Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Load out crew leader or point person on site
-
Prepared by
-
Location
-
Personnel
Preloading Evaluation
-
Weight of Swine
-
Number of Swine
-
Cut of the Barn
-
# of people on load out crew
-
Proper footing in loading chute?
-
Describe
-
Chute in good repair?
-
Describe
-
Permanent Chute?
-
Describe
-
Covered chute?
-
Describe
-
Insert pictures of chute to show angles, corners, lights, shadows, etc.
Environment
-
Outside Temperature
-
Weather conditions
Driver
-
Name of Driver/Company
-
Arrival Time
-
Departure Time
-
Trailer Boarded Correctly?
-
Describe
-
Trailer Bedded Correctly?
-
Describe
-
Sprinkler used?
-
Type of Trailer
-
Condition of Trailer
-
Position of Driver
-
Number of Head moved per group (by driver)
-
Driver's Attitude
-
Description of vocalization by driver
-
Sorting Tools used by Driver
Time/Logistics
-
Time First Pig Loaded
-
Time Last Pig Loaded
-
Total Loading Time
-
Estimated Drive Time to the Plant (Plant Name)
-
Scheduled Dock Time
Facilities
-
Describe lighting/shadows
-
Insert photos if helpful
-
Describe the panels/gating leading up to the chute and/or truck door
-
Insert photos if helpful
-
Describe any angles, corners, and/or sharp turns that the pigs encounter
-
Insert photos if helpful
-
Describe the general appearance/property management of the site
-
Insert photos if helpful
Tools and Vocalization
-
Describe tools in use in barn
-
Describe vocalization of swine
-
Evaluation of Hot Shot Usage
Loading/Handling
-
Describe Loading Crew's Attitudes
-
Describe Employee Vocalization
-
Number of head moved per group (by crew)
-
Location in barn where swine were loaded from
-
Longest Distance swine were moved
-
Describe handling of any NAs or Stressed Swine
-
Describe any issues with slips, falls and/or piles and where they occurred in the barn chute
-
Insert pictures if helpful
-
Signature of JBS Field Manager