of steps?
Manual Handling
-
Ensure manual handling is listed as a hazard on the risk assessment and controls in place to reduce the risk
-
Ensure all staff have received manual training.
Occupational Health, HAV'S, Noise and Associated Health Risks
-
Check that workers have had information and training so that they know what the risks are from HAV.
-
Ensure reduced-vibration tools are used wherever possible.
-
Check vibration tools are properly maintained.
-
Check whether health surveillance for people exposed to high levels of hand-arm vibration over long periods is in place.
Personal Protective Equipment (PPE)
-
Ensure that PPE is issued on an individual basis.
-
Ensure that it is suitable for the type of work being undertaken.
-
Check that it is kept in good condition.
-
Eye Protection
-
Ensure that it is of a suitable grade for the type of work being undertaken. I.e. light protection or full goggle etc.
-
Check that it is kept in good condition.
-
Foot Protection
-
Ensure that footwear is manufactured to CE standards.
-
Ensure that footwear is fitted with steel toecaps and steel sole plates.
-
Hand Protection - Ensure that where damaged to the hands may occur through activities such as handling, or when using hazardous substances/chemicals that all persons affected wear the appropriate class of safety glove.
-
Are all gloves free from damage?
-
Ensure gloves are the correct size.
-
Ensure gloves are correct for their application and the activity being undertaken.
-
Check that hands are washed frequently after spells of work.
-
Respiratory Protection (RPE) - Avoid the use of nuisance dust masks.
-
Ensure that the correct type of respiratory equipment is used for the works being undertaken.
-
Ensure that persons are trained for the use of the RPE and where applicable have a face fit test to ensure the effectiveness of the RPE.
-
Ensure that all equipment is cleaned and checked after use.
Plant & Equipment
-
Ensure that tools and equipments are stored correctly to avoid damage to the equipment and persons.
-
Dry, covered and secure storage areas should be provided for all tools and equipment.
-
Hand tools
-
Ensure that the right tools and equipment are being used for the right job.
-
Were all hand tools found to be in good condition with no defects?
-
Ensure that all operators are trained and competent.
Risk Assessments and Method Statements
-
Ensure all Method Statements have been prepared by a competent person and have been checked, reviewed and signed.
-
Are method statements adequate and suitable for the task?
-
Does the method statement offer the necessary controls and required level of protection?
-
Ensure all contractors are working in accordance with the method statement.
Summary
Corrective Actions
Sign off
-
Person conducting this Audit.
-
Audit concluded at:
Closure
-
All actions on this report have been completed on: