Title Page

  • Site conducted

  • Client

  • Site

  • SCOPE OF WORK

  • Contract Manager

  • Site Manager

  • Conducted on

  • Prepared by

EHS – SITE EHS INSPECTION

INTRODUCTION

  • All sites are audited against the group benchmark of 85%
    Above 90% - Site is performing above the required standard
    85.1% - 90% - Site is meeting Group Benchmark
    81% - 85% - Site Requires Improvement
    80% & below Site is non-compliant to group standards

  • undefined

  • Have all items from previous inspections been closed out?

  • Are the Friday Packs (including weekly Supervisor Inspections) being submitted weekly and do they include all required documentation?

1. PUBLIC SAFETY & SIGNS

  • Complete Section

  • 1. Hoarding erected / maintained?

  • 2. Signage adequate for public / general safety?

  • 3. Signs to welfare (offices, stores, first aid etc.)?

2. COVID -19 CONTROLS & PAPERWORK

  • Complete Section

  • 1. Are staff adhering to the documented site COVID 19 controls?

  • 2. Has the JB Structures COVID 19 addendum and risk assessment been populated and briefed to staff?

3. WORKPLACE ACCESS & WALKWAYS

  • Complete Section

  • 1. Is there sufficient pedestrian segregation from plant and equipment?

  • 2. Were adequate access and walkways provided?

  • 3. Adequate lighting provided?

4. HOUSEKEEPING – TIDINESS & STORAGE

  • Complete Section

  • 1. Site areas tidy?

  • 2. Safe access to materials? Are materials stacked /stored safely

5. PERSONAL PROTECTIVE EQUIPMENT

  • Complete Section

  • 1. PPE correct for the task at hand e.g. hard hat, hi-vis vest, gloves, boots, eye protection, hearing protection as identifies in the RAMS /Risk Assessment?

6. ELECTRICAL SAFETY

  • Complete Section

  • 1. 110 volt system in use?

  • 2. Extension leads in good condition?

  • 3. Generators in good condition and placed properly?

  • 4. Cables laid / suspended in a safe manner to remove any trip hazard?

  • 5. PAT testing in date?

7. FIRE SAFETY

  • Complete Section

  • 1. Staff assembly point provided?

  • 2. Adequate number of fire extinguishers available? (Fire points adequate for site and levels, seperate JBS extinguishers for HOT WORKS only?)

8. TEMPORARY WORKS

  • Complete Section

  • 1. Is there an appointed and qualified Temporary Works Co-ordinator & Temporary Works Supervisor?

  • 2. Is the Temporary Works Register completed and up to date?

  • 3. Are the Weekly Temporary Works Inspection sheets (JBS-H&S-FRM-0139) being completed by TWC/TWS and submitted with Friday Packs each week?

9. POWER TOOLS (PUWER)

  • Complete Section

  • 1. Correct power tool for the job?

  • 2. Power tools in good condition?

  • 3. Have operatives using abrasive wheels (petrol saws, grinders) received Abrasive Wheels training?

  • 4. Are staff aware of the HAVs related to the equipment they are using? Is HAVs being recorded?

10. WORK AT HEIGHT

  • Complete Section

  • 1. Crash decks in place?

  • 3. Exclusion Zone established and sufficient signage in place?

  • 4. Are fans required?

  • 5. Fall arrest, emergency rescue equipment & procedure in place?

  • 7. Are the correct anchor points being used for any working at height involving harnesses & inertia reels? (no dywidag tie bars and nuts, no strops around GTs, no inertial reels hooked on props etc.)

  • 8. Canti-Deck installed by a trained, competent person?

11. MEWPS

  • Complete Section

  • 1. Trained operator?

  • 3. Current certificates available for MEWP?

  • 3. Pre-use inspection completed?

12. MOBILE SCAFFOLD TOWERS (PASMA)

  • Complete section

  • 1. Towers erected/supervised by trained personnel?

  • 2. Mobile scaffold tower suitable and sufficient for the task being undertaken?

13. PODIUMS / LADDERS / STEPLADDERS

  • Complete section

  • 1. Correct podiums / ladders / stepladders in use?

  • 2. Podiums / ladders / stepladders in good condition? (missing feet, bent rungs, not cut shorter)

  • 3. Equipment used safely? (secured/footed/outriggers in place and extended)

14. LIFTING APPLIANCES (LOLER)

  • Complete Section

  • 1. Chains / slings/ lifting aids in good working order?

  • 2. Lift Plans in place?

  • 3. Certified operators/slingers/signaller (CPCS / NPORS)?

  • 4. Annual &/or 6 monthly inspection reports available?

  • 5. Are loads secured and is the lift being controlled?

  • 6. Are lifting accessories (slings, chains etc.) stored safely and tidily?

15.PLANT OPERATIONS - EXCAVATOR / DUMPERS / ROLLERS

  • Complete section?

  • 1. Operated by trained personnel (CPCS / NPORS)?

  • 2. Reversing aids - e.g. CCTV, mirrors? Is a banksman required? Is there an Exclusion Zone in operation?

  • 3. Plant maintained in good condition and daily pre-use inspection completed?

16. EXCAVATIONS

  • Complete section?

  • 1. Method Statements and U/G surveys available?

  • 2. Permit to Dig in place?

  • 3. Inspections carried out daily and recorded?

  • 4. U/G services located and marked i.e. CA Tool on site?

  • 5. Access/egress provided?

  • 6. Adjacent structures protected?

  • 7. Sides guarded – barriers, stop blocks?

  • 8. Shoring provided/sides battered or stepped/trench box?

  • 9. Edge protection erected along excavation edges?

  • 10. Is excavation warning signage displayed prominently?

  • 11. Are materials (steel, timber etc.) and excavated muck stored safely away from excavation edge?

17. STEEL FIXING

  • Complete Section

  • 1. Is steel fixing taking place is accordance with the RAMs?

  • 2. Is the correct level PPE being worn?

  • 3. Is there safe access (boards across mesh, steps etc._?

  • 4. Is exposed metalwork / rebar protected?

18. FALSEWORK/FORMWORK

  • Complete Section

  • 1. Is formwork being erected in accordance with the RAMs? Is the correct fixing being used for shutter installation?

  • 2. Are design drawings available?

  • 3. Is the falsework (decking) being erected in accordance with the appropriate RAMs (Alshor / Skydeck / GT deck)?

  • 4. Are harnesses being worn, in good condition, tagged and in date and is there a fall arrest system or appropriate anchor point in use?

  • 5. Are staff harness-trained to work on the leading edge?

  • 6. Are the leading edges installed as per the manufactures guidance?

19. STRIKING

  • Complete Section

  • 1. Is the striking taking place in accordance with the RAMs?

  • 2. Is there an exclusion zone in place and signage?

  • 3. Are staff working safely near or on the building edge (tool tethers used, materials stored away from the edge)

20. CONCRETE

  • Complete Section

  • 1. Is concrete being pumped / poured as per the RAMs?

  • 2. Are all members of staff involved with the concrete wearing the correct level of PPE?

  • 3. Have the COSHH assessments for concrete/cement been briefed to the concrete team?

  • 4. Is the pump line secured (if required) and are "R" clips fitted?

  • 5. Is the concrete lorry set up so as to cause no additional hazard to the site or general public?

  • 6. Is there means for disposal of any washout?

21. MANUAL HANDLING

  • Complete Section

  • 1. Is the hierarchy of control being used i.e. Task, Individual, Load, Environment?

  • 2. Mechanical means in use?

  • 3. Has manual handling training taken place?

22. ENVIRONMENTAL

  • Complete Section

  • 1. Is waste segregated into correct skips?

  • 2. Is dust being managed (suppression/extraction)? Is RPE available? Have staff been trained for the RPE?

  • 3. Are suitable COSHH storage facilities available? (fire point and suitable spill kit nearby (universal or chemical, not 'oil only).

  • 4. Are COSHH assessments available for all chemicals on site?

  • 5. Are spill kits available and adequate?

23. OCCUPATIONAL HEALTH

  • Complete Section

  • 1. First aid kits and eyewash available?

  • 2. Trained first-aiders on site sufficient for the number of operatives?

  • 3. Sufficient space for the number of personnel on site?

  • 4. Kept clean – floors, sinks, tables, appliances etc.?

  • 5. Suitable drinking water supply?

  • 6. Method for drying clothes provided?

  • 7. Hot & cold running water? Means of heating food?

24. DOCUMENTATION / INDUCTION

  • Complete Section

  • 1. Method statements & risk assessments available?

  • 2. Are sub-contractors working to their documented RAMs? Have the RAMs been reviewed and signed off?

  • 3. Regular site safety meetings/daily activity briefings?

  • 4. Induction information on site?

  • 5. Is the correct and latest documentation being used by the site team?

  • 6. Emergency procedures displayed?

  • 7. Regular toolbox talks taking place?

  • 8. Are all mandatory weekly inspections being completed and logged I.E. PUWER, LOLER, ladder inspections etc.

TRAINING RECORDS / TASK SPECIFIC TRAINING

  • 1. Are the training records in place and available in the site files / HSEQ Dropbox?

  • 2. How many operatives on site are trained in Working at Height / leading edge on site?

  • Please complete training booking request form JBS-H&S-FRM-0078 and send to Training@jbstructures.co.uk

  • Please state the names of operatives trained in Working at Height / Leading edge on site?

  • 3. How many operatives on site are trained in the safe use of a MEWP 3a (scissor lift) on site?

  • Please complete training booking request form JBS-H&S-FRM-0078 and send to Training@jbstructures.co.uk

  • Please state the names of operatives trained in Safe use of a MEWP 3a (Scissor Lift) on site?

  • 4. Is there adequate numbers trained in First Aid on site?

  • Please complete training booking request form JBS-H&S-FRM-0078 and send to Training@jbstructures.co.uk

  • Please state the names of operatives trained in First Aid on site?

  • 5. Is there adequate numbers trained in Temporary Works on site?

  • Please complete training booking request form JBS-H&S-FRM-0078 and send to Training@jbstructures.co.uk

  • Please state the names of operatives trained in Temporary Works on site?

  • 6. Is there an adequate number of trained slinger /signallers on site?

  • Please complete training booking request form JBS-H&S-FRM-0078 and send to Training@jbstructures.co.uk

  • Please state the names of operatives trained in NPORS / CPCS Slinging / signaller on site?

COMPLETION

  • Auditor's name and signature:

  • Site manager's name and signature:

CLOSE OUT

  • undefined

  • Select date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.