Title Page

  • Audit Title

  • Site conducted

  • Conducted on

  • Auditor Name

  • Contractor

  • Contractor Representative

  • All findings from previous audit are closed out

  • Actions Required

  • Agreed Closure Date

1. Safety Documentation (Policy, leadership & Engagement)

  • 1 Company Safety Policy & Environmental Policy

  • 2 Company Environmental, Health and Safety Manual

  • 3 Construction Phase H&S Plan & Environmental Plan

  • 4 Certificate of Employers’ Liability Insurance

  • 5 Certified EHS Management System

  • 6 Contractor Pre Qualification completed and up to date

2 First Aid and Emergency Preparedness

  • 1 First Aid and Emergency Preparedness Plan

  • 2 First Aiders and certification

  • 3 First Aid, Fire Warden, Fire Safety Notice

  • 4 First Aid Kits in place and stocked

  • 5 Fire Safety Plan and Project Fire and First Aid Risk Assessment

3 EHS Files (Plans, Procedures, hazard Identification, Opportunities)

  • 1 Method Statements/Risk Assessments on file

  • 2 SDS Sheets on file

  • 3 Chemical Substance Risk Assessment Records

  • 4 Safe Plan of Actions

  • 5 Safety Behavioural Observation Programme

  • 6 Safety Meetings

  • 7 Site Safety Reps Meetings

4 Equipment Inspection and Statutory Compliance standards & Records

  • 1 Plant & Equipment Register

  • 2 Ladder Inspection Records & tags

  • 3 Mobile Tower Inspection Records & tags

  • 4 Scaffold/ Formwork/ Work Platforms Inspection Records & tags

  • 5 Electrical Equipment Inspection Records

  • 6 Excavations and Earthworks Inspection records (AF3s)

  • 7 Harness & Lanyard Inspection Records

  • 8 Plant & Machinery Inspection Records

  • 9 Lifting Equipment Inspections, i.e. Slings, chain blocks, ropes, beam clamps etc

  • 10 Scaffold Handover Certificates

  • 11 Design Calculations and Temporary Design Certs

5 Meetings and Communication

  • 1 Tool Box Talk Records

  • 2 Subcontractor Tool Box Talk Records

6 Training and Awareness & Safety Programme

  • 1 Personnel Training Records & Matrix

  • 2 Matrix for Site Specific Training

  • 3 Project Orientation Training

  • 4 Manual Handling

  • 5 Behavioural Safety

  • 6 Trade specific training requirements

7 Sub-Contractors Safety Management

  • 1 Competency / Pre-qualification Assessments

  • 2 List of subcontractors up to date and supplied to JE

  • 3 Kickoff meeting held and MoM's

  • 4 Subcontractors’ EHS Manuals

  • 5 Subcontractors’ RAMS

  • 6 SDS Sheets on file

  • 7 Subcontractors’ Chemical Substance Risk Assessments

8 Welfare (Logistics and Facilities)

  • 1 Canteen

  • 2 Drying Room

  • 3 Drinking water

  • 4 Housekeeping / Cleanliness

  • 5 Fire Protection

  • 6 Emergency Access/Egress signage

9 Auditing Monitoring and Compliance

  • 1 Internal Audits Records and evidence of closure

  • 2 Sub-contractor Audits and evidence of closure

10 Incident Management

  • Are near misses, incidents and accidents managed, investigated and closed out adequately in a timely manner?

Project performance and Metrics

  • Are these being tracked, monitored, and analysed for trending metrics?

Other

  • Any other issues on the project/ to note with the contractor?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.