Title Page

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Has all equipment to be isolated identified?

  • Is Risk Assessment conducted and signed off?

  • Has a General Permit to work been issued?

  • Are adequate personal padlocks (with single key) , lock box , calipers and tags been provided?

  • Has all personnel doing the actual isolation been trained in the site isolation procedure?

  • Has the isolation officer de-energized and tested the plant / equipment for dead before any work commence?

  • Was a leak test conducted to ensure no leak from the isolation of the sources of energy?

  • Do all employees involved have own padlocks with single key?

  • Is the area or equipment to carry out the work safe to do so?

Isolating HMEs?

  • Was the isolation and lockout steps followed as per procedure requirements?

  • Is the ignition key removed , master key turned to off position and an isolation tag placed on controls and at isolation point (battery) ?

  • Has all personnel doing the actual isolation been trained in the site isolation procedures?

  • Is the work being conducted in a place in which it is safe to undertake maintenance activities?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.