Risk Assessment Performed by:
DESCRIPTION
-
Risk Assessments for Public Safety Near NB Power Hydro Facilities
Purpose
This document has been prepared for use in helping to manage public safety in and around waterways associated with NB Power’s Hydro facilities.
The Hydro group requires a formal risk assessment of all known public interaction at all water conveyance structures to ensure controls are in place to reasonably protect the public from hazards associated with the facility. This accountability lies with the Plants Manager.
Introduction
This document will provide the Hydro management results of a formal standardized risk assessment around hydroelectric facilities and control dams.
The risk assessment process identifies the hazards, as well as, the degree to which the public is exposed. The risk assessment provides a means of documenting the rationale for making decisions to institute operating procedures and physical control measures to protect the public. The Risk Rating, resulting from the risk assessment influences the extent of control measures required.
The Canadian Dam Association’s Guidelines for Public Safety Around Dams 2011 was used as a guide to develop the methodology to carry out these assessments.
It is proposed that there should be a formal standardized risk assessment, meeting the requirements of this document, completed for all hydro water conveyance structures every 3 years. This risk assessment should be completed for all water conveyance structures with attention to whether:
○ The degree of public interaction has changed for a specific public interaction;
○ The potential consequence has changed for a specific public interaction;
○ New public interactions exist; or
○ Operating procedures have changed.
LOCATION 1
-
Locations
- Upstream
- Headpond
- Forebay / Intake
- Structure
- Spillway
- Tailrace
- Downstream
- Gorge
-
Activities From Water / Ice
-
Boating (under power) / Jet Ski
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Sailing
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Windsurfing
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Canoeing / Kayaking / Rowing
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Waterskiing
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Scuba Diving
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Swimming / Diving
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Ice Fishing
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Snowmobiling
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Other
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Activities From Shore / Structure
-
Fishing from Shore
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Walking / Hiking
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Camping / Picnicking
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
ATV / Dirt Biking
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Skiing
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Snowshoeing
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Driving
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Bicycling
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Scuba Diving
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Swimming / Diving
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Boat Launching / Ramp
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Hunting
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Jumping / Climbing
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Flying
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Other
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Areas of Improvement
LOCATION 2
-
Locations
- Upstream
- Headpond
- Forebay / Intake
- Structure
- Spillway
- Tailrace
- Downstream
- Gorge
-
Activities From Water / Ice
-
Boating (under power) / Jet Ski
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Sailing
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Windsurfing
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Canoeing / Kayaking / Rowing
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Waterskiing
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Scuba Diving
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Swimming / Diving
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Ice Fishing
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Snowmobiling
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Other
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Activities From Shore / Structure
-
Fishing from Shore
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Walking / Hiking
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Camping / Picnicking
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
ATV / Dirt Biking
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Skiing
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Snowshoeing
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Driving
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Bicycling
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Scuba Diving
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Swimming / Diving
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Boat Launching / Ramp
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Hunting
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Jumping / Climbing
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Flying
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Other
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Areas of Improvement:
LOCATION 3
-
Locations
- Upstream
- Headpond
- Forebay / Intake
- Structure
- Spillway
- Tailrace
- Downstream
- Gorge
-
Activities From Water / Ice
-
Boating (under power) / Jet Ski
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Sailing
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Windsurfing
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Canoeing / Kayaking / Rowing
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Waterskiing
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Scuba Diving
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Swimming / Diving
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Ice Fishing
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Snowmobiling
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Other
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Activities From Shore / Structure
-
Fishing from Shore
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Walking / Hiking
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Camping / Picnicking
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
ATV / Dirt Biking
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Skiing
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Snowshoeing
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Driving
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Bicycling
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Scuba Diving
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Swimming / Diving
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Boat Launching / Ramp
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Hunting
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Jumping / Climbing
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Flying
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Other
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Areas of Improvement:
LOCATION 4
-
Locations
- Upstream
- Headpond
- Forebay / Intake
- Structure
- Spillway
- Tailrace
- Downstream
- Gorge
-
Activities From Water / Ice
-
Boating (under power) / Jet Ski
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Sailing
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Windsurfing
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Canoeing / Kayaking / Rowing
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Waterskiing
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Scuba Diving
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Swimming / Diving
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Ice Fishing
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Snowmobiling
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Other
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Activities From Shore / Structure
-
Fishing from Shore
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Walking / Hiking
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Camping / Picnicking
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
ATV / Dirt Biking
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Skiing
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Snowshoeing
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Driving
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Bicycling
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Scuba Diving
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Swimming / Diving
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Boat Launching / Ramp
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Hunting
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Jumping / Climbing
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Flying
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Other
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Areas of Improvement:
LOCATION 5
-
Locations
- Upstream
- Headpond
- Forebay / Intake
- Structure
- Spillway
- Tailrace
- Downstream
- Gorge
-
Activities From Water / Ice
-
Boating (under power) / Jet Ski
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Sailing
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Windsurfing
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Canoeing / Kayaking / Rowing
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Waterskiing
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Scuba Diving
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Swimming / Diving
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Ice Fishing
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Snowmobiling
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Other
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Activities From Shore / Structure
-
Fishing from Shore
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Walking / Hiking
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Camping / Picnicking
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
ATV / Dirt Biking
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Skiing
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Snowshoeing
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Driving
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Bicycling
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Scuba Diving
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Swimming / Diving
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Boat Launching / Ramp
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Hunting
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Jumping / Climbing
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Flying
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Other
-
Potential Hazards
- Rapidly increasing water levels
- Rapidly increasing water flows
- Strong currents or undertows
- Frequently dry riverbed
- Presence of spillway with sluicegate
- Presence of spillway with stop logs
- Presence of discharge valve / pipe
- Submerged hydraulic jump
- Submerged underwater structures
- Remote control flow equipment
- Automatic control flow equipment
- Steep or slippery banks
- Falling from height >3 metres
- Pinching or crushing
- Thin ice
- Stranding
- Floating debris
- Flow or level changes as a result of mtce or operations
- Unrestricted access to the water
- Other
-
Risk Reduction Measures Present at the Time of Assessment
- Signage
- Public Education (local initiatives)
- Safety Buoys
- Safety Booms
- Audible Danger Signalling Devices
- Visual Danger Signalling Devices
- Fencing
- Vehicle Barricades
- Security Patrols
- 24/7 Video Surveillance
- Operational Controls (procedures)
- Other (define)
-
Incident Likelihood (probability)
-
Incident Severity (consequences)
-
Public Safety Risk Rating
-
Add media
-
Areas of Improvement: